ML20236Q535

From kanterella
Revision as of 14:06, 20 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Augmented Insp Team Insp Rept 50-219/87-29 on 870911-17.Issues Resulting from Insp Including Possible Enforcement Action Will Be Subj for Future Correspondence
ML20236Q535
Person / Time
Site: Oyster Creek
Issue date: 09/28/1987
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Phyllis Clark
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20236Q524 List:
References
NUDOCS 8711200114
Download: ML20236Q535 (2)


See also: IR 05000219/1987029

Text

.# 'o,, UNITED STATES ENCLOSURE

+

5' r, NUCLEAR REGULATORY COMMISSION

<

f . ,I

c

REHIONI

S31 PARK AVENUE

- o,( O 8 KING OF PRUSSIA, PENNSYLVANIA iM06

  • ...+

-

28 SEF 1987

Docket No. 50-219 6

GPU Nuclear Corporation

ATTN: Mr. P. R. Clark

President

100 Interpace Parkway

Parsippany, New Jersey 07054 l

Gentlemen:

Subject: Augmented Inspection Team Report No. 50-219/87-29

,

l

'

This refers to the Augmented Inspection Team (AIT) special review conducted by {

this office on September 11-17, 1987 at the Oyster Creek Nuclear Generating

Station, Forked River, New Jersey'. This inspection was conducted by a team led

by Dr. L. H. Bettenhausen and included a representative from Region I and the

Office of Nuclear Reactor Regulation. The team ' performed a technical analysis

of the circumstances surrounding events which resulted in your reported Techni-

cal Specification Safety Limit Violation on September 11, 1987 as directed by

the AIT Charter (Appendix B). The preliminary findings of this inspection were

discussed with you and members of your staff by Dr. Bettenhausen at the conclu-

sion of the inspection.

The areas examined during this special inspection are discussed in the NRC

Region I Inspection Report which is enclosed. The areas examined were  !

l prescribed by the AIT Charter and were selected to provide NRC management with '

I a comprehensive analysis' of the root causes and safety significance of the  ;

I event.

Issues resulting from this inspection including possible enforcement actions

will be subjects for future correspondence. l

'

Sincerely,

j

l

William F. ane, Director

Division of Reactor Projects

Enclosure: Augmented Inspection Team Report 50-219/87-29 w/ Appendices

kk

P

SOOCK [9

l

- _ _ _ _ _ _ - - - - - -

..v

.g;

, GPU Nuclear Corporation 2

1

r

cc w/ encl:

P. Fiedler, Vice President and Director, OCNGS

M. Laggart, BWR Licensing Manager

! Licensing Manager, Dyster Creek

Public Document Room (POR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

HRC Resident Inspector

State of New Jersey

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

Section Chief, DRP

R. J. Bores, DRSS ,

B. Boger, A/D, RI

B. Clayton, EDD .

W. Johnston, DRS

T. Martin, DRSS

W. Russell, RA

J. Allan, DRA

J. Stolz, NRR/PD I-4

W. Lanning, NRR/0EAB

M. Hodges, NRR/SRXB

J. Rosenthal, AEOD/ROAB

L. Bettenhausen, DRP

D. Holody, RI

J. Lieberman, OE

J. Goldberg, OGC

F. Miraglia, NRR