ML21190A186

From kanterella
Revision as of 05:12, 8 September 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search

Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point Units 3 and 4
ML21190A186
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/02/2021
From: Ellen Brown
Plant Licensing Branch II
To: Moul D
Florida Power & Light Co
Brown E
References
EPID L-2021-LRM-0007
Download: ML21190A186 (5)


Text