Informs of Completion of Licensing Action for GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Crystal River Unit 3
ML20211L908
Person / Time
Site: Crystal River 
Issue date: 09/03/1999
From: Wiens L
NRC (Affiliation Not Assigned)
To: Cowan J
FLORIDA POWER CORP.
References
GL-92-08, TAC-M85541, NUDOCS 9909080289
Download: ML20211L908 (4)


Text

e

.pn otog UNITED STATES y

g NUCLEAR REGULATORY COMMISSION

'2

. WASHINGTON, D.C. 20555-0001

..... so!

Septa ner 3, 1999 Mr. ' John Paul Cowan -

' Vice President, Nuclear Operations Florida Power Corporation 1 ATTN: Manager, Nuclear Licensing (NA18)

Crystal River Energy Complex 15760 W. Power Line Street Crystal River, Florida 34428-6708

SUBJECT:

COMPLETION OF LICENSING ACTION FOR GENERIC LETTER 92-08, "THERMO-LAG 330-1 FIRE BARRIERS," DATED DECEMBER 17,1992, FOR CRYSTAL RIVER UNIT 3 (TAC NO. M85541) i i

Dear Mr. Cowan:

By letters dated April 15 and November 24,1993, February 9, October 31, and December 20,

- 1994, January 6, March 28, May 17, July 6, August 8, September 22, September 26, December 21,1995, September 27,1996, January 29 and July 26,1997, and April 10,1998, Florida Power Corporation (FPC) responded to Generic Letter (GL) 92-08, "Thermo-Lag 330-1 Fire Barriers," dated December 17,1992, and follow-up requests for additional information dated October 21 and December 22,1993, September 23 and December 28,1994, and April 7

' and May 12,1995, in regard to Thermo-Lag 330-1 fire barriers installed at Crystal River Unit 3 J

(CR-3).

. The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed your letters. The FPC

responses stated that the Thermo-Lag resolution strategy for CR-3 consisted of four major activities: (1) Reanalysis activities to identify means of reducing reliance on Thermo-Lag fire i

barriers either by analysis or plant modifications; (2) Identification of any installed g

configurations that were fror 3-hour fire rated barriers and configurations that could, with i

. minor upgrades, be' qualified as 1-or 3-hour fire rated barriers; (3) Use of Mecatiss as an overlay material to Thermo-Lag or as a replacement fire barrier material; and (4) Identification of Thermo Lag configurations that were acceptable either "as is" or that would be acceptable with additional fire protection features.. This last activity would provida lustification for any f

necessary exemption requests. These activities were scheduled to be corm lated by June 30, 9 2000. The staff issued a Confirmatory Order Modifying License on May 21,1998 confirming FPC's commitment for the schedule to complete implementation of Thermo-Lag 330-1 fire

' barriers corrective actions.- On the basis of its review, the staff has determined that FPC has 1

provided the information requested in GL 92-08 and the actions tracked by TAC No. M85541 are complete.

l

- Please advise the staff in writing if you change resolution plans described in your submittals.

Include the basis for the changes. In addition, in accordance with GL 92-08, please adv;se the staff in writing when the actions described in your subr'nittals have been implemented.

GL 92-08 provides the Office of Management and Budget clearance for this information request.

..c g

9909000289 990903 F

.g pW i

PDR ADOCK 05000302

'p -

p PDR j

p 7

0 bD

,s John P. Cowan You should retain all documentation related to the resolution of the concerns with Thermo-Lag 330-1 fire barrier systems for future NRC audits or inspections. This documentation should include an evaluation of the ampacMy impact of the previously installed Thermo-Lag material on cable life of safety-related circuits, if you have any questions regarding this matter, please contact me at (301) 415-1495.

Sincerely, Leonard A. Wiens, Senior Project Manager, Section 2 Project Directorate 11 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-302 cc: See next page '

{

1 Mr. John Paul Cowan CRYSTAL RIVER UNIT NO. 3 Florida Power Corporation

)

cc:

Mr. R. Alexander Glenn Chairman Corporate Counsel (MAC-BT15A)

Board of County Commissioners Florida Power Corporation Citrus County P.O. Box 14042 110 North Apopka Avenue i

St. Petersburg, Florida 33733-4042 invemess, Florida 34450-4245 Mr. Charles G. Pardee, Director Ms. Sherry L. Bemhoft, Director Nuclear Plant Operations (PA4A)

Nuclear Regulatory Affairs (NA2H)

Florida Power Corporation Florida Power Corporation Crystal River Energy Complex Crystal River Energy Complex 15760 W. Power Line Street 15760 W. Power Line Street Crystal River, Florida 34428-6708 Crystal River, Florida 34428-6708 Mr. Michael A. Schoppman Senior Resident inspector Framatome Technologies Inc.

Crystal River Unit 3 1700 Rockville Pike, Suite 525 U.S. Nuclear Regulatory Commission Rockville, Maryland 20852 6745 N. Tallahassee Road Crystal River, Florida 34428 Mr. William A. Passetti, Chief Department of Health Mr. Gregory H. Halnon Bureau of Radiation Control Director, Quality Programs (SA2C) 2020 Capital Circle, SE, Bin #C21 Florida Power Corporation Tallahassee, Florida 32399-1741 Crystal River Energy Complex 15760 W. Power Line Street Attorney General Crystal River, Florida 34428-6708 Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Mr. Joe Myers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100

?

I

h. ;

l

, Septensber 3,1999 John P. Cowan

~

You should retain all documentation related to the resolution of the concems with Thermo-Lag 330-1 fire barrier systems for future NRC audits or inspections. This documentation should include an evaluation of the ampacity impact of the previously installed Thermo-Lag material on cable life of safety-related circuits.

If you have any questions regarding this matter, please contact me at (301) 415-1495.

l l

Sincerely, l

Orginal signed by:

Leonard A. Wiens, Senior Project Manager, Section 2 l

Project Directorate 11 l

Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-302 cc: See next page DISTRIBUTION:

koncket File 3 PUBLIC Crystal R/F HBerkow -

SPeterson BClayton LWiens DOudinot AKugler OGC ACRS LWert, Rll JCalvo JHannon DOCUMENT NAME: G:\\PDll-2\\ CRYSTAL \\MPA85541.WPD To seceive e con r of thle deewnent, lnd oste in the bon?

'C' = Cosy without ettechment/ encload "E" = Copy with attachment / enclosure "N" = No copy OFFICE PDil-2\\PM P

PDil-2\\LA C

SPLB

/

r/

EElB PDll-2\\SC-af l

NAME LWierh BClayton /jou JHannok i

~

JCalvo

/7/f SRetersoh' DATE 08d99' 084%9 084199 w 58///99 A8D/99 OFFICIAL RECORD COPY gg 5

l l

..