Notice of Violation from Insp on 970317-21.Violation Noted: Review of EP Program in Site Quality Verification Audit Qaa 22-95-04, Generating Station Emergency Plan Did Not Address Adequacy of Offsite Interface W/State of Il
ML20140G037
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 04/30/1997
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20140G029 List:
References
50-295-97-08, 50-295-97-8, 50-304-97-08, 50-304-97-8, NUDOCS 9705060218
Download: ML20140G037 (2)


Text

_ _ _ _ _ _ _. _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ . . _ _ _ _ . _ _ _ _ _ _

i .

NOTICE OF VIOLATION I.

Commonwealth Edison Docket Nos. 50-295: 50-304 Zion Nuclear Generating Station License Nos. DPR-39; DPR-48 j During an NRC inspection conducted on March 17-21,1997, a violation of NRC L requirements was identified. In accordance with the " General Statement of Policy and j Procedure for NRC Enforcement Actions," NUREG-1600, the violation is listed below: j

?

10 CFR 50.54(t) requires, in part, that the annual review of the EP program shall include an evaluation for adequacy of interfaces with State and local governments and of licensee

! drills, exercises, capabilities, and procedures.

] Contrary to the above, annual reviews of the Emergency Preparedness program, contained  ;

i in Site Quality Verification Audit QAA 22-95-04, " Generating Station Emergency Plan," l dated July 28,1995, and Site Quality Verification QAA 22-96-08, " Audit of Generating Station Emergency Plan (GSEP)," dated July 25,1996, did not address the adequacy of the offsite interface with the State of Illinois.

This is a Severity Level IV violation (Supplement Vill). (50-295/304/97008-03)

Pursuant to the provisions of 10 CFR 2.201, Commonwealth Edison is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, I ATTN: Document Control Desk, Washington, D.C. 20555 with a copy to the Regional Administrator, Region lil, and a copy to the NRC Resident inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved. Your response may reference or include previous docketed correspondence, if the correspondence adequately addresses the required response. If an adequate reply is not received within the time specified in this Notice, an order or a Demand for Information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken. Where good cause is shown, consideration will be given to extending the response time.

Under the authority of Section 182 of the Act,42 U.S.C. 2232, this response shall be submitted under oath or affirmation.

Because your response will be placed in the NRC Public Document Room (PDR), to the extent possible, it should not include any personal privacy, proprietary, or safeguards information so that it can be placed in the PDR without redaction. If personal privacy or proprietary information is necessary to provide an acceptable response, then please provide a bracketed copy of your response that identifies the information that should be protected and a redacted copy of your response that deletes such information. If you request withholding of such material, you mual specifically identify the portions of your response that you seek to have withheld and provide in detail the bases for your claim of

~

9705060218 970430 PDR ADOCK 05000295 G PDR

l -

Notice of Violation  !

l withholding (e.g., explain why the disclosure of information will create an unwews i invasion of personal privacy or provide the information required by 10 CFR 2.76: 1-)

support a request for withholding confidential commercial or financial informatic.. b safeguards information is necessary to provide an acceptable response, please provice the j level of protection described in 10 CFR 73.21.

Dated at Lisle, Illinois this 30th day of April 1997 l