IR 05000302/2006001

From kanterella
Jump to navigation Jump to search
Inspection/Activity Plan - Crystal River Nuclear Plant (NRC Inspection Report 05000302/2006001)
ML060610266
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/02/2006
From:
Division Reactor Projects II
To:
Shared Package
ML060610250 List:
References
IR-06-001
Download: ML060610266 (1)


Text

Page 1 of 1 Crystal River 03/02/2006 11:19:09 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PS2-EP - EP EXERCISE 3 3 IP 7111401 Exercise Evaluation 04/24/2006 04/28/2006 Baseline Inspections 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 04/24/2006 04/28/2006 Baseline Inspections 3 IP 71151 Performance Indicator Verification 04/24/2006 04/28/2006 Baseline Inspections DRP-PIR - PI&R PRE-INSP VISIT 1 3 IP 71152B Identification and Resolution of Problems 05/15/2006 05/19/2006 Baseline Inspections DRP - PI&R 4 3 IP 71152B Identification and Resolution of Problems 06/05/2006 06/23/2006 Baseline Inspections EB3-HS - HEAT SINK 2 3 IP 7111107B Heat Sink Performance 07/09/2006 07/13/2006 Baseline Inspections PSB1-RP - RP PUBLIC PRE-INSP VISIT 1 3 IP 7112101 Access Control to Radiologically Significant Areas 11/13/2006 11/15/2006 Baseline Inspections EB1-MODS - MODIFICATIONS/10CFR50.59 3 3 IP 7111102 Evaluation of Changes, Tests, or Experiments 12/04/2006 12/08/2006 Baseline Inspections 3 IP 7111117B Permanent Plant Modifications 12/04/2006 12/08/2006 Baseline Inspections PSB1-RP - RP PUBLIC BASELINE 4 3 IP 7112101 Access Control to Radiologically Significant Areas 12/04/2006 12/08/2006 Baseline Inspections 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 12/04/2006 12/08/2006 Baseline Inspections 3 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 12/04/2006 12/08/2006 Baseline Inspections 3 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 12/04/2006 12/08/2006 Baseline Inspections 3 IP 71151 Performance Indicator Verification 12/04/2006 12/08/2006 Baseline Inspections PS2-EP - EP INSP 1 3 IP 7111402 Alert and Notification System Testing 04/23/2007 04/27/2007 Baseline Inspections 3 IP 7111403 Emergency Response Organization Augmentation Testing 04/23/2007 04/27/2007 Baseline Inspections 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 04/23/2007 04/27/2007 Baseline Inspections 3 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 04/23/2007 04/27/2007 Baseline Inspections 3 IP 71151 Performance Indicator Verification 04/23/2007 04/27/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL PRE-INSP VISIT 1 3 IP 7112101 Access Control to Radiologically Significant Areas 09/04/2007 09/06/2007 Baseline Inspections This report does not include INPO and OUTAGE activitie Enclosure This report shows only on-site and announced inspection procedures.