Text
.
ENCLOSURE 1 NOTICE OF VIOLATION Georgia Power Company Docket No. 50-424 Vogtle Unit 1 License No. NPF-68 During the NRC inspection conducted on March 28 - May 1, 1993, a violation of NRC requirements was identified.
In accordance with the " General Statement of Policy and Procedures for NRC Enforcement Actions," 10 CFR Part 2, appendix C, the violation is listed below.
10 CFR 50, Appendix B, Criterion XVI, Corrective Action, requires measures to be established to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances are promptly identified and corrected.
Contrary to the above, on March 16, 1993, a Design Change Package and other associated reference material were not adequately reviewed as part of the corrective action to troubleshoot an illuminated bistable light on the Main Control Board. This resulted in a momentary loss of the only available train of decay heat removal.
This is a Severity Level IV violation (Supplement 1).
Pursuant to the provisions of 10 CFR 2.201, Georgia Power Company is hereby required to submit a written statement of explanation to the U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D. C. 20555, with a copy to the Regional Administrator, Region II, and a copy to the NRC Resident Inspector Vogtle Nuclear Plant, within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for each violation:
(1) the reason for the violation, or if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.
If an adequate reply is not received within the time specified in this Notice, an order or demand for information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken. Where good cause is shown, consideration will be given to extending the response time.
Dated at Atlanta, Georgia this 25th day of May P
b 9306160167 930525 PDR ADOCK 05000424 G