Advises That Operator Requalification Program Evaluation Scheduled for Wk of 870706,per Telcon.Ref Matl Listed in Encl 1 Should Be Furnished by 870511
ML20210D192
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 04/29/1987
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mangan C
NIAGARA MOHAWK POWER CORP.
References
NUDOCS 8705070020
Download: ML20210D192 (3)


Text

P.

s APR 2 91987 Docket No. 50-410 Niagara Mohawk Power Corporation ATTN: Mr. C. V. Mangan Senior Vice President 301 Plainfield Road Syracuse, NY 13212 Gentlemen:

SUBJECT:

OPERATOR REQUALIFICATION PROGRAM EVALUATION In a telephone conversation between Mr. R. Seifried, Training Coordinator, and )

Ms. L. Kolonauski, arrangements were made for the administration of the exam-inations at the Nine Mile Point 2 facility. The evaluation visit is scheduled

'or the week of July 6,1987.

For this visit, the NRC Operator Licensing Section, Region I, will prepare and administer NRC Reactor Operator and Senior Reactor Operator written and oral examinations.

For the examiners to adequately prepare for this visit, it will be necessary for the facility to furnish the approved reference material listed in Enclosure 1, " Reference Material Requirements for Requalification Program Evaluation", by May 11, 1987.

Mr. Seifried has been advised of our reference material requirements and appro-priate mailing addresses.

When the NRC Chief examiner arrives at the site, she will meet with the appro-priate personnel to review the schedule for the oral examinations which will be administered by NRC examiners.

This request for information was approved by the Office of Management and Budget under Clearance Number 3150-0101, which expires on May 31, 1989. Ccm-ments on burden and duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, New Executive Office Building, Washington, D.C. 20503.

f,

  • h o Y OFFICIAL RECORD COPY NMP REQUAL PROGRAM - 0001.0.0 04/23/87 e } .M

a APR 2 9 007 Niagara Mohawk Power Corporation 2 Thank you for your consideration in this matter. If you have any questions on the evaluation process, please contact Mr. R. Keller, Chief, Reactor Projects Section IC, at 215-337-5211.

Sincerely, Orihinal Signed By James C. Linville, Chief Projects Section 2C

Enclosure:

As stated cc w/ encl:

R. Zollitsch, Plant Training Manager R. Seifried, Training Coordinator NRC Senior Resident Inspector bcc w/ encl:

DRP Section Chief Examiners OL File

/

R P RI:Q 'P-R :DRP Kolonauski/mjd Ke Linville 4/24/87 4/ /87 4/)h87 0FFICIAL RECORD COPY NMP REQUAL PROGRAM - 0002.0.0  :

04/22/87 i

l l

-.1

a 0.

i i

i h

ENCLOSURE REFERENCE MATERIAL REQUIREMENTS FOR REQUALIFICATION PROGRAM EVALUATION j 1. An index of administrative, operating, abnormal, and emergency procedures.

2. All administrative procedures (as applicable to reactor operation and
safety).
3. All integrated plant procedures (normal or general operating procedures).

, 4. Emergency procedures (emergency instuctions, abnormal or special proced-1 ures).

i 5. Standing orders (important orders that are safety related and may super-sede the regular procedures).

l 6. Fuel handling and core loading procedures.

j 7. Annunciator procedures (alarm procedures, including setpoints).

i 8. Radiation Protection Manual (Radiation Control Manual or procedures).

9. Emergency Plan.

l 10. Technical Specifications.

11. Plant Technical Data (curve book).
12. Lesson Plans (training manuals, learning objectives, plant orientation j manual, systems descriptions).

j 13. Systems Operating Procedures.

14. Piping and Instrumentation diagrams (electrical single-line diagrams, or flow diagrams).
15. Copies of facility R0 and SRO requalification examinations administered l during the past two years.

l 16. Simulator malfunction book with descriptive summary of malfunction effects

and available Initial Conditions (ICs).

I All of the above referenced mt terial should be approved, final issues, and i should be so marked. Uncontrolled, preliminary, or other such issues will not

be acceptable. All procedures and reference material should be bound or other-wise in the form used by the control room operators, with appropriate indexes or tables of contents to ensure efficient use.

l 4

0FFICIAL RECORD COPY NMP REQUAL PROGRAM - 0003.0.0 34/22/87