Requests Withdrawal of Application for Amend to License NPF-3 to Delete Auxiliary Feedwater Pump Turbine Inlet Steam Pressure Interlocks Due to Decision to Retain Switch Interlocks within Main Steam Lines
ML20138J017
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/25/1985
From: Williams J
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
1179, TAC-56793, NUDOCS 8510290217
Download: ML20138J017 (1)


Text

.

TOLEDO

%mm EDISON Docket No. 50-346 JOE kVILUAMS. JR Sarwr Vce h-Nudear License No. NPF-3 y@%S"y d Serial No. 1179 October 25, 1985 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz Operating Reactor Branch No. 4 Division of Licensing United States Nuclear Regulatory Commicsion Washington, D.C. 20555

Dear Mr. Stolz:

The purpose of this letter is to request withdrawal of Toledo Edison's Operating License amendment request concerning the deletion of the Auxiliary Feedwater Pump Turbine Inl.et Steam Pressure Interlocks (Technical Specification 4.7.1.2d). This amendment request was submitted to your office on November 5, 1984 (Serial No. 1096). Since the request was submitted, the June 9, 1985 event occurred at the Davis-Besse Nuclear Power Station Unit No. 1. The investigation of-the June 9 event has led to a decision to retain these switch interlocks within the main steam lines to the Auxiliary Feedwater Pump Turbine inlets. Therefore, we request withdrawal of our amendment request for the deletion of the Auxiliary Feedwater Pump Turbine Inlet Steam Pressure Interlocks.

Very truly yours, bAB: f

.m8E:$se:#

  • cc: DB-1 NRC Resident Inspector l

I 8510290217 831025 l PDR ADOCK 05000346 A P PDR wO THE TOLED0 EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652