Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-498/89-16 & 50-499/89-16.Implementation of Corrective Actions Will Be Reviewed During Future Insp
ML20245J329
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 08/09/1989
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
References
NUDOCS 8908170674
Download: ML20245J329 (3)


Text

- - -

__7_-

. n ,

W'7 . 1, -

'

'

. '

-(

p- g ,. , ,

'+>

~

p_3 3- .

.

X 93 , '

X

-

.

g .

"

.In Reply ReferLTo:t

  • Dockets: '.50-498/89-16-bH

.

- 50-499/89-16,

, - #

'

Houston Lighting & Power Company

' ATTN: 'J.'H.cGoldberg,' Group Vice i President, Nuclear ' '

~P.On Box 1700

, . Houston, Texas 77001 j

, t

,

Gentlemen:

, .

' "

<

'

Thsnk you for your letter of July 24, 1989, in' response to our ' letter and '

,

j

,

Notice of Violation dated June 22, 1989. We have reviewed'your reply and fin : ,

- it responsive.to.the' concerns raised in our Notice of Violation. We~will review the implementation of your corrective actions during a future inspection-

+

,

to determine that full compliance has been achieved and will:be maintaine '

Sincerely

' .

g , ya-

" '

,

Odgin'al Signed By -

I L Milheam ,

.[ 4

'

~~ James L. Milho m Director Division of Reactor Projects:

,

cc:-

Houston-Lighting & Power ~ Company ATTN: 'M. A. McBurnett, Manager

.

Operations Support Licensing P.O. Box 289 Wadsworth,. Texas 77483 H'ouston Lighting & Power Company ATTH: Gerald E. Vaughn, Vice President Nuclear Operations P.O. Box-289-Wadsworth', Texas 77483 RIVl:CiMQPS # AD: ftS 4') D: P 1Barnes/cjg JJaydon QLRi hoan r l

y / r/89-Q /89 g / /89 newnW G

~ w --__-_ _: :_- __ _ ______ ___ -_ _ _ - _ _ _ - _ - _ _ -__- _--__ __ _- - __ ___ _ _- - _ - -- -

gm-- f

-

,

-

,, , ,

'

, , ~..+

4 .

  • i m<

,

y .. g , , ,

'

4 +

,

'

,

Houston Lighting & Power' Company .-2- -

'

.

/. Houston. Lighting & Power Company

.

ATTN: J. T. Westermeier, General Manager

. .

South Texas Project P.O. Box'289:

Wadsworth, Texas.~77483,

'

'ChntralPower&LightCompany-ATTN:. R. L.' Range /R. P. Verret P.O. BoxL2121= 4 Corpus Christi. Texas 78403 City of' Austin Electric' Utility 3e' ATTN: R.. J. Miner, Chief Operating Officer-(2 copies)

721 Barton. Springs Road Austin, Texas 78704-

, ,

.Newman & Holtzinger, ATTN: :J. R. Newman, Esquire

'1615 L Street.L Washington, D.C. 20036 _

_

Houston Lighting & Power Company

. ATTN: 'S.:L. Rosen;

'P.O." Box 2891 .

Wadsworth Texas 77483-x Houston L1ghting'& Power Company

~ ATTN: R. W. Chewning, Chairman Nuclear Safety Review Board

.

.. P.O. Box 289-Wadsworth,. Texas 77483 _,

-City Public Service Board ATTN: -R. J. Costello/M. T. Hardt P.O.. Box 1771 idan Antonio,-Texas 78296 Houston Lighting & Power Company ATTN:: Licensing Representative Suite 610 Three Metro Center Bethesda, Maryland 20814

_

l Houston Lighting & Fower Company

!; ATTN:: Rufus S. Scott, Associate L General Counsel P.O. Box 1700 Houston, Texas 77001

- _ _ _ - _ _ - _ _ _ - _ -

y,:77- c 3,; - - ,r --

, -

,

,

,

,

l$ ,5

'

' ,2 :p :s

<

"

u hC g-. ,'c-

' '

'[e e

c :.. .

,

  • , z ,

'

w I ,A,(')). ' , < . h had -' il _ ,,

" 5'

y_ j".'<]f $', ' 4 ' ,

f,;. " ..! , _. 4: 's

'

t.c 7 .9: _ ; '- I; i g

'

. .

-

,-

a

,

.

F'J> ^.

-

  • :a2

<

. LHouston Lighting & Power Company; -3-

'

_ . _;

s- -

,

,

.. r-:

-

INP0 . ,

'Yr Records: Center - *

1100 Circle 75. Parkway ,

, - - Atlanta,'. Georgia 30339-3064,

, 'Dr.. Joseph M. Hendrie' a

, ..-  : 50 Bellport Lanes

..

Bellport, New.. York. 11713 o

" Texas ~Ra'diation ControleProgram Director

' ' '

" *

, bectoDMBl(IE01)5 s bec distrib. by RIV:

DRP..' . . RRI

"M .

.;- Section' Chief (DRP/D)

'

-DRS MIS System- RPB-DRSS h

- Lisa'Shea,.RM/ALF _ RIV File R. Bachmann,~ OGC .

.RSTS Operator

- G. Dick, NRR Project Manager (MS: 13-D-18)

~

'

,. Project Engineer (DRP/D) R. D. Martin-

., ' Barnes

-

,

.

<

/

.^f

  • -

t i

I

'

_,-g-^

n t

A

_ _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ . _ _ _ _ _ _

-.

. _ - ..

.

.

r'

> -

The Light

'

-

l company P.O. Box 1700 Houston Texas 77001 (715) 228 9211 i Houston Lighting Ae Power July 24, 1989 ST HL.AE.3172 File No.: C02.04 10CFR2.201 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project Electric Generating Station Units 1 and 2 Docket Nos. STN 50 498, STN 50-499 Resconse to Notice of Violation (498 /8916 -02 t 499/8916 02)

Houston Lighting ik Power Company has reviewed Notice of violation (498/8916-02: 499/8916 02) dated June 22, 1989, and submits the attached rerpones pursuant to 10CFR2.20 If you should have any questions on this matter, please contact Mr. M. A. McBurnett at (512) 972-853 w_ )

,

S. L. Rosen Vice President Nuclear Engineering and Construction CEV/PLW/n1 Attachment: Response to Notice of Violation (498/8916 02; 499/8916 02)

A1/039.NL4 A Subsidiary of Ilouston Industries Incorpor.sted h&9f41[1@k T0*d SCS9 216 EIS d15 'O133d5N!

d 1N3GI53M 90:EI 686T/T0/80

- _ _ _

'

ouston Lighting & Power Company ST HL AE 3172 i File No.: 002.04 Page 2

,

cc:

Regional Administrator, Region IV Rufus S. Scott Nuclear Regulatory Commission Associate General Counsel 611 Ryan Plaza Drive, Suite 1000 Houston Lighting & Power Company Arlington, TX 76011 P. O. Box 1700 Houston, TX 77001 George Dick, Project Manager U. S. Nuclear Regulatory Commission INPO Washington, DC 20555 Records Center 1100 circle 75 Parkway Jack E. Bess Atlanta, GA 30339-3064 Senior Resident inspecto'r Unit 1 c/o U. S. Nuclear Regulatory Commission Dr. Joseph M. Hendrie P. O. Box 910 50 Bo11 port Lane Bay City, TX 77414 Be11 port, NY 11713 J. I. Tapia D. R. Lacker Senior Resident Inspector - Unit 2 Bureau of Radiation Control c/o U. S. Nuclear Regulatory Commission Texas Department of Health P. O. Box 910 1100 West 89th Street Bay City TX 77414 Austin, TX 78756-3189 J. R. Newman, Esquire Newman & Holtzinger, P. L Street, N. Washington, DC 20036 R. L. Range /R. P. Vorret Central Power & Light Company P. O. Box 2121 Corpus Christi, TX 78403 i R. John Minor (2 Copies)

Chief Operating Officer City of Austin Electric Utility 721 Barton Springa Road Austin, TX 78704 R. J. Costello/M. T. Hardt City Public Service Board P. O. Box 1771 San Antonio, TX 78296 Revised 06/16/89 A1/NL..DISR4

!

E0*d SES9 246 ETS d15-B01D3dSNI IN3GIS3d LO:ET 686VT0/80

_ - o

- _ _ _ _ _ - _ ___ - _ - - - - - - - .

k%

~

- 08/01d999 - 13iO9)~RESIDENTINSPECTOR-STP 512 972'6535 P.01 w&go ' .. 3 . ;

.lip st

. Attachment

'

ST HL AE 3172 j , Page 1 of 3 South Texas Project Electric Generating Station

>

Units 1 and 2 l- Docket Nos. STN 50-498, STN 50 499

[ Rampense to Notica of Violation (498/8916 02! 699/8916 02) Statamant of Violation

Criterion IV of Appendix B to 10 CFR Part 50 states, in part,.fMeasures shall be established to assure that applicable regulatory requirements, design bases, and other requirements which are necessary to assure adequate quality are suitably included'or referenced _in the documents for procurement ofJesterial, equipment, and services...."

Paragraph 6.1.2,of Procedure NPMMP 4.7Q Revision 0, states,." Purchase orders / Contracts shall be prepared to reflect the requirement of the Purchase Requisition / Requests on Purchasing Department (PR/RPD)."

Contrary to the abov . Purchase Order (PO) RS_9876 ordered nonsafety-related Westinghouse OT1NIC selector switches rather than safety-related selector switches required by PR 14023 . . P0 RS 10630 for ASME Section III Code, Class 2 instrumentation toes identified that 10 CFR Part 21 was not applicable, which was contrary to the stipulation of 10 CFR Part 21 applicability contained in PR 59686 . PO RS 8244 ordered Schedule 80, 3-inch, ASME Section III code, Class 2,.SB 165 pipe rather than the Schedule 160 pipe required by PR 14105 I Houston Limhtinn & Power Position Hi&P concurs that the cited violation occurre III. Ramaan for Violarion The cause of this violation is the failure of procurement personnel to ensure the technical and quality requirements of the purchaos requisition (s)_(PR/RPD) are accurately reflected in the procurement

,

documents. This retulted due to the fact that the procurement process in effect at the time of the subject audit did not include verification of the completed procurement documentation package for compliance with the PR/RPD requirement A1/039.NL4

_ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - . - i

__

__ _ _ _ ___ _ _

. jQ:  !

' -

.. . ', j

.

Attachment ST HL AE-3172

_

Page 2 of 3

<

IV.,

enrrective Aetion Taken and Resulta Achieved s

The following corrective actions have been taken:

1.:

_ A Procurement Document Quality Checklist has been created for.use in reviewing for. consistency.between PCs and PR/RPDs. Personne1'

conducting the_ purchase order reviews have been trained regarding i the intent of the checklist criteria and its appropriate application during.the review proces ! To date, H1AP has issued (directly as project manager) approximately 2,600 purchase orders. As of t.his writ.ig,1,831 have been j

reviewed. Twenty-three occurrences (1.264 of those reviewed) have d been found in which the purchase orders issued did not reflect the PR/RPD requirements. Eighteen of these purchase orders have been corrected with'the issuance of supplements.- Five do not require supplements as the information on the procurement documents, although. differing from the PR/RPD requirements, has since been verified as correct and-authorized by the proper technical and quality organization .I Quality control inspectors or cognizant technical organizations have reviewed.the receipt inspection documentation for seventeen of the el i;hteen discrepant purchase ordcrs and determined that the material received was supplied and inspected in accordance with the technical and quality requirements delineated in the PR/RFD._ The material in the field covered by these purchase orders is appropriate for the application. No material has been received to date on one of the discrepant purchase order . The corrective action for those eighteen discrepant orders was transmittal of the corrective supplement to the affected vende The vendors are requested to acknowledge that material and services provided in those purchase orders are in accordance with the technical and quality requirements of the corrective supplemen .

Reviews of the remaining PC's will be completed and any discrepancies appropriately addressed in the saar manner as paragraphs 3 and 4 abov Correctiva Action Taken to Prevent Recurrenca A Procurement Document Quality Checklist has been developed for the purpose of ensuring that safety-related and commercial grado procurement documents and applicable are procedure issued in accordance with the requirements of the PR/RPD (The areas of deficiency noted by the subject audit are specifically included in the checklist.)

A1/039.NL4 ca a SCS9 EL6 ETS eis 'olosesNI e IN3G153M eritt 6e61/10 80

~ ~ ~ ~

h.W d W101 i

'

.4 . i; .

  • *

. .. ,

Attachment  !

ST.HL AE-3172 i

.-

Page 3 of 3 l

The procurement process now requires that procurement documents initiated since June 12, 1989, be reviewed in accordance with the checklist criteria. The buyer initiating the procurement documents is responsible for verifying the checklist criteria and confirming the  ;

verification process by signing the checklist. Accountability for the l

accuracy of the procurement documents is further snsured by a separate verification of the checklist criteria by the nont hishar level of authority. The completed checklist with the two verification signatures is then filed in the procurement document fil Procurement personnel have been trained in regard to the intent of the checklist criteria and their appropriate application in the review of procurement document As a further measure, the Nuclear Purchasing and Haterials Management Procedures are being revised as appropriate to include the requirement that safety related and commercial grade procurement documents must be reviewed and verified with a properly completed and signed Procurement Document Quality Checklist prior to issuance. The applicable Nuclear Purchasing and Haterials Management Procedures will be revised and issued by August 1, 198 V Date of Full Comeliance The remaining purchase orders which have not been reviewed will be reviewed as described in Section IV herein, and all corrections made as necessary by December 31, 198 l A1/039.NL4 EC'd SES9 ELS ETS d15-60103dSNI IN3GIS3d TT:EI 686T/10/80 L _ -_ - _ . __ __-__________-______ _ _- - _ _