ML20140G026

From kanterella
Revision as of 16:28, 11 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-295/97-08 & 50-304/97-08 on 970317-21 & NOV
ML20140G026
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 04/30/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Mueller J
COMMONWEALTH EDISON CO.
Shared Package
ML20140G029 List:
References
50-295-97-08, 50-295-97-8, 50-304-97-08, 50-304-97-8, NUDOCS 9705060213
Download: ML20140G026 (2)


See also: IR 05000295/1997008

Text

. -

- -

.-

..

_ . - . . ..

. -

.

..

.

.-

I.

cod

w

.

4

k

,

April 30,1997

l

l

l

l

Mr. J. H. Mueller

Site Vice President

Zion Generating Station

Commonwealth Edison Company

101 Shiloh Boulevard

Zion, IL 60099

SUBJECT:

NRC EMERGENCY PREPAREDNESS INSPECTION REPORTS 50-295/97008

'

(DRS); 50-304/97008(DRS) AND NOTICE OF VIOLATION

Dear Mr. Mueller:

On March 21,1997, the NRC completed an inspection at your Zion Generating Station

i

Units 1 and 2. The enclosed report presents the results of that inspection.

Areas examined during the inspection are identified in the report. Within these areas, the

inspection consisted of a selective examination of procedures and representative records,

l

interviews with personnel, and observation of activities in progress.

l

This inspection was to perform the emergency preparedness core inspection in NRC

Inspection Procedure 82701 and review the status of previous open inspection findings.

The report's Executive Summary provides an overview of our assessment of your

performance in Emergency Preparedness, an aspect of Plant Support. At the conclusinn of

the inspection the findings were discussed with those members of your staff identified in

the report.

l

The overall effectiveness of your emergency preparedness facilities, equipment, training,

l

and functional organization was good. Plant personnel had performed conservatively

I

during actual activations of the Emergency Plan, and emergency response facilities were

well-maintained. Quality assurance oversight of the program was also generally good.

Based on the results of this inspection, the NRC has determined that a violation of NRC

requirements occurred relative to failure to assess the adequacy of offsite interface during

,

'

the annual review of the Emergency Preparedness program. This violation is cited in the

enclosed Notice of Violation (Notice), and the circumstances surrounding it are described

in detail in the subject inspection report.

\\

l

t

,

!

9705060213 970430

/ 3[

ADOCK0500g5

DR

t

,

b

. - _ . . _ . _

_._ _

__ _ _,- _ _ _ - _ - _ _ . _ ._._ _ . _-- _ . _ _ _ _ _ _ . _

, ' *

b

~

'a

J. H. Mueller

-2-

April 30,

1997

\\

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter,

'

the enclosure (s), and your response (s) to this letter will be placed in the NRC Public

Document Room.

,

1

Sincerely,

/s/ Geoffrey E. Grant

Geoffrey E. Grant, Director

Division of Reactor Safety

Docket Nos. 50-295; 50-304

Licenses No. DPR-39; DPR-48

Enclosures:

1. Notice of Violation

2. Inspection Reports 50-295/97008(DRS); 50-304/97008(DRS)

cc w/encis:

T. J. Maiman, Senior Vice President,

Nuclear Operations Division

D. A. Sager, Vice President,

Generation Support

H. W. Keiser, Chief Nuclear

Operating Officer

R. Starkey, Plant General Manager

R. Godley, Regulatory Assurance

Supervisor

I. Johnson, Acting Nuclear

Regulatory Services Manager

Document Control Desk - Licensing

Richard Hubbard

Nathan Schloss, Economist,

'

Office of the Attorney General

Mayor, City of Zion

State Liaison Officer, Wisconsin

State Liaison Officer

Chairman, Illinois Commerce Commission

Distribution:

Docket File w/encls

SRis, Zion, Braidwood,

Rlli Enf. Coordinator w/encls

PUBLIC IE-35 w/encIs

Byron w/encls

R. A. Capra, NRR w/encls

OC/LFDCB w/encls

G. E. Grant, Rlli w/encIs

TSS w/encls

DRP w/encls

LPM, NRR w/encls

CAA1 w/encls

DRS w/encls

A. B. Beach, Rlil w/encls

L

Rill PRR w/encls

C. D. Pederson, Rlll w/encls

!

DOCUMENT NAME: G:DRS\\ZIO97008.DRS

i

v.

  • . .

y .e es. 4

m. we.m. i. m. wn: c - c,y wmiout .ti.*n.nu.nm

r - c,y wm> mi.*

nu.nm

-

r -n..ev

i

OFFICE

Rill

E

Rill

l s, R O fgj

lV

Rill

_l

l

NAME

JFoster:jp dg

RJickling g(

JC M

MLeach/GW

DATE

04/ ///07

04/7 /97

Off/Q /97

04/20/97 ( )(J _

"

' DEsp.gof

'

'// z / f

f

!

__

.

._

_

- .

.