L October 15, 1990~
Docket flo. 50-302 DISTRIBUTION 164 i
NRC TTocal PORs i
PD22 R/F Mr. Percy M. Beard, Jr.
SVarga Senior Vice President, Glainas j
Nuclear Operations DMiller
~
Florida Power Corporation HSilver ATTN: Manager, Nuclear Operations OGC Licensing EJordan P. O. Box 219.HA.21 ACRS(10)
Crystal River, Florida 32629 HBerkow
Dear Mr. Beard:
SUBJECT:
CRYSTAL RIVER UNIT 3. TECHNICAL SPECIFICAT'Ori CHANGE REQUEST NO. 170, PRESSURE / TEMPERATURE LIMITS REPORT (TAC NO. '4374)
By letter dated July 26, 1989, as revised October 31, 1989, you submitted Technical Specification Change Request No. 170, which proposed removing fluence dependent pressure / temperature limits from the Technical Specifications and relocating them to a Pressure / Temperature Limits Report. This issue has been a subject of discussion at several meetings between the staff and industry in connection with the Ter.hnical Specification Improvement Program. The current staff position is that a'.though the fluence-dependent limits may be-removed from the Technical Specificacions, they must still be revbed and approved by the staff before they con be implemented. Ac ou know, your proposal does not provide r
for prior staff approval of these limits.
l Because of this furdamental difference in our positions, we have decided that the bett course is to suspend action on your change request until'c suitable i
solution can be worked out within the framework of the Technical Specification Improvement Program. When an acceptable solution to this point of contention has been reached, we will re-initiate action on your request, or your submittal may be revised, and a new TAC will be opened at that time. This completes our action on TAC 74374. If you have any questions, please contact me..
Sincerely, Original signed by Harley Silver,- Project Manager -
Project Directorate 11 2
-,J N.
Division of Reactor Projects - 1/11 v%
Office of Nuclear Reactor-Regulation cc: See next page d LN (VC T0b Ob lo[l5lTo 0FC
- LA:PDll-2
- PE:PDII-2f.....:PM:J(M2
- D:PDII-2
- EMCB:DET 4
_... :..g HB6r4
- CYChen{f (
NAME
- DMiller
- GW
- jkd f
DATE
- / /90
- /8//f/90
- h/g90 -
- /0//[/90
- p/g/90' OFFICIAL RECORD COPY Document Name: TS CHANGE CR3 P/T LIMITS 9010250220 901015
' {0\\
DR ADOCK 050003o2 PDC sj J
o
s..
- Mr. Percy M. Beard, Jr.
Crystal River Unit No. 3 Nuclear -
Florida Power Corporation Generating Plant cc:
Mr. A. H. Stephens State Planning and Development General Counsel Clearinghouse Florida Power Corporation Office of Planning ano Budget MAC - A50 Executive Office of the Governor P. O. Box 14042 The Capitol Building St. Petersburg, Florida 33733 Tallahassee, Florida 32301 Mr. P. F. McKee, Director Chairman fluclear Plant Operations Board of County Commissioners-Florida Power Corporation Citrus County P. O. Box 219-hA-2C 110 North Apopka' Avenue Crystal River, Florida 32629 Inverness, Floride 32650' Mr. Robert B. Borsum Mr. Rolf C. Widell, Director Babcock & Wilcox Nuclear Operations Site Support Nuclear Power Generation Division Florida Power Corporation 1700 Rockville Pike, Suite 525 P.O. Box 219-NA-21 Rockville, Maryland 20852 Crystal River, Florida 32629 Senior Resident Inspector Mr. Gary L. Boldt Crystal River Unit 3 Vice President, Nuclear Production U.S. Nuclear Regulatory Commission Florida Power Corporation i
6745 N. Tallahassee Road P. O. Box 219-SA-2C Crystal River, Florida 32629 Crystal River, Florida -32629 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900
(
Atlanta, Georgia 30323 l
Hr. Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.
Tallahassee, Florida 32399-0700 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, F lorida 32301 l
Attorney General Department of Legal Affairs The Capitol-Tallahassee, Florida 32304
-n.,-
e we~ ~ ~ ~ - - -