ML20204H257

From kanterella
Jump to navigation Jump to search

Proposed Tech Spec Deleting Requirement for Auxiliary Feed Pump Turbine Inlet Steam Pressure Interlock
ML20204H257
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/05/1984
From:
TOLEDO EDISON CO.
To:
Shared Package
ML20204H239 List:
References
TAC-56793, NUDOCS 8411120234
Download: ML20204H257 (1)


Text

_ _ _ _

, PLAtiT SYSTEMS .-

SURVEILLANCE R50VIREMENTS (Continued)

c. The Auxiliary Feed Pump Turb'ine Steam Generator Level Control System shall be demonstrated OPERABLE by performance of a CHANNEL CHECK at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, a CHANNEL FUNCTIONAL TEST at least once per 31 days, and a CHANNEL CALIBRATION at least once per 18 months.

d.

The Auxiliary Feed P, ump Suction Pressure Interlocksy

._..._.,7 .... .. , ........ ...... ............... ...........

snall be demonstrated OPERABLE by performance of a CHANNEL FUNCTIONAL TEST at least once per 31 days, and a CHANNEL

., CALIBRATION at least once per 18 months.

a 8411120234 841105 PDRADOCK05000g e .

DAVIS-BESSE, UNIT 1 3/4 7-5 Amendment No. 4'3', 63 O $

.l * ,