Forwards Insp Repts 50-277/93-29 & 50-278/93-29 on 931012-15.No New Unresolved Items Nor Violations Noted
ML20059J690
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 11/04/1993
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20059J694 List:
References
NUDOCS 9311150015
Download: ML20059J690 (3)


See also: IR 05000277/1993029

Text

-

.

NOV 41933

Docket Nos. 50-277

50-278

Mr. D. M. Smith

Senior Vice President-Nuclear

Philadelphia Electric Company

Nuclear Group Headquarters

Correspondence Control Desk

P. O. Box 195

Wayne, Pennsylvania 19087-0195

Dear Mr. Smith:

SUBJECT: COMBINED INSPECTION REPORT NUMBERS 50-277/93-29; 50-278/93-29

This refers to the announced safety inspection of maintenance activities conducted by

Mr. D. Florek of this office from October 12-15, 1993, at Peach Bottom Units 2'and 3,

Delta, Pennsylvania, of activities authorized by NRC License Nos. DPR-44 and DPR-56 and

to the discussions of our findings held by Mr. D. Florek with members of your staff at the

conclusion of the inspection.

Areas important to public health and safety examined during this inspection are described in-

the NRC Region I Inspection Report, which is enclosed with this letter. Within these areas,

the inspection consisted of selective examinations of procedures and records, interviews with

personnel, and observations by the inspector.

The interface between maintenance activities and the Plant Information Management System

(PIMS) is effective and, in most instances, in accordance with facility licensee approved

l procedures (Section 2.0 and 3.0). Training on the " ARTS /MELL" modification is planned

for licensed operators prior to assuming the Unit 3 watch when Unit 3 starts up after the

outage (Section 4.0). Section 5.0 reviews your actions on prior inspection findings.

Within the scope of this inspection, no new unresolved items nor violations of NRC

l- requirements were identified. We appreciate your coopemtion with us.

l

l

1

,

l

OFFICIAL RECORD COPY G:PB932929. INS

l'A0003

g\/

\

9311150015 931104"

PDR ADDCK 05000277 di

G PDR;- Q

3

Q

.

Mr. D. M. Smith 2 NOV . 41993

= In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and.-

-;

its enclosures will be placed in the NRC Public Document Room.'

Sincerely,

o. -y gi-tc6 Dy:

I ;; gu ,aah

12e H. Bettenhausen, Chief

Operations Branch

Division of Reactor Safety

Enclosure:

Combined NRC Region I Inspection Report .

Numbers 50-277/93-29 and 50-278/93-29

cc w/ encl:

'I

J. Doering, Chairman, Nuclear Review Board

D. B. Miller, Vice President, Peach Bottom Atomic Power Station

G. Rainey, Vice President, Nuclear Services Department

G. Cranston, General Manager, Nuclear Engineering Division

C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.

G. Edwards, Plant Manager, Peach Bottom Atomic Power Station

A. J. Wasong, Manager, Experience Assessment

G. A. Hunger, Jr., Manager, Licensing Section

J. W. Durham, Sr., Senior Vice President and General Counsel

J. A. Isabella, Director, Generation Projects Department,

Atlantic Electric

B. W. Gorman, Manager, External Affairs -l

R. McLean, Power Plant Siting, Nuclear Evaluations +

D. Poulsen, Secretary of Harford County Council

R. Ochs, Maryland Safe Energy Coalition

J. H. Walter, Chief Engineer, Public Service Commission of Maryland

Public Document Room (PDR) '

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2)

NRC Resident Inspector

Commonwealth of Pennsylvania

TMI - Alert (TMIA)

i

OFFICIAL RECORD COPY G:PB932929. INS f

,

Y

r

3 ,

,

Mr. D. M. Smith 3 fl0V 4 1993

bec w/ encl:

Region I Docket Room (with concurrences)

bec w/ encl: (Via E-Mail)

V. McCree, OEDO

Joseph Shea, NRR-

L. Nicholson, Acting PDI-2, NRR

(VIA FeMAIL AND NO ATTACIIMENTS)

L. Bettenhausen, DRS

R. Conte, DRS

D. Florek, DRS

I.

R, RI:DRS RI:DRS

rek/ mg Co Bc ausen

10/29/93 -10/y93 40/f/93

D 11

OFFICIAL RECORD COPY G:PB932929. INS