ML20058H055

From kanterella
Revision as of 17:44, 3 June 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards List of Unimplemented Gsis,Per Generic Ltr 90-04
ML20058H055
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 11/01/1990
From: Bournia A
Office of Nuclear Reactor Regulation
To: Gates W
OMAHA PUBLIC POWER DISTRICT
References
TASK-***, TASK-OR GL-90-04, GL-90-4, NUDOCS 9011140217
Download: ML20058H055 (4)


Text

.. .

November 1,.1990 Docket No. 50 285 Mr. W. Gary Gates Division Manager Nuclear Operations-Omaha Public Power District 444 South 16th Street Mall.

Mail Stop 8E/EP 4 Omaha, Nebraska 68102-2247

Dear Mr. Gates:

SUBJECT:

UNIMPLEMENTED GENERIC SAFETY ISSUES AT FORT CALHOUN STATION,' UNIT'l On April 25, 1990, the staff issued Generic Letter 90-04 which requested infor -

mation concerning the implementation status:of certain generic safety issues (GSis) at your facility. Based on your response to this Generic Letter,_ dated _

June 29, 1990, our own records, and discussions with your staff, we have updated our database on GSI implementation status. The results of.this effort were -

presented to the Commission at a meeting on October 25, 1990.

The enclosure to this letter summarizes the staff's understanding of the current status' of those GSis which remain unimplemented at Fort Calhoun Station, Unit 1. We appreciate the assistance you provided in responding to Generic Letter 90 04 and we encourage-your timely completion of those GSis-listed in the enclosure.

Please contact me if you have any questions or comments about the enclosed information.

Sincerely, ORIGINAL SIGNED BY:

Anthony Bournia,-Senior Project' Manager Project Directorate IV-1 Division.of Reactor Projects . III, IV, Y and Special Projects

-Office of Nuclear Reactor Regulation.

Enclosure:

As stated- n,.

as cc w/ enclosure:

See next page DISTRIBUTION 0049etJiled T. Quay PD4 1' Plant File M. Virgilio M513E4~

NRC PDR L. Berry OGC MS15B18 .

E. Jordan MNBB'3701 Local PDR .A. Bournia ACRS_(10)-MS P-315 D.' Miller MS14H20' PD4-1 Reading R. Scholl MS13E4 0FC :PD4 1/LA- :PD4-1/P3 :PD4 1  :-  :  :=

......:.......g .....:.....gJ......:.....p/D

ABournia
1h

'NAME :LBerry ) :TQuay  :  :  :

D AT E ' d Y/ 90 h. . . . .:P/30/90- . . . . . . : . . . :0/I/90-

. . . . . . . . . . .: : . . ~. . . . . .-:.. . . . : . . . . . .: . . . . . . . . : . . . . . . . .

OFFICTM RECORD COPY Document Name: 6EMERIC 5AFETY ISSUE CALHOUN; 9011140217 9011ct '

fE PDR P

ADOCK 05000285 f' \-

PDC

F

l

[foping[0,,

e g

UNITED STATES -

NUCLEAR REGULATORY COMMISSION -

WASHINGTON, D C. 20605

  • l

' November 1,'1990-Docket No. 50-285 I

Mr. W. Gary Gates Division Manager - Nuclear Operations Omaha Public Power District t 444 South 16th Street Mall Mail Stop 8E/EP 4 Omaha, Nebraska- 68102-2247  ;

Dear Mr. Gates:

SUBJECT:

UNIMPLEMENTED GENERIC SAFETY ISSUES AT FORT CALHOUN STATION, UNIT l' On April 25, 1990, the staff issued Generic Letter 90-04 which requested infor-mation concerning the implementation status of certain generic-safety issues (GSIs) at your f acility. Based on your response to this Generic Letter, dated , "

1 June 29,1990, our own records, and discussions with your. staff, we have updated our database on GSI implementation status. The results of this effort were presented to the Comission at a meeting on October 25, 1990.

The enclosure to this letter sumarizes the staff's understanding of the current status of'those GSIs which remain unimplemented at Fort Calhoun-Station, Unit 1. We appreciate the assistance you provided-in responding to Generic Letter 90-04 and we encourage your timely completion of those GSIs listed in the enclosure.

Please contact me if you have any questions or comments about the enclosed >

information.

Sincerely, (l, 5 w sy hMLuw '

Anthony Bournia, Senior Project Manager l Project Directorate IV-1 Division of Reactor Projects :III, IV, V and Special Projects-Office of Nuclear Reactor. Regulation

~

Enclosure:

As stated I l

cc w/ enclosure:

See next page L

g l

    • . .. j i

. Mr. W. Gary Gates .

1 Omaha Public Power District. Fort Calhoun Station, Unit No. 1 i cc:

Harry H. Voigt, Esg.

LeBoeuf, Lamb, Leiby & MacRae 1333-New Hampshire Avenue, NW.

Washington, D.C. 20036 Mr. Jack Jensen, Chairman l Washington County Board of Supervisors Blair, Nebraska 68008 Mr. Raymond P. Mullikin,' Resident inspector : '

U.S. Nuclear Regulatory Commission  !

Post Office Box 309 '

Fort Calhoun, Nebraska 68023 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion-Engineering, Inc.

-12300 Twinbrook Parkway, Suite 330 Rockyille, MD 20852

-Regional Administrator, Region IV i U.S. Nuclear Regulatory Comission Office of Executive Director for Operations 611 Ryan Plaza Drive,; Suite 1000 '

Arlington, Texas .76011  ;

Harold Borchert, Director Division of Radiological Health 1 Nebraska Department of Health 301 Centennial Mall, South  ;

Post Office Box 95007 i Lincoln, Nebraska- 68509 '

Mr. T. L. Patterson, Manager Fort Calhoun Station Post Office Box 399 Fort-Calhoun, Nebraska 68023 1

l l

1

    • .. .- . I, j

ENCLOSURE j 1

UNIMPLEMENTED GSIs AT FORT CALHOUN STATION . UNIT 1 l

PROJECTED IMPLEMENTATION GSI NO. TITLE DATE REMARKS i 43 . Reliability of Air 02/01/91- Additional work

-is needed to Systems complete the '

verification.-

51 Improving the Reliability 12/31/91 Some work has' -

of Open-Cycle Service been completed Water Systems during 1990 refueling outage.

Remaining. actions will be completed  !

during 1991 .i refueling. outage.