{{#Wiki_filter:. --- . .. __ .. . -.. - . -. - - _ -_- q @ LE:o p
- ,
UNITED STATES
- r j
NUCLEAR REGULATORY COMMISSION
SUBJECT:
OPERATIONAL SAFEGUARDS RESPONSE EVALUATION (INSPECTION NO. 50-302/98 201)
Dear Mr. Cowan:
On May 4-6,1998, NRC personnel evaluated Crystal River's physical protection program.
This evaluation was a result of questions raised during a Region 11 inspection in August 1997, as noted in NRC Inspection Report 50-302/97-10 of August 27,1997. The primary objective of the Operational Safeguards Response Evaluation (OSRE) program is to evaluate the readiness of a licensee's onsite security forces to respond to an external threat. That threat is defined in 10 CFR 73.1 as the NRC design basis threat. The overall criterion was Crystal River's ability to protect public health and safety.
i The NRC personnel were briefed on Crystal River's modified protection strategy, toured the plant to observe paths to key equipment and responder deployment positions, conducted !g three table-top, time-line armed response contingency drills, and observed a Crystal River armed response force team conduct three force-on-force exercises on site. The four specific sub-criteria used were: (1) did the response force provide a sufficient number of responders; (2) were they appropriately armed and equipped; (3) were they in protected -
positions; and (4) were they in time to interdict the mock adversary force.
f These sub-criteria were not fully met in the August 1997 exercises on site. In the May 1998 evaluation, it appeared that the protection strategy was adequate to protect against the design basis threat. However, some problems were observed in the execution of the strategy by the shift response team. These problems appeared to be the result of lack of practice by shift personnelin executing the strategy on site.
. Enclosure contains Upon removal of enclosure this document 18C[93 is DECONTROLLED. j 9902190011 990216 PDR ADOCK 05000302 r{.e ny . gph 7"f]m$. {.-{ G PDR gJ me, n - ~-- _ ~... __ _ -.- - - - - - - ~ ~ - l
,, ..... .... ......... _. _ ____, V Mr. l The briefings, observations, drills, and exercises indicated that the modified protection j . strategy was generally sound and that Crystal River has the capability to respond to an l
l external threat and protect public health end safety. Details are in the enclosure.
t ! The enclosure to this letter contains safeguards information of a type specified in 10 CFR l 73.21. It will not be placed in the Public Document Room, and must be protected against { i unauthorized disclosure.
i i I No response to this letter is required. If you have questions concoming this evaluation, we will be pleased to discuss them with you.
Sincerely, , Crisimal sisned by Theodore R. Quay, Chief Safeguards Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-302 cc w/ enclosure: Stephen J. Cahill USNRC ' 6745 N. Tallahasses' Road Crystal River, FL 34428 i Enclosure contains SAEEG.Ud!aD.S_1NED.RMAIIDE Upon removal of enclosure this document is DECONTROI t FD.
DISTRIBUTION W/ ENCLOSURE: Docket File 50-302 GSmith, R-l KBarr, M-Il PSGB OSRE Crystal River File JCreed, R-ill TDexter, R-IV DISTRIBUTION W/O ENCLOSURE: NRC PDR .PSGB R/F TOuay, NRR FHebdon, NRR DMatthews, NRR LWiens, NRR DOCNIENT NAME: At\\tRVFLWP.981
- See etteshed page for prerleus sensurrence
". i.. .e es. - - - m n., c c .is e - - - -- -r. e .es -
- _
, se. w.
, _ _ _ orr:CE PSGB:NRR IC RII lC PDII 3:ent IC Pse:Ima Ie l WAfE D0erik* LStretten* Filehden* T0usy P DATE 09/12/98 10/07/98 10/19/98 02/ VM9 SFflCIAL M cDB G PT - 6':
I . i _
.m., - .. _
. .-. - .....--. -. - _.. -. -. .-...--.-.. - --..- - - . _ . o , Mr. John Paul Cowan CRYSTAL RIVER UNIT NO. 3 Florida Power Corporation cc: Mr. R. Alexander Glenn Mr. Robert E. Grazio, Director Corporate Counsel Nuclear Regulatory Affairs (SA2A) Florida Power Corporation Florida Power Corporation MAC-A5A Crystal River Energy Complex P.O. Box 14042 15760 W. Power Line Street St. Petersburg, Florida 33733 4042 Crystal River, Florida 34428-6708 Mr. Charles G. Pardee, Director Senior Resident inspector
Nuclear Plant Operations (NA2C) Crystal River Unit 3 Florida Power Corporation U.S. Nuclear Regulatory Commission Crystal River Energy Complex 6745 N. Tallahassee Road 15760 W. Power Line Street Crystal River, Florida 34428 Crystal River, Florida 34428 6708 Mr. Gregory H. Halnon Mr. Robert B. Borsum Director, Quality Programs (SA2C) Framatome Technologies Inc.
Florida Power Corporation 1700 Rockville Pike, Suite 525 Crystal River Energy Complex Rockville, Maryland 20852 15760 W. Power Line Street ' Crystal River, Florida 34428-6708 Mr. William A. Passetti, Chief Department of Health Regional Administrator, Region ll Bureau of Radiation Control U.S. Nuclear Regulatory Commission 2020 Capital Circiel, SE, Bin #C21 61 Forsyth Street, SW., Suite 23T85 Tallahassee, Florida 32399-1741 Atlanta, GA 30303-3415 Attomey General Mr. Leonard D. Wert Department of Legal Affairs U.S. Nuclear Regulatory Commission The Capitol 61 Forsyth Street, SW., Suite 23T85 Tallahassee, Florida 32304 Atlanta, GA 30303-3415 Mr. Joe Myers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Chairman Board of County Commissioners Citrus County 110 North Apopka Avenue invemess, Florida 34450 4245 . -,v...wa, . ,~ww ~ }}