May 1, 2019

SUBJECT:

NRC INSPECTION REPORT NO. 05000302/2019001, DUKE ENERGY FLORIDA, LLC, CRYSTAL RIVER UNIT 3, CRYSTAL RIVER, FLORIDA

Dear Mr. Hobbs:

On April 8 - 12, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an on-site inspection under Inspection Manual Chapter 2561, Decommissioning Power Reactor Inspection Program," at the permanently shut down Crystal River Nuclear Plant Unit 3 (CR-3). The inspector examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and the conditions of your license. The inspection consisted of observations by the inspector, interviews with personnel, and a review of procedures and records. The results of the inspection were discussed with you and other members of the CR-3 staff on April 11, 2019, and are described in the enclosed report. No findings of safety significance were identified.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter, its enclosure(s), and your response will be made available electronically for public inspection in the NRC Public Document Room or from the NRC document system (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.

Current NRC regulations and guidance are included on the NRC's website at www.nrc.gov; select Radioactive Waste; Decommissioning of Nuclear Facilities; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRC's website at www.nrc.gov; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under 'Related Information'). You may also obtain these documents by contacting the Government Printing Office (GPO) toll-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays). No reply to this letter is required. Please contact Katherine Warner, at 610-337-5389, if you have any questions regarding this matter.

Sincerely,

/RA/

Raymond J. Powell, Chief Decommissioning, ISFSI, and Reactor HP Branch Division of Nuclear Materials Safety Docket No. 05000302 License No. DPR-72 Enclosure: Inspection Report 05000302/2019001 w/Attachment cc w/encl: Distribution via ListServ

EXECUTIVE SUMMARY

Duke Energy

Crystal River Nuclear Plant NRC Inspection Report No. 05000302/2019001 An announced CR-3 decommissioning on-site inspection was performed April 8 - 12, 2019.

The inspection included performance of confirmatory surveys and a review of occupational radiation exposure. The inspection consisted of observations by the inspector, interviews with Duke Energy personnel, a review of procedures and records, and plant walk-downs. The NRC's program for overseeing the safe operation of a shut-down nuclear power reactor is described in Inspection Manual Chapter (IMC) 2561, Decommissioning Power Reactor Inspection Program."

Based on the results of this inspection, no findings of safety significance were identified.

ii Inspection Report No. 05000302/2019001

REPORT DETAILS

1.0 Background On February 20, 2013, Duke Energy sent a letter [Agency Documentation and Management System Accession Number ML13056A005] to the NRC certifying the permanent cessation of activities and certifying that the fuel had been permanently removed from the reactor. This met the requirements of 10 Code of Federal Regulations (CFR) 50.82(a)(1)(i) and 50.82(a)(1)(ii). CR-3 is currently in the SAFSTOR phase of decommissioning as described in IMC 2561. On January 22, 2019 Duke Energy submitted a license amendment request [ML19022A076] to the NRC requesting a partial site release of selected non-impacted areas from its Part 50 license.

2.0 SAFSTOR Performance and Status Review

a. Inspection Scope

[Inspection Procedures (IPs) 83750 and 83801 The inspector observed activities and reviewed documentation associated with occupational exposure and radioactive waste management to determine the effectiveness of site radiological programs. The inspector accompanied a CR-3 radiation protection (RP) technician during a plant walk-down that included: general area surveys, checking and verifying radiological postings, checking locked doors and gates, and general housekeeping. The inspector also toured the reactor building which included receiving a locked high radiation area briefing and entering the A/B letdown cooler room to check material conditions. The inspector reviewed 2018 dose totals, radiation work permits, and As Low As Reasonably Achievable (ALARA) work plans to verify work activities were pre-planned effectively to limit worker exposure.

The NRC contracted Oak Ridge Associated Universities (ORAU) to perform confirmatory surveys of the areas being considered for partial site release. The inspector reviewed the survey plan, attended pre-job briefs, and observed ORAU performing the surveys.

b. Observations and Findings

The inspector determined that pre-job briefings were thorough and identified the significant potential hazards for the activities to be performed. The inspector determined that survey records were clear and complete, and RP technicians used appropriate instruments for the surveys. The inspector verified technician training and qualifications were up to date. The inspector verified that ALARA plans were developed as needed and were effective in limiting worker exposure and that occupational dose for 2018 was acceptable for the scope of the radiological activities performed. The inspector noted the main decommissioning activities are the plant modifications preparing the site for dormancy.

The inspector observed ORAU perform surveys in accordance with the survey plan. The NRCs final determination regarding the partial site release will be made by NRC staff in the Office of Nuclear Material Safety and Safeguards after the issuance of the final confirmatory survey data and analysis.

Inspection Report No. 05000302/2019001

3.0

Exit Meeting Summary

On, April 11, 2019, the inspector presented the inspection results to Phyllis Dixon, Manager - Technical Support, and other members of Duke Energys staff. The inspector confirmed that proprietary information was not removed from the site.

Inspection Report No. 05000302/2019001 PARTIAL LIST OF PERSONS CONTACTED B. Akins, Manager - Radiation Protection and Chemistry D. Bartlett, Radiation Protection Technician C. Burtoff, Lead RP/Chemistry Scientist P. Dixon, Manager - Technical Support T. Hobbs, Decommissioning General Manager A. Maldonado, Radiation Protection Technician D. Summers, Radiation Protection Technician R. Tomczak, Chief Chemistry Technician M. Van Sicklen, Licensing ITEMS OPEN, CLOSED, AND DISCUSSED None LIST OF

DOCUMENTS REVIEWED

Audits and Reports

2161837, RP Focus Areas: 1) RAM Storage and Control, 2) Postings & Signs

234977, RP Program: Industrial Health, Rad Shipping and Respiratory Protection, September

27, 2018

254178, 2018 Radiation Protection Program Annual Review, January 28, 2019

19-01, Mini ALARA Work Plan- Install power and cameras at RB sump, install lighting in RB for

SAFSTOR 2, January 14, 2019

2018 Annual Exposure Report, March 23, 2019

Condition Reports

254890,

Miscellaneous

List of High Rad and Locked High Rad Areas

RWP 1048

Procedures

CR3M-PM-002, CR3 Radiation Protection Manual, Revision 2

HPS-1000, Radiation Protection - Conduct of Operations, Revision 2

Radiological Surveys

CR3-M-2018004-1

CR3-M-2018030-3

CR3-M-2019115-3

CR3-M-2019305-2

CR3-M-2019306-3

CR3-M-2019307-2

CR3-M-2019307-3

CR3-M-2019311-1

CR3-M-2019311-3

CR3-M-2019312-1

LIST OF ACRONYMS USED

ALARA As Low As Reasonably Achievable

CAP Corrective Action Program

CFR Code of Federal Regulations

CR-3 Crystal River Unit 3

Duke Energy Duke Energy Florida, Inc.

IMC Inspection Manual Chapter

IP Inspection Procedure

NRC U.S. Nuclear Regulatory Commission

PSDAR Post Shutdown Activities Report

RWP Radiation Work Permit

2