ML20059H339
ML20059H339 | |
Person / Time | |
---|---|
Site: | Vogtle ![]() |
Issue date: | 08/29/1990 |
From: | Dan Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
To: | |
Shared Package | |
ML20059H334 | List: |
References | |
50-424-90-15, 50-425-90-15, NUDOCS 9009170121 | |
Download: ML20059H339 (2) | |
Text
Y f ;[y, Q y MD Mj' i6
~
D. Q
.N O
3 w'3 5
+
i j[: g A
v. +, -
11
+
fth M '
[
,,m:.
MN ENCLOSURE 1 a'
i 4
JGeorgia Power Company Docket Nos. 50-424 and 50-425-f7 Vogtle Units 1~and 2-License Nos. NPF-68 and NPF-814 r
h lw
[
During. the Nuclear Regulatory Comission - (NRC) inspection conducted on JulyJ30 - August 3, 1990, a violation of NRC requirements was identified.
In d"
accordance with the " General Statement' of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C '(1990), the violation is: listed 1
+
~below:-
t f
b 10 CFR Part 50.47(b)(16) requires that, responsibilities for-plan development. and review and 'for distribution of Emergency Plans be
' established and planners be properly trained.
o
.10 CFR Part 50, Appendix E (G) requires that. provisions to be employed.to ensure that the emergency plan, its-implementing procedures, and emergency equipment and supplies be maintained up.to date.
Technical Specification 6.7.1(d) requires that written procedures shall-be F,
established, implemented, and maintained covering the Emergency ~ Plan-implementation.
j 1
- j Procedures 00103-C, " Document Distribution -and Control " 71002-C,
" Controlled - Document Distribution," 70408-C, " Controlled Document Distribution,"=and 40005-C, " Preparation and Control of Emergency Planning q
Documents" implement the control and distribution of the Emergency Plan l
=and Emergency Plan Implementing Procedures.
I Contrary to the 'above requirements, during the week of July 30 - August 3, 1990, multiple controlled copies of the Emergency Plan and Emergency Plan Implementing: Procedure in the Technical Support Center (TSC), Operational Support Center-(OSC), Emergency Operations Facility (E0F), and Simulator Control: Room _ (SCR) were incomplete or had not been maintained in an l
y up-to-date manner.
.This is a Severity Level IV violation (Supplement VIII).
Pursuant. to the provisions of 10 CFR' 2.201,' Georgia Power Company is hereby
- required to submit a written statement or explanation to the Nuclear Regulatory Commission,-ATTN: Document Control Desk, Washington, DC 20555, with a copy to the l Regional Administrator, Region II,. and a copy to the NRC Resident-i
- Inspector, within 30 days of the date-of the letter transmitting this Notice.
'J
- This reply should be clearly marked as a " Reply to a Notice of Violation" and should, include:
(1) admission or denial of the violation, (2) the reason for the violation if admitted, (3) the corrective steps which have been taken and the results achieved, (4) the corrective steps which will be taken to avoid 4
l 9009170121 900829 R i
PDR ADOCK 05000424U
.. G PNU; y
ll f f
f 1.
.n m
y 1
1 9
,y-
'V
' Georgia Power Company.
Docket Nos. 50-424 and 50-425
~
p
'Vogtle Units.I and 2 2
License Nos. NPF-68 and NPF-81
, i:;
l f ' Turther-violations, and- (5) the~ date when full-compliance will be achieved.
Where good cause 'is. shown, consideration will be given to extending the response time.
If an adequate reply is not received within-the time specified
-in this Notice, an order may be usued to show cause why the license should not be modified, suspended, or revoked or why such other action as may be proper should not be taken.
1 FOR THE NUCLEAR REGULATORY. COMMISSION f
ffl
$k214--
Douglas M. Collins, Chief Emergency Preparedness and J
Radiological Protection Branch Division of Radiation Safety and Safeguards
-DatedatAtlanta,Jufusf, Georgia 1
this Eth-day of /
1990 1
r