ML20210G855
| ML20210G855 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 07/27/1999 |
| From: | Boland A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Cowan J FLORIDA POWER CORP. |
| Shared Package | |
| ML20210G862 | List: |
| References | |
| 50-302-99-04, NUDOCS 9908030218 | |
| Download: ML20210G855 (2) | |
See also: IR 05000302/1999004
Text
I-
July 27,1999
Mr. John P. Cowan, Vice President
Nuclear Operations
Florida Power Corporation
ATTN: Manager Nuclear Licensing (NA1B)
Crystal River Energy Complex
15760 West Power Line Street
Crystal River, FL 34428-6708
SUBJECT:
NRC INSPECTION REPORT NO. 50-302/99-04
Dear Mr. Cowan:
'
This refers to the inspection conducted on May 23 through July 3,1999, at the Crystal River
facility. The enclosed report presents the results of this inspection.
During the inspection period, yuur conduct of activities at the Crystal River facility was generally
characterized by safety-conscious operation,s, including well coordinated responses to emergent
equipment issues.
Based on the results of the inspection, the NRC has determined that one violation of NRC
requirements occurred. This violation is being treated as a Non-Cited Violation (NCV),
consistent with Appendix C of the Enforcement Policy. The NCV is described in the subject
inspection report. If you contest the violation or severity level of the NCV, you should provide a
response within 30 days of the date of this inspection report, with the basis for your denial, to the
Nuclear Regulatory Commission, ARN: Document Control Desk, Washington DC 20555-0001,
with copies to the Regional Administrator, Region ll, the Resident inspector at your facility, and
the Director, Office of Enforcement, United States Nuclear Regulatory Commission,
I
Washington DC 20555-0001.
In accordance with 10 CFR 2.790 of the NRC's Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room.
Sincerely,
(Original signed by Anne T. Boland)
Anne T. Boland, Acting Chief
Reactor Projects Branch 3
f
Division of Reactor Projects
('
h
}
Docket No. 50-302
License No. DPR-72
/
Enclosure: NRC inspection Report No. 50-302/99-04
1
cc w/ encl: (See page 2)
99000302f 8 ""M727
ADOCK @")O0302
G
\\
j
'
.
2
cc w/ encl:
Chairman
Charles G. Pardee, Director
Board of County Commissioners
Nuclear Plant Operations (PA4A)
Citrus County
Florida Power Corporation
110 N. Apopka Avenue
Crystal River Energy Complex _
inverness, FL 36250
' ,
15760 West Power Line Street
. Crystal River, FL 34428-6708
Michael A. Schoppman
Framatome Technologies
Sherry L. Bemhoft, Director -
1700 Rockville Pike, Suite 525
Nuclear Regulatory Affairs (NA2H)
Rockville, MD 20852-1631
Florida Power Corporation
Crystal River Energy Complex
i
15760 West Power Line Street
I
Crystal River, FL 34428-6708
Gregory H. Halnon, Director
Quality Programs (SA2C)
' Florida Power Corporation
Crystal River Energy Complex
15760 West Power Line Street
Crystal River, FL 34428-6708
R. Alexander Glenn
,
Corporate Counsel MAC - BT15A
Florida Power Corporation
j
P. O. Box 14042
St. Petersburg, FL 33733-4042
i
Attorney General
Department of Legal Affairs
The Capitol
Tallahassee, FL 32304
William A. Passetti
Bureau of Radiation Control
Department of Health and
,
Rehabilitative Services
2020 Capital Circle SE, Bin #C21
Tallahassee, FL 32399-1741
Joe Myers, Director
Division of Emergency Preparedness
Department of Community Affairs
2740 Centerview Drive
Tallahassee, FL 32399-2100
,
i