ML20215M133

From kanterella
Revision as of 19:19, 18 April 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-498/87-25 & 50-499/87-25 on 870420 & 0427-0501.No Violations or Deviations Noted.Details of Repts Withheld (Ref 10CFR73.21)
ML20215M133
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 06/22/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20215M136 List:
References
NUDOCS 8706260286
Download: ML20215M133 (2)


See also: IR 05000498/1987025

Text

_ _ . . .

.,

. ' .

-

JUN 2 21987

In Reply Refer To:

Dockets: 50-498/87-25 Documen: Contains

50-499/87-25

SAFEGUARDS INFORMATION

Houston Lighting &. Power Company

ATTN: J. H. Goldberg, Group Vice

President, Nuclear

P. O. Box 1700

Houston, Texas 77001

Gentlemen:

This refers _ to the. inspection conducted by Messrs. James A. F. Kelly and

A. B. Earnest of this office during the periods April 20 and 27 through May 1,

1987, of activities authorized by NRC Construction Permits CPPR-128 and

CPPP.-129 for South Texas Project, and to the discussion of our findings with , j

Mr. A. O. Hill and other members of your staff at the conclusion of the 1

inspection. l

Areas examined during the inspection included security plan and procedures,  !

management effectiveness, security organization, audits, records and reports,  !

testing and maintenance, locking systems, physical barrier protected area,

physical barriers - vital areas, power supply, lighting, compensatory measures, j

assessment aids, access control personnel, access control packages, access J

control - vehicles, detection aids protected area, detection aids - vital

areas, alarm stations, communications, personnel training and qualifications,

safeguards contingency plan, and the protection of safeguards information.  ;

Within these areas, the inspection consisted of selective examination of

procedures and representative records, interviews with personnel, and ,

observations by the NRC inspectors. The inspection findings are documented in j

the enclosed inspection report.

'

I

Within the scope of the inspection, no violations or deviations were

identified.

The material enclosed herewith contains Safeguards Information as, defined by

10 CFR Part 73.21 and its disclosure to unauthorized individuals.is prohibited

by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the

material, with the exception of the report cover page which is an inspection

summary, will not be placed in the Public Document Room.

8706260286 a70622

PDR ADDCK 05000498

G PDR

RIV:RPSk

JAFKelly7$

R C:RPSB

LAYand -

C:R B/ C:RPB / AC M i

A arnest GL o able do MEEmerso

y /)b/87 dt g//'/87 6/jo/87 g p/87 f//

JEGaf (,/ f1/87

ENCLOSURE CONTAINS .

.

Document co "#. SAFEGUARDS INFORMATION.

UPON SEPARATION.THIS

SAFEGUARDS INFORMATION /

. PAGE IS OECONTROLLED.

/v,/r -

,

I

.- l

Houston Lighting & Power Company -2-

1

Should you have any questions concerning this inspection, we will be pleased to J

discuss them with you.

]

Sincerely,  !

ORIGINAL SIGNED BY:

1

J. E. Gagliardo, Chief -)

Reactor Projects Branch

Enclosure:

Appendix - NRC Inspection Report

50-498/87-25

50-499/87-25

cc w/ summary page only:

Houston Lighting & Power Company

ATTN: M. Wisenberg, Manager, .

Nuclear Licensing

P. O. Box 1700 ,

Houston, Texas 77001 l

Houston Lighting & Power Company

ATTN: Gerald E. Vaughn, Vice President

Nuclear Operations

P. O. Box 1700

Houston, Texas 77001

! Texas Radiation Control Program Director

bec: Copy of entire report:

RIV Security File P. A. Starcher, RSGB/NRR

Resident Inspector (2) R. D. Martin, RA

R. L. Bangart, DRS&S Security Inspector

Chief, RPSB RPSB Security File

M. E. Emerson, AC (2)

bec: RIV - Letter and Inspection Summary only w/766: 1

RPB D. Weiss, RM/ALF

MIS RIV File

Section Chief, RPB/C RSTS Operator

RPSB R. E. Hall, DRSP

Project Inspector, RPB NRR Project Manager.-

bec: RIV - Letter and Inspection Summary only w/out 766:

4M8 - IE04

E. H. Johnson, DRS&P

ENCLOSURE CONTAINS

SAFEGUARDS INFORMATION.

UPON SEPARATION THIS

PAGE IS DECONTROLLED.