Forwards Insp Rept 50-219/90-20 on 901022-26.No Violations Noted.Review of Preparations for Drywell Occupancy During Fuel Movement Identified Areas of Concern
ML20058J045
Person / Time
Site: Oyster Creek
Issue date: 11/09/1990
From: Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Fitzpatrick E
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20058J048 List:
References
NUDOCS 9011270158
Download: ML20058J045 (3)


See also: IR 05000219/1990020

Text

___ _ .

a I

n -w

' 1

, , ,

< l

,

. i

I

.. 3

)

f!0V 0 0107J

I

Docket No. 50-219

1

GPU Nuclear Corporation 1

A'ITN: Mr. Eugene E. Fitzpatrick

Vice President and Director

Oyster Creek Nuclear Generating Station

P. O. Box 388

Forked River, New Jersey 08731

Gentlemen:

Subject: Inspection No. 50-219/90 20

A routine, unannounced inspection of the radiological controls program at your facility was

conducted by S. Sherbini of this office and M. Kunowski of NRC Region 111 on October 22 - l

26,1990. Mr. Kunowski participate <l in the inspection as part of a mutual assistance I

program between the regions. Areas reviewed during this inspection are described in the NRC  !

Region i Inspection Report enclosed with this letter. Within these areas, the inspection s

included the status of previously identified items, preparations for the upcoming 13R  ;

'

refueling outage, the internal exposure control program, and procedures for controlling work

in the drywell during fuel movement. Tours of the facility and observation of ongoing work

were also conductx!.

!

Within the scope of this inspection, no violations were identified. Tours of the facility and

obwrvation of ongoing work activities indicated good housekeeping efforts and good control

of activities within the radiological controls areas. The program elements reviewed during this ,

inspection were found to be good and the staff in these programs were found to be competent ,

and well trained. Outage preparations were found to be extensive and thorough. However,

review of the preparations for drywell occupancy during fuel movement identified several '

areas of concern. These were discussed in detail with your staff and full agreement on the

- appropriate corrective actions was reached.

.

,

. -

t, L ; a e -

9011270158 901109

u m c w, a L

POR ADOCL 05000219 ,

O PDC

._ ,. . _ _ _ _ _ __ . . . . , . . _

t

-

. .

t '

,

, . .

>

'

Iv'0V u o ;ppy

GPU Nuclear Corporation 2

Your cooperation with us is appreciated.

.

Sincerely,

Original Signed By: -

James H. Joyner

James H. Joyner, Chief

Facilities Radiological Safety .

and Safeguards Branch

Division of Radiation Safety -

and Safeguards

Enclosure: NRC Inspection Report 50 219/90 20

!

cc w/ encl:

M. Laggart, BWR Licensing Manager

Licensing Manager, Oyster Creek

Public Document Room (PDR) ,

'

lxcal Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident inspector a

tate of New Jersey  ;

l

l

I

I

l

,

i

f*OFTThf31 f # ^ (! ?': {}

Li1ilL U F.0/..'U {1p}?jijiF

. ud j ,

_ _ .

.

i

'

. ,

. ,

e

, .

l

, ,

,

GPU Nuclear Corporation 3

NOV 0 91993  !

l

1

l

bec w/ encl,

Region I Docket Room (with concurrences) j

Management Assistant, DRMA (w/o encl)  !

J. Joyrer, DRSS

DRP Section Chief

M. Conner, SALP Reports Only

A. Dromerick, Project Manager, NRR ,

< K. Abraham, PAO (20) SALP Repnrts and (2) All Inspection reports I

J. Caldwell, EDO

l \

.1

l

I

l

-

l

l

i

,

l

>

9g

0 }

93 W. as ak al. Joyner

jhrM.Kunowski S. Sherbini II / 7 / 70

)l / I/90 II/ I/90 \\/% /Ro

<

"OfficiM. RECORD 00?Y"

. - -

. ---