ML20062K054

From kanterella
Revision as of 05:15, 1 June 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notice of Violation from Insp on 820410-0510
ML20062K054
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 06/22/1982
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20062J966 List:
References
50-424-82-11, 50-425-82-11, NUDOCS 8208160534
Download: ML20062K054 (1)


Text

I. .. .

APPENDIX A NOTICE OF-VIOLATION Georgia Power Company Docket Nos. 50-424 and 50-425 A. W. Vogtle 1 and 2 License Nos. CPPR-108 & CPPR-109 As a result of the inspection conducted on April 10 - May 10,1982, and in accordance with the NRC Enforcement Policy, 47 FR 9987 (March 9, 1982), the following violations were identified.

A. 10 CFR 50, Appendix B, Criterion V, as implemented by Georgia Power Company P.S.A.R. Section 17, requires that activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings.

Contrary to the above, Pullman Section XIII-5 and Bechtel X4A201 procedures for the control of storage of material were not fully implemented in that 29 stainless pipe spool pieces were in a storage area not supported by dunnage and in contact with the ground.

This is a Severity Level IV Violation (Supplement II.). A similar violation was brought to your attention in our letter dated May 13, 1981.

B. 10 CFR 50, Appendix B, Criterion V, as implemented by Georgia Power Company P.S.A.R Section 17, requires that activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures or drawings.

Contrary to the above, the survey group was performing final inspections for acceptance of tendon locations, equipment verticality and orientation, location of imbeds and penetrations, wall alignments, location and setting of equipment, circularity and diametral inspection of the reactor building containment liner without documented instructions or procedures.

This is a Severity Level V Violation (Supplement II.).

Pursuant to the provisions of 10 CFR 2.201, you are hereby required to submit to this office within thirty days of the date of this Notice, a written statement or explanation in reply, including: (1) admission or denial of the alleged viola-tions; (2) the reasons for the violations if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved. Consideration may be given to extending your response time for good cause shown.

Date:

~

F208160534 B20804 PDR ADOCK 05000424 0

e_ PDR