ML20237H084

From kanterella
Revision as of 20:36, 24 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Vols V-VIII of Final Crdr Summary Rept, Per 870227 Commitment.Pending NRC Review & Util Implementation of Human Engineering Discrepancies Resolution,Rept Completes Actions Associated w/NUREG-0737,Suppl 1
ML20237H084
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 08/25/1987
From: Frisch R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20237H087 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8709030114
Download: ML20237H084 (3)


Text

[

'I cr Consumers POW 8r POWERING MKNIGAN5 PRGGRE55 oeneral offices: 1945 West Parnell Road, Jackson, MI 49201 * (517) 788-0550 l

i August 25, 1987 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT -

INTEGRATED PLAN ISSUE BN-005, FINAL CONTROL ROOM DESIGN REVIEW

SUMMARY

REPORT Consumers Power Company letter dated February 27, 1987 submitted a Partial Control Room Design Review Summary Report. In that letter we committed to submittal of the final summary-report by September 1, 1987. Attached.is the final summary report. This report contains those appendices which were not complete for the. partial summary report submitted on February 27, 1987. The completed appendices are to be inserted into the appropriate binders previously submitted and the old appendices discarded:

Volume V, VI sad VII Inserts (Attachments 1, 2, and 3)

Content: . Appendix 4, Human Engineering Discrepancies (HEDs)

All HED's are now complete which m/eans a suggested resolution for each HED has been formulated by the CRDR team and a resolution code number assigned according to Section-5.3 of'the Program Plan. Also, a tentative schedule date for implementation has been assigned for open HED's and appropriate signatures recorded.

t W P e

1 4 QW OC0887-0126-NLO2 h st i Q06 ll1

4 l I

l ,

Nuclear Regulatory Commission 2 l Big Rock Point Plant Integrated Plan Issue BN-005 August 25, 1987 Volume VIII Insert (Attachment 4) l Content: Appendix 5, HED summary The HED summary consists of two computer sorts using the same format as j previously submitted. The first sort is by control room inventory item -

number identifying all HED's generated for each item. The second sort is all HED's which do not apply to a specific item. These sorts now include f all HED's. As indicated above, all HED's are complete. q l

General Summaries:

l HED Interaction It was indicated in Section 5.2 and 6.4 of the Program Plan that a check for interaction of HED resolutions would be performed when all HED's were complete. This was accomplished by a computer sort by cratrol room inventory item number identifying all HED's against each item similar to the summary found in Volume VIII. Also, similar.co the summary found in Volume III, a sort was done for all HED's which do not apply to a specific item. All HED's regardless of open or closed status, were I reviewed for conflicts in suggested resolutions for a specific item.

Also those HED's which did not apply to a specific item were reviewed for conflicts with each other and the HED's which applied to a specific item.

This process resulted in the modification of two HED's to eliminate conflicts. l HED Status and Resolution Summary As previously indicated, 2,028 HED's were recorded. Of these, 1,729 have been closed out and require no further action. The clomed out status was achieved by the discrepancy being corrected or the CRDR team determining no action is required. The remaining 299 open HED's require further action.

As indicated in Section 5.3 of the program plan, a resolution code was applied to each HED. Resolution code 00 was assigned to the closed out HED's. The open HED's contain a resolution code from 1 to 10. The following is a brief description of each code and the quantity of open HED's which were assigned that code:

OC0887-0126-NLO2

o Nuclear Regulatory Concission 3 Big Rock Point Plant Integrated Plan Issue BN-005 August 25, 1987 l l

Resolution  !

Code Description Quantity  !

l Hardware 1 Add a device to the Control 7 Room (CR)  !

I 2 Remove a device from the CR 18 l h

3 Replace a device in the CR 9 l 4 Modify / maintain a device in 72 the CR 5 Relocr.te a device in the CR 18 6 New nameplates or demarcation 132 Administrative 7 Housekeeping 3 8 Training 7 9 Procedure 4 10 Studies or Analysis 29 Corrective action on the open HED's will be implemented as described in I Section 7 of the Program Plan.

Pending NRC review and our implementation of remaining HED resolutions, this submittal completes our actions associated with the NUREG 0737 Supplement 1 item on conduct of a Detailed Control Room Design Review.

I 1

j RIIiR l Senior Li ensing Analyst CC Administrator, Region III, NRC NRC Resident Inspector - Big Rock Point Plant Attachments OC0887-0126-NLO2

f I

ATTACHMENT 1 Consumers Power Company Big Rock Point Plant Docket 50-155 )

H l

VOLUME V (APPENDIX 4) INS ~ERT August 25, 1987-l l

l 1

3 675 Pages ATT0887-0126-NLO2 1

t_____ _ _ . _ _ _ _ . _ . . __ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _