Category:INSPECTION REPORT
MONTHYEARIR 05000456/19990131999-09-17017 September 1999 Insp Repts 50-456/99-13 & 50-457/99-13 on 990706-0824. Violations Noted.Major Areas Inspected:C/As & Engineering Related Activities to Address Technical Concerns Identified During Design Insp Completed on 980424 IR 05000456/19990121999-09-0303 September 1999 Insp Repts 50-456/99-12 & 50-457/99-12 on 990707-0816.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000456/19990111999-07-29029 July 1999 Insp Repts 50-456/99-11 & 50-457/99-11 on 990525-0706.Two Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19990091999-07-20020 July 1999 Insp Repts 50-456/99-09 & 50-457/99-09 on 990517-0623.No Violations Noted.Major Areas Inspected:Licensee Radiation Protection Program.Circumstances Surrounding 990428, Gatehouse Monitor Exiting Incident Were Also Reviewed IR 05000456/19990071999-06-18018 June 1999 Insp Repts 50-456/99-07 & 50-457/99-07 on 990414-0524.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000457/19990081999-06-14014 June 1999 Insp Rept 50-457/99-08 on 990415-0518.No Violations Noted. Major Areas Inspected:Isi & SG Insp Program IR 05000456/19990051999-05-20020 May 1999 Insp Repts 50-456/99-05 & 50-457/99-05 on 990405-23.Non- Cited Violations Identified.Major Areas Inspected:Review of Engineering & Technical Support & Corrective Actions IR 05000456/19990061999-05-11011 May 1999 Insp Repts 50-456/99-06 & 50-457/99-06 on 990302-0413.One non-cited Violation Re Configuration Control Error Occurred. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000456/19990021999-03-23023 March 1999 Insp Repts 50-456/99-02 & 50-457/99-02 on 990120-0301.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19990041999-03-23023 March 1999 Insp Repts 50-456/99-04 & 50-457/99-04 on 990222-24 & 0303 Onsite & 0309 & 11 Region 3 Ofc.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000456/19980161999-02-11011 February 1999 Insp Rept 50-456/98-16 on 980916-990121.No Violations Noted. Major Areas Inspected:Containment Access Opening & Replacement Activities,Removal & Replacement of Sgs,Welding of SG Piping & Review of Quality Control Activities IR 05000456/19980201998-12-30030 December 1998 Insp Repts 50-456/98-20 & 50-457/98-20 on 981020-1207.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19980211998-12-10010 December 1998 Insp Repts 50-456/98-21 & 50-457/98-21 on 981110-24.No Violations Noted.Major Areas Inspected:Aspects of Corrective Actions & Engineering Involvement in Corrective Action Process IR 05000456/19980181998-12-0404 December 1998 Insp Rept 50-456/98-18 on 981015-23 & 1109-10.No Violations Noted.Major Areas Inspected:Four Areas Associated with Licensee SG Replacement Project IR 05000456/19980191998-11-25025 November 1998 Insp Repts 50-456/98-19 & 50-457/98-19 on 981027-30.No Violations Noted.Major Areas Inspected:Licensee Implementation of 10CFR50.65 Requirements for Monitoring Effectiveness of Maintenance at Nuclear Power Plants ML20195G3731998-11-17017 November 1998 Insp Repts 50-456/98-14 & 50-457/98-14 on 980909-1019. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000456/19980151998-11-13013 November 1998 Insp Repts 50-456/98-15 & 50-457/98-15 on 980915-1022. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Focusing on Radiological Controls for Unit 1 Outage Activities & SG Replacement Project IR 05000456/19980171998-11-10010 November 1998 Insp Repts 50-456/98-17 & 50-457/98-17 on 981013-19. Violations Noted.Major Areas Inspected:Security Measures Implemented to Support Steam Generator Replacement Project IR 05000456/19980121998-10-0505 October 1998 Insp Repts 50-456/98-12 & 50-457/98-12 on 980728-0908.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19980111998-09-25025 September 1998 Insp Rept 50-456/98-11 on 980707-09,15-16,0805-06,10-13 & 26-28.No Violations Noted.Major Areas Inspected:Review of SG Replacement Program.Insp Focused on Welding of SG Feedwater Piping & Preparation Activities for Replacing SGs IR 05000456/19980131998-08-28028 August 1998 Insp Repts 50-456/98-13 & 50-457/98-13 on 980810-14.No Violations Noted.Major Areas Inspected:Review of Chemistry & Radiation Protection Programs IR 05000456/19980091998-08-25025 August 1998 Insp Repts 50-456/98-09 & 50-457/98-09 on 980609-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20236N0941998-07-0606 July 1998 Insp Repts 50-456/98-08 & 50-457/98-08 on 980421-0608. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19980101998-07-0202 July 1998 Insp Repts 50-456/98-10 & 50-457/98-10 on 980615-19.No Violations Noted.Major Areas Inspected:Physical Security Program.Details Withheld (Ref 10CFR73.21) IR 05000456/19980071998-06-18018 June 1998 Insp Repts 50-456/98-07 & 50-457/98-07 on 980519-22.No Violations Noted.Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000456/19982011998-06-0101 June 1998 Insp Rept 50-456/98-201 on 980316-20,0330-0410 & 0420-24. No Violations Noted.Major Areas Inspected.Team Selected & Reviewed Relevant Portions of Ufsar,Ts,Drawings, Calculations,Mod Packages & Procedures IR 05000456/19980051998-05-19019 May 1998 Insp Repts 50-456/98-05 & 50-457/98-05 on 980310-0420. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000456/19980061998-04-21021 April 1998 Insp Repts 50-456/98-06 & 50-457/98-06 on 980331-0407. Violations Noted.Major Areas Inspected:Announced Review Protection Program.Insp Focused on Liquid & Gaseous Effluent Radiation Monitoring Programs ML20216B0761998-04-0808 April 1998 Insp Repts 50-456/98-02 & 50-457/98-02 on 980127-0309. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19980031998-03-16016 March 1998 Insp Repts 50-456/98-03 & 50-457/98-03 on 980128-30.No Violations Noted.Major Areas Inspected:Operations & Maint ML20203D9201998-02-20020 February 1998 Insp Repts 50-456/97-22 & 50-457/97-22 on 971216-980126. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000457/19970211998-02-11011 February 1998 Insp Rept 50-457/97-21 on 971112-21 & 980115.Violations Noted.Major Areas Inspected:Operations & Engineering ML20198G1231998-01-0707 January 1998 Partially Withheld Insp Repts 50-456/97-20 & 50-457/97-20 on 971117-21 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support Performance Involving Evaluation of Effectiveness of Physical Protection Program ML20202F1951998-01-0202 January 1998 Insp Repts 50-456/97-19 & 50-457/97-19 on 971104-1215. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20199A5781997-12-17017 December 1997 Insp Repts 50-456/97-16 & 50-457/97-16 on 970923-1103. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19970151997-11-26026 November 1997 Insp Repts 50-456/97-15 & 50-457/97-15 on 970812-0922. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000456/19970171997-11-17017 November 1997 Insp Repts 50-456/97-17 & 50-457/97-17 on 971006-22. Violations Noted.Major Areas Inspected:Plant Support & Radiation Protection Program IR 05000456/19970121997-10-17017 October 1997 Insp Repts 50-456/97-12 & 50-457/97-12 on 970414-0815. Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000456/19970131997-09-17017 September 1997 Insp Repts 50-456/97-13 & 50-457/97-13 on 970701-0811. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19970141997-09-12012 September 1997 Insp Repts 50-456/97-14 & 50-457/97-14 on 970811-15.No Violations Noted.Major Areas Inspected:Ro & SRO Requalification Training Programs IR 05000456/19970091997-08-26026 August 1997 Insp Repts 50-456/97-09 & 50-457/97-09 on 970520-0630. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20149J7051997-07-24024 July 1997 Insp Repts 50-456/97-11 & 50-457/97-11 on 970618-24.No Violations Noted.Major Areas Inspected:Plant Support Performance & Evaluation of Effectiveness of Radiation Protection Program IR 05000456/19970101997-06-26026 June 1997 Insp Rept 50-456/97-10 on 970403-0602.No Violations Noted. Major Areas Inspected:Maint ML20141E8371997-06-17017 June 1997 Insp Repts 50-456/97-07 & 50-457/97-07 on 970408-0520. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141H4431997-05-19019 May 1997 Enforcement Conference Repts 50-456/96-16 & 50-457/96-16 on 970514 in Lisle,Il.Major Areas Discussed:Apparent Violations Identified During Inspection,Along W/Corrective Actions Taken or Planned by Licensee ML20141J9301997-05-19019 May 1997 Insp Repts 50-456/97-08 & 50-457/97-08 on 970417-30. Violations Noted.Major Areas Inspected:Plant Support Performance ML20141D7711997-05-0909 May 1997 Insp Repts 50-456/97-05 & 50-457/97-05 on 970222-0407. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19970061997-04-10010 April 1997 Partially Withheld Insp Repts 50-456/97-06 & 50-457/97-06 on 970310-14.No Violations Noted.Major Areas Inspected: Evaluation of Performance of Security Organization & Review of Previous Open Items IR 05000456/19970041997-04-0808 April 1997 Insp Repts 50-456/97-04 & 50-457/97-04 on 970303-07. Violations Noted.Major Areas Inspected:Review of Emergency Preparedness Program,Aspect of Plant Support 1999-09-03
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000456/19990131999-09-17017 September 1999 Insp Repts 50-456/99-13 & 50-457/99-13 on 990706-0824. Violations Noted.Major Areas Inspected:C/As & Engineering Related Activities to Address Technical Concerns Identified During Design Insp Completed on 980424 IR 05000456/19990121999-09-0303 September 1999 Insp Repts 50-456/99-12 & 50-457/99-12 on 990707-0816.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000456/19990111999-07-29029 July 1999 Insp Repts 50-456/99-11 & 50-457/99-11 on 990525-0706.Two Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19990091999-07-20020 July 1999 Insp Repts 50-456/99-09 & 50-457/99-09 on 990517-0623.No Violations Noted.Major Areas Inspected:Licensee Radiation Protection Program.Circumstances Surrounding 990428, Gatehouse Monitor Exiting Incident Were Also Reviewed IR 05000456/19990071999-06-18018 June 1999 Insp Repts 50-456/99-07 & 50-457/99-07 on 990414-0524.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000457/19990081999-06-14014 June 1999 Insp Rept 50-457/99-08 on 990415-0518.No Violations Noted. Major Areas Inspected:Isi & SG Insp Program IR 05000456/19990051999-05-20020 May 1999 Insp Repts 50-456/99-05 & 50-457/99-05 on 990405-23.Non- Cited Violations Identified.Major Areas Inspected:Review of Engineering & Technical Support & Corrective Actions IR 05000456/19990061999-05-11011 May 1999 Insp Repts 50-456/99-06 & 50-457/99-06 on 990302-0413.One non-cited Violation Re Configuration Control Error Occurred. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000456/19990021999-03-23023 March 1999 Insp Repts 50-456/99-02 & 50-457/99-02 on 990120-0301.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19990041999-03-23023 March 1999 Insp Repts 50-456/99-04 & 50-457/99-04 on 990222-24 & 0303 Onsite & 0309 & 11 Region 3 Ofc.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000456/19980161999-02-11011 February 1999 Insp Rept 50-456/98-16 on 980916-990121.No Violations Noted. Major Areas Inspected:Containment Access Opening & Replacement Activities,Removal & Replacement of Sgs,Welding of SG Piping & Review of Quality Control Activities IR 05000456/19980201998-12-30030 December 1998 Insp Repts 50-456/98-20 & 50-457/98-20 on 981020-1207.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19980211998-12-10010 December 1998 Insp Repts 50-456/98-21 & 50-457/98-21 on 981110-24.No Violations Noted.Major Areas Inspected:Aspects of Corrective Actions & Engineering Involvement in Corrective Action Process IR 05000456/19980181998-12-0404 December 1998 Insp Rept 50-456/98-18 on 981015-23 & 1109-10.No Violations Noted.Major Areas Inspected:Four Areas Associated with Licensee SG Replacement Project IR 05000456/19980191998-11-25025 November 1998 Insp Repts 50-456/98-19 & 50-457/98-19 on 981027-30.No Violations Noted.Major Areas Inspected:Licensee Implementation of 10CFR50.65 Requirements for Monitoring Effectiveness of Maintenance at Nuclear Power Plants ML20195G3731998-11-17017 November 1998 Insp Repts 50-456/98-14 & 50-457/98-14 on 980909-1019. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000456/19980151998-11-13013 November 1998 Insp Repts 50-456/98-15 & 50-457/98-15 on 980915-1022. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Focusing on Radiological Controls for Unit 1 Outage Activities & SG Replacement Project IR 05000456/19980171998-11-10010 November 1998 Insp Repts 50-456/98-17 & 50-457/98-17 on 981013-19. Violations Noted.Major Areas Inspected:Security Measures Implemented to Support Steam Generator Replacement Project IR 05000456/19980121998-10-0505 October 1998 Insp Repts 50-456/98-12 & 50-457/98-12 on 980728-0908.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19980111998-09-25025 September 1998 Insp Rept 50-456/98-11 on 980707-09,15-16,0805-06,10-13 & 26-28.No Violations Noted.Major Areas Inspected:Review of SG Replacement Program.Insp Focused on Welding of SG Feedwater Piping & Preparation Activities for Replacing SGs IR 05000456/19980131998-08-28028 August 1998 Insp Repts 50-456/98-13 & 50-457/98-13 on 980810-14.No Violations Noted.Major Areas Inspected:Review of Chemistry & Radiation Protection Programs IR 05000456/19980091998-08-25025 August 1998 Insp Repts 50-456/98-09 & 50-457/98-09 on 980609-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20236N0941998-07-0606 July 1998 Insp Repts 50-456/98-08 & 50-457/98-08 on 980421-0608. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19980101998-07-0202 July 1998 Insp Repts 50-456/98-10 & 50-457/98-10 on 980615-19.No Violations Noted.Major Areas Inspected:Physical Security Program.Details Withheld (Ref 10CFR73.21) IR 05000456/19980071998-06-18018 June 1998 Insp Repts 50-456/98-07 & 50-457/98-07 on 980519-22.No Violations Noted.Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000456/19982011998-06-0101 June 1998 Insp Rept 50-456/98-201 on 980316-20,0330-0410 & 0420-24. No Violations Noted.Major Areas Inspected.Team Selected & Reviewed Relevant Portions of Ufsar,Ts,Drawings, Calculations,Mod Packages & Procedures IR 05000456/19980051998-05-19019 May 1998 Insp Repts 50-456/98-05 & 50-457/98-05 on 980310-0420. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000456/19980061998-04-21021 April 1998 Insp Repts 50-456/98-06 & 50-457/98-06 on 980331-0407. Violations Noted.Major Areas Inspected:Announced Review Protection Program.Insp Focused on Liquid & Gaseous Effluent Radiation Monitoring Programs ML20216B0761998-04-0808 April 1998 Insp Repts 50-456/98-02 & 50-457/98-02 on 980127-0309. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19980031998-03-16016 March 1998 Insp Repts 50-456/98-03 & 50-457/98-03 on 980128-30.No Violations Noted.Major Areas Inspected:Operations & Maint ML20203D9201998-02-20020 February 1998 Insp Repts 50-456/97-22 & 50-457/97-22 on 971216-980126. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000457/19970211998-02-11011 February 1998 Insp Rept 50-457/97-21 on 971112-21 & 980115.Violations Noted.Major Areas Inspected:Operations & Engineering ML20198G1231998-01-0707 January 1998 Partially Withheld Insp Repts 50-456/97-20 & 50-457/97-20 on 971117-21 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support Performance Involving Evaluation of Effectiveness of Physical Protection Program ML20202F1951998-01-0202 January 1998 Insp Repts 50-456/97-19 & 50-457/97-19 on 971104-1215. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20199A5781997-12-17017 December 1997 Insp Repts 50-456/97-16 & 50-457/97-16 on 970923-1103. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19970151997-11-26026 November 1997 Insp Repts 50-456/97-15 & 50-457/97-15 on 970812-0922. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000456/19970171997-11-17017 November 1997 Insp Repts 50-456/97-17 & 50-457/97-17 on 971006-22. Violations Noted.Major Areas Inspected:Plant Support & Radiation Protection Program IR 05000456/19970121997-10-17017 October 1997 Insp Repts 50-456/97-12 & 50-457/97-12 on 970414-0815. Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000456/19970131997-09-17017 September 1997 Insp Repts 50-456/97-13 & 50-457/97-13 on 970701-0811. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19970141997-09-12012 September 1997 Insp Repts 50-456/97-14 & 50-457/97-14 on 970811-15.No Violations Noted.Major Areas Inspected:Ro & SRO Requalification Training Programs IR 05000456/19970091997-08-26026 August 1997 Insp Repts 50-456/97-09 & 50-457/97-09 on 970520-0630. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20149J7051997-07-24024 July 1997 Insp Repts 50-456/97-11 & 50-457/97-11 on 970618-24.No Violations Noted.Major Areas Inspected:Plant Support Performance & Evaluation of Effectiveness of Radiation Protection Program IR 05000456/19970101997-06-26026 June 1997 Insp Rept 50-456/97-10 on 970403-0602.No Violations Noted. Major Areas Inspected:Maint ML20141E8371997-06-17017 June 1997 Insp Repts 50-456/97-07 & 50-457/97-07 on 970408-0520. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141H4431997-05-19019 May 1997 Enforcement Conference Repts 50-456/96-16 & 50-457/96-16 on 970514 in Lisle,Il.Major Areas Discussed:Apparent Violations Identified During Inspection,Along W/Corrective Actions Taken or Planned by Licensee ML20141J9301997-05-19019 May 1997 Insp Repts 50-456/97-08 & 50-457/97-08 on 970417-30. Violations Noted.Major Areas Inspected:Plant Support Performance ML20141D7711997-05-0909 May 1997 Insp Repts 50-456/97-05 & 50-457/97-05 on 970222-0407. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19970061997-04-10010 April 1997 Partially Withheld Insp Repts 50-456/97-06 & 50-457/97-06 on 970310-14.No Violations Noted.Major Areas Inspected: Evaluation of Performance of Security Organization & Review of Previous Open Items IR 05000456/19970041997-04-0808 April 1997 Insp Repts 50-456/97-04 & 50-457/97-04 on 970303-07. Violations Noted.Major Areas Inspected:Review of Emergency Preparedness Program,Aspect of Plant Support 1999-09-03
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000456/19990131999-09-17017 September 1999 Insp Repts 50-456/99-13 & 50-457/99-13 on 990706-0824. Violations Noted.Major Areas Inspected:C/As & Engineering Related Activities to Address Technical Concerns Identified During Design Insp Completed on 980424 IR 05000456/19990121999-09-0303 September 1999 Insp Repts 50-456/99-12 & 50-457/99-12 on 990707-0816.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000456/19990111999-07-29029 July 1999 Insp Repts 50-456/99-11 & 50-457/99-11 on 990525-0706.Two Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19990091999-07-20020 July 1999 Insp Repts 50-456/99-09 & 50-457/99-09 on 990517-0623.No Violations Noted.Major Areas Inspected:Licensee Radiation Protection Program.Circumstances Surrounding 990428, Gatehouse Monitor Exiting Incident Were Also Reviewed IR 05000456/19990071999-06-18018 June 1999 Insp Repts 50-456/99-07 & 50-457/99-07 on 990414-0524.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000457/19990081999-06-14014 June 1999 Insp Rept 50-457/99-08 on 990415-0518.No Violations Noted. Major Areas Inspected:Isi & SG Insp Program IR 05000456/19990051999-05-20020 May 1999 Insp Repts 50-456/99-05 & 50-457/99-05 on 990405-23.Non- Cited Violations Identified.Major Areas Inspected:Review of Engineering & Technical Support & Corrective Actions IR 05000456/19990061999-05-11011 May 1999 Insp Repts 50-456/99-06 & 50-457/99-06 on 990302-0413.One non-cited Violation Re Configuration Control Error Occurred. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000456/19990021999-03-23023 March 1999 Insp Repts 50-456/99-02 & 50-457/99-02 on 990120-0301.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19990041999-03-23023 March 1999 Insp Repts 50-456/99-04 & 50-457/99-04 on 990222-24 & 0303 Onsite & 0309 & 11 Region 3 Ofc.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000456/19980161999-02-11011 February 1999 Insp Rept 50-456/98-16 on 980916-990121.No Violations Noted. Major Areas Inspected:Containment Access Opening & Replacement Activities,Removal & Replacement of Sgs,Welding of SG Piping & Review of Quality Control Activities IR 05000456/19980201998-12-30030 December 1998 Insp Repts 50-456/98-20 & 50-457/98-20 on 981020-1207.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19980211998-12-10010 December 1998 Insp Repts 50-456/98-21 & 50-457/98-21 on 981110-24.No Violations Noted.Major Areas Inspected:Aspects of Corrective Actions & Engineering Involvement in Corrective Action Process IR 05000456/19980181998-12-0404 December 1998 Insp Rept 50-456/98-18 on 981015-23 & 1109-10.No Violations Noted.Major Areas Inspected:Four Areas Associated with Licensee SG Replacement Project IR 05000456/19980191998-11-25025 November 1998 Insp Repts 50-456/98-19 & 50-457/98-19 on 981027-30.No Violations Noted.Major Areas Inspected:Licensee Implementation of 10CFR50.65 Requirements for Monitoring Effectiveness of Maintenance at Nuclear Power Plants ML20195G3731998-11-17017 November 1998 Insp Repts 50-456/98-14 & 50-457/98-14 on 980909-1019. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000456/19980151998-11-13013 November 1998 Insp Repts 50-456/98-15 & 50-457/98-15 on 980915-1022. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Focusing on Radiological Controls for Unit 1 Outage Activities & SG Replacement Project IR 05000456/19980171998-11-10010 November 1998 Insp Repts 50-456/98-17 & 50-457/98-17 on 981013-19. Violations Noted.Major Areas Inspected:Security Measures Implemented to Support Steam Generator Replacement Project IR 05000456/19980121998-10-0505 October 1998 Insp Repts 50-456/98-12 & 50-457/98-12 on 980728-0908.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19980111998-09-25025 September 1998 Insp Rept 50-456/98-11 on 980707-09,15-16,0805-06,10-13 & 26-28.No Violations Noted.Major Areas Inspected:Review of SG Replacement Program.Insp Focused on Welding of SG Feedwater Piping & Preparation Activities for Replacing SGs IR 05000456/19980131998-08-28028 August 1998 Insp Repts 50-456/98-13 & 50-457/98-13 on 980810-14.No Violations Noted.Major Areas Inspected:Review of Chemistry & Radiation Protection Programs IR 05000456/19980091998-08-25025 August 1998 Insp Repts 50-456/98-09 & 50-457/98-09 on 980609-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20236N0941998-07-0606 July 1998 Insp Repts 50-456/98-08 & 50-457/98-08 on 980421-0608. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19980101998-07-0202 July 1998 Insp Repts 50-456/98-10 & 50-457/98-10 on 980615-19.No Violations Noted.Major Areas Inspected:Physical Security Program.Details Withheld (Ref 10CFR73.21) IR 05000456/19980071998-06-18018 June 1998 Insp Repts 50-456/98-07 & 50-457/98-07 on 980519-22.No Violations Noted.Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000456/19982011998-06-0101 June 1998 Insp Rept 50-456/98-201 on 980316-20,0330-0410 & 0420-24. No Violations Noted.Major Areas Inspected.Team Selected & Reviewed Relevant Portions of Ufsar,Ts,Drawings, Calculations,Mod Packages & Procedures IR 05000456/19980051998-05-19019 May 1998 Insp Repts 50-456/98-05 & 50-457/98-05 on 980310-0420. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000456/19980061998-04-21021 April 1998 Insp Repts 50-456/98-06 & 50-457/98-06 on 980331-0407. Violations Noted.Major Areas Inspected:Announced Review Protection Program.Insp Focused on Liquid & Gaseous Effluent Radiation Monitoring Programs ML20216B0761998-04-0808 April 1998 Insp Repts 50-456/98-02 & 50-457/98-02 on 980127-0309. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19980031998-03-16016 March 1998 Insp Repts 50-456/98-03 & 50-457/98-03 on 980128-30.No Violations Noted.Major Areas Inspected:Operations & Maint ML20203D9201998-02-20020 February 1998 Insp Repts 50-456/97-22 & 50-457/97-22 on 971216-980126. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000457/19970211998-02-11011 February 1998 Insp Rept 50-457/97-21 on 971112-21 & 980115.Violations Noted.Major Areas Inspected:Operations & Engineering ML20198G1231998-01-0707 January 1998 Partially Withheld Insp Repts 50-456/97-20 & 50-457/97-20 on 971117-21 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support Performance Involving Evaluation of Effectiveness of Physical Protection Program ML20202F1951998-01-0202 January 1998 Insp Repts 50-456/97-19 & 50-457/97-19 on 971104-1215. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20199A5781997-12-17017 December 1997 Insp Repts 50-456/97-16 & 50-457/97-16 on 970923-1103. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19970151997-11-26026 November 1997 Insp Repts 50-456/97-15 & 50-457/97-15 on 970812-0922. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000456/19970171997-11-17017 November 1997 Insp Repts 50-456/97-17 & 50-457/97-17 on 971006-22. Violations Noted.Major Areas Inspected:Plant Support & Radiation Protection Program IR 05000456/19970121997-10-17017 October 1997 Insp Repts 50-456/97-12 & 50-457/97-12 on 970414-0815. Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000456/19970131997-09-17017 September 1997 Insp Repts 50-456/97-13 & 50-457/97-13 on 970701-0811. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19970141997-09-12012 September 1997 Insp Repts 50-456/97-14 & 50-457/97-14 on 970811-15.No Violations Noted.Major Areas Inspected:Ro & SRO Requalification Training Programs IR 05000456/19970091997-08-26026 August 1997 Insp Repts 50-456/97-09 & 50-457/97-09 on 970520-0630. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20149J7051997-07-24024 July 1997 Insp Repts 50-456/97-11 & 50-457/97-11 on 970618-24.No Violations Noted.Major Areas Inspected:Plant Support Performance & Evaluation of Effectiveness of Radiation Protection Program IR 05000456/19970101997-06-26026 June 1997 Insp Rept 50-456/97-10 on 970403-0602.No Violations Noted. Major Areas Inspected:Maint ML20141E8371997-06-17017 June 1997 Insp Repts 50-456/97-07 & 50-457/97-07 on 970408-0520. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141H4431997-05-19019 May 1997 Enforcement Conference Repts 50-456/96-16 & 50-457/96-16 on 970514 in Lisle,Il.Major Areas Discussed:Apparent Violations Identified During Inspection,Along W/Corrective Actions Taken or Planned by Licensee ML20141J9301997-05-19019 May 1997 Insp Repts 50-456/97-08 & 50-457/97-08 on 970417-30. Violations Noted.Major Areas Inspected:Plant Support Performance ML20141D7711997-05-0909 May 1997 Insp Repts 50-456/97-05 & 50-457/97-05 on 970222-0407. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19970061997-04-10010 April 1997 Partially Withheld Insp Repts 50-456/97-06 & 50-457/97-06 on 970310-14.No Violations Noted.Major Areas Inspected: Evaluation of Performance of Security Organization & Review of Previous Open Items IR 05000456/19970041997-04-0808 April 1997 Insp Repts 50-456/97-04 & 50-457/97-04 on 970303-07. Violations Noted.Major Areas Inspected:Review of Emergency Preparedness Program,Aspect of Plant Support 1999-09-03
[Table view] Category:UTILITY
MONTHYEARIR 05000456/19900181990-11-16016 November 1990 Insp Repts 50-456/90-18 & 50-457/90-20 on 900817-1030.No Violations or Deviations Noted.Major Areas Inspected: Selected Startup Core Performance Testing & Surveillances Performed Subsequent to Initial Core Reload IR 05000456/19900201990-10-22022 October 1990 Insp Rept 50-456/90-20 on 901004-06.No Violations or Deviations Noted.Major Areas Inspected:Review of Operator Performance & Supervisory Overview During Incident Determining Adequacy of Operating Procedures IR 05000456/19900131990-08-17017 August 1990 Insp Repts 50-456/90-13 & 50-457/90-16 on 900617-0728. Violations Noted.Major Areas Inspected:Lers,Follow Up on TMI Action Items,Increase in Unit 1 I-131 Activity & Condenser Tube Leak & Unit 2 Heat Flux Hot Channel Factor IR 05000456/19900151990-07-25025 July 1990 Partially Withheld Physical Security Insp Repts 50-456/90-15 & 50-457/90-18 on 900621-27 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Protected & Vital Area Physical Barriers,Detection & Assessment Aids & Packages & Vehicles IR 05000456/19900121990-07-16016 July 1990 Safety Insp Repts 50-456/90-12 & 50-457/90-15 on 900429- 0616.Violations Noted.Major Areas Inspected:Licensee LER Review,Operational Safety Verification,Radiation Protection, Security & ESF Sys IR 05000456/19900141990-06-28028 June 1990 Insp Repts 50-456/90-14 & 50-457/90-17 on 900618-22.No Violations or Deviations Noted.Major Areas Inspected: Implementation of 10CFR50.62 & ATWS Rule IR 05000456/19900081990-06-14014 June 1990 Insp Repts 50-456/90-08 & 50-457/90-08 on 900416-20 & 0430- 0504.Violations Noted.Major Areas Inspected:Fire Protection, Inservice Testing,Support of Maint & Related Mgt Activities IR 05000456/19900101990-05-17017 May 1990 Insp Repts 50-456/90-10 & 50-457/90-11 on 900318-0428. Violations Noted.Major Areas Inspected:Operational Safety Verification,Monthly Maint/Surveillance Observation & Contractor Health Physics Technician Strike IR 05000456/19890221989-09-25025 September 1989 Insp Repts 50-456/89-22 & 50-457/89-22 on 890730-0916. Violations Noted.Major Areas Inspected:Ler Review,Followup on Temporary Instructions,Self Assessment,Osha Issues, Inspector Inquiries & Degraded Main Steam Safety Valve IR 05000456/19890241989-09-12012 September 1989 Insp Repts 50-456/89-24 & 50-457/89-24 on 890703-0901. Violations Noted.Major Areas Inspected:Operational Radiation Protection Program & Radwaste Program,Including Changes in Personnel,Audits & Appraisals & Outage Planning IR 05000456/19890211989-08-31031 August 1989 Insp Repts 50-456/89-21 & 50-457/89-21 on 890731-0815. Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans,Audits,Protected & Vital Area Physical Barriers,Detection & Assessment Aids.Info Withheld IR 05000456/19890161989-08-21021 August 1989 Safety Insp Repts 50-456/89-16 & 50-457/89-16 on 890731- 0803.Allegations Unsubstantiated.Major Areas Inspected: Allegations Re NDE & Corrosion of Small Bore Piping IR 05000456/19890191989-08-0404 August 1989 Safety Insp Repts 50-456/89-19 & 50-457/89-19 on 890618- 0729.No Violations or Deviations Noted.Major Areas Inspected:Ler Review,Regional Request,Followup on TMI Action Items & Fuel Handling IR 05000456/19890181989-07-24024 July 1989 Safety Team Insp Rept 50-456/89-18 on 890612-0706.No Violations or Deviations Noted.Major Areas Inspected: Instrumentation Sys for Assessing Plant Conditions During & Following Accidents as Specified in Reg Guide 1.97,Rev 3 IR 05000456/19890151989-06-23023 June 1989 Insp Repts 50-456/89-15 & 50-457/89-15 on 890430-0617.No Violations Noted.Unresolved Item Noted Re Operator Logs. Major Areas Inspected:Ler Review,Regional Request,Followup on TMI Action Items & Operational Safety Verification IR 05000456/19890171989-06-22022 June 1989 Insp Repts 50-456/89-17 & 50-457/89-17 on 890601-20. Violation Noted Re ECCS Operability.Major Areas Inspected: Inoperability of Centrifugal Charging Pump 2B While Manual Isolation Valve in Recirculation Line Shut IR 05000456/19890111989-06-16016 June 1989 Safety Insp Repts 50-456/89-11 & 50-457/89-11 on 890508-24. No Violations Noted.Major Areas Inspected:Verify That Util Emergency Operating Procedures Technically Correct & Usable IR 05000456/19890091989-05-15015 May 1989 Safety Insp Repts 50-456/89-09 & 50-457/89-09 on 890319-0429.Violations Noted.Major Areas Inspected:Ler Review,Followup on TMI Action Items,Unit 2 Boron Dilution Prevention Sys Inoperability & Training Effectiveness IR 05000456/19890121989-05-0303 May 1989 Partially Withheld Physical Security Insp Repts 50-456/89-12 & 50-457/89-12 on 890410-14 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Mgt Support,Access Control - Personnel,Packages & Vehicles IR 05000456/19890051989-03-29029 March 1989 Insp Repts 50-456/89-05 & 50-457/89-05 on 890203-0318.No Violations Noted.Major Areas Inspected:Licensee Action on Previously Identified Items,Ler Review,Regional Request, Followup on TMI Action Item,Esf Sys & Security IR 05000456/19890041989-03-17017 March 1989 Corrected Table 2 & Revised Descriptive Text to Insp Repts 50-456/89-04 & 50-457/89-04,correcting Licensee Fe-55 Value IR 05000456/19890061989-03-14014 March 1989 Insp Repts 50-456/89-06 & 50-457/89-06 on 890214-17. Violations Noted.Major Areas Inspected:Changes in Personnel, Audits & Appraisals,Planning & Preparation,External & Internal Exposure Controls & Control of Radioactive Matls ML20245J2431989-02-17017 February 1989 Insp Repts 50-456/89-04 & 50-457/89-04 on 890110-13 & 18-20. No Violations Noted.Major Areas Inspected:Chemistry Program, Including Procedures,Organization & Training,Primary & Secondary Sys Water QC Programs & QA in Lab IR 05000456/19880281988-11-17017 November 1988 Insp Repts 50-456/88-28 & 50-457/88-28 on 881015-1103.No Violations Noted.Major Areas Inspected:Events Surrounding Several Missed or Improperly Performed Tech Spec Surveillances IR 05000456/19880271988-11-0808 November 1988 Insp Repts 50-456/88-27 & 50-457/88-27 on 881017-22.No Violations,Deficiencies or Deviations Noted.Major Areas Inspected:Followup on Actual Emergency Preparedness Program & Previously Identified Items IR 05000456/19880261988-10-27027 October 1988 Insp Repts 50-456/88-26 & 50-457/88-26 on 880828-1015. Violations Noted.Major Areas Inspected:Ler Review,Secondary Chemistry Excursion,Startup Test Observation,Operational Safety Verification,Esf & Training Effectiveness IR 05000456/19880251988-09-23023 September 1988 Insp Repts 50-456/88-25 & 50-457/88-25 on 880829-0908.No Violations or Deviations Noted.Major Areas Inspected: Operational Radiation Protection Program & Gaseous Liquid & Solid Radwaste Programs ML20154J2101988-09-14014 September 1988 Insp Repts 50-456/88-22 & 50-457/88-22 on 880710-0827.No Violations or Deviations Noted.Major Areas Inspected:Ler Review,Heat Wave Effect,Startup Test Observation, Verification,Radiological Protection & Physical Security IR 05000456/19880021988-08-17017 August 1988 Insp Repts 50-456/88-02 & 50-457/88-02 on 871120-880722.No Violations Noted.Major Areas Inspected:Alleged Use & Sale of Drugs by Some Named Contractors Employed at Site & Criminal Records of Some Employees ML20151J6491988-07-22022 July 1988 Enforcement Conference Repts 50-456/88-23 & 50-457/88-23 on 880718.Major Areas Discussed:Enforcement Options, Circumstances Surrounding & Corrective Actions in Response to Violation Re Inattentiveness to Duty IR 05000456/19880191988-07-19019 July 1988 Safety Insp Repts 50-456/88-19 & 50-457/88-19 on 880529- 0709.No Violations Noted.Major Areas Inspected:Licensee Action on Previously Identified Items,Emergency Preparedness,Followup on TMI Action Items & Events ML20150B5521988-07-0101 July 1988 Partially Withheld Physical Security Insp Repts 50-456/88-20 & 50-457/88-20 on 880620 (Ref 10CFR2.790).Violations Noted. Major Areas Inspected:Compensatory Measures & Access Control & Incident Involving Inattentiveness of Security Officers ML20154C9121988-07-0101 July 1988 Insp Repts 50-456/88-20 & 50-457/88-20 on 880620.Violation Noted.Major Areas Inspected:Compensatory Measures & Access Control Re NRC Identified Incident Involving Inattentiveness to Duty Issue of Security Officers IR 05000456/19880181988-06-28028 June 1988 Partially Withheld Insp Repts 50-456/88-18 & 50-457/88-18 on 880606-10 & 0614-21.No Violations Noted.Major Areas Inspected:Mgt Effectiveness,Security Organization & Program Audit,Records & Repts & Physical Barriers IR 05000456/19880171988-06-21021 June 1988 Insp Repts 50-456/88-17 & 50-457/88-17 on 880524-26 & 0531-0602.No Deviations Noted.Violation Noted.Major Areas Inspected:Plant Chemistry Organization,Mgt Controls,Qa & Confirmatory Measurements for Plant Radiochemical Analyses IR 05000456/19880131988-06-15015 June 1988 Insp Repts 50-456/88-13 & 50-457/88-14 on 880410-0528. Violations Noted.Major Areas Inspected:Previously Identified Items,Ler Review,Startup Test Observation,Operational Safety Verification,Radiological Protection & Security IR 05000454/19880081988-05-27027 May 1988 Insp Repts 50-454/88-08,50-455/88-08 & 50-456/88-16 on 880509-19.No Violations or Deviations Noted.Major Areas Inspected:Review of Action on Previous Insp Items & Followup on SER Items ML20154Q3861988-05-27027 May 1988 Insp Repts 50-456/88-05 & 50-457/88-06 on 880229-0504. Deviations Noted.Major Areas Inspected:Licensee Action on Ser/Technical Evaluation Rept Commitments & Environ Qualification Program Compliance to 10CFR50.49 IR 05000456/19880141988-05-0505 May 1988 Safety Insp Repts 50-456/88-14 & 50-457/88-15 on 880419-27. No Violations or Deviations Noted.Major Areas Inspected: Actions on Previous Insp Items ML20151Z4871988-05-0202 May 1988 Partially Withheld Physical Security Insp Repts 50-456/88-15 & 50-457/88-16 on 880420-21 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Licensee Reported Security Event on 880419 Re Control Access to Vital Area IR 05000456/19880101988-04-20020 April 1988 Insp Repts 50-456/88-10 & 50-457/88-11 on 880314-30.No Violations or Deviations Noted.Major Areas Inspected:Status of Fire Protection License Conditions & Open Items IR 05000456/19880081988-04-18018 April 1988 Insp Repts 50-456/88-08 & 50-457/88-09 on 880214-0409. Violations Noted.Major Areas Inspected:Confirmatory Action Ltrs,Regional Requests,Followup on TMI Action Items,Control Room Log Entries & Physical Security ML20151H5681988-04-14014 April 1988 Safety Insp Repts 50-456/88-13 & 50-457/88-11 on 880314-25. Violation Noted.Major Areas Inspected:Events Surrounding Inoperability of Nonaccessible Area Exhaust Filter Plenums IR 05000457/19880121988-04-12012 April 1988 Safety Insp Rept 50-457/88-12 on 880314-25.Violation Noted. Major Areas Inspected:Event in Which 2B Safety Injection Pump Found Incapable of Performing Intended Function When Pump Manual Discharge Valve Found Locked Shut ML20150E9701988-03-29029 March 1988 Operational Readiness Insp Rept 50-457/88-07 on 880216-0307. Violations Noted.Major Areas Inspected:Operations, Surveillance & Testing,Maint,Radiation Controls,Chemistry Controls,Nuclear Engineering Activities & Training IR 05000456/19880091988-03-28028 March 1988 Safety Insp Repts 50-456/88-09 & 50-457/88-10 on 880303-07. No Violations or Deviations Noted.Major Areas Inspected: Allegation Riii 88-A-0009 ML20150E9921988-03-25025 March 1988 Insp Rept 50-456/88-07 on 880301-17.Apparent Violation Noted:Failure to Have Control Room Ventilation Sys Operable. Appropriate Enforcement Action Will Be Determined.Major Areas Inspected:Licensee Actions Following Startup Test IR 05000456/19870381988-03-17017 March 1988 Insp Repts 50-456/87-38 & 50-457/87-36 on 871005-1222, 880119,0218 & 26.Violations & Deviations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings & Review of Electrical & Instrumentation Components IR 05000456/19880041988-03-0909 March 1988 Insp Repts 50-456/88-04 & 50-457/88-05 on 880113-0216.No Violations or Deviations Noted.Major Areas Inspected: Operational Radiation Protection Program,Including Licensee Action on Previous Insp Findings & Organization IR 05000456/19880061988-03-0909 March 1988 Safety Insp Repts 50-456/88-06 & 50-457/88-08 on 880216-25. No Violations or Deviations Noted.Major Area Inspected: Licensee Implementation of Generic Ltr 83-28 in Areas of Equipment Classification & Vendor Interface 1990-08-17
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000456/19990131999-09-17017 September 1999 Insp Repts 50-456/99-13 & 50-457/99-13 on 990706-0824. Violations Noted.Major Areas Inspected:C/As & Engineering Related Activities to Address Technical Concerns Identified During Design Insp Completed on 980424 IR 05000456/19990121999-09-0303 September 1999 Insp Repts 50-456/99-12 & 50-457/99-12 on 990707-0816.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000456/19990111999-07-29029 July 1999 Insp Repts 50-456/99-11 & 50-457/99-11 on 990525-0706.Two Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19990091999-07-20020 July 1999 Insp Repts 50-456/99-09 & 50-457/99-09 on 990517-0623.No Violations Noted.Major Areas Inspected:Licensee Radiation Protection Program.Circumstances Surrounding 990428, Gatehouse Monitor Exiting Incident Were Also Reviewed IR 05000456/19990071999-06-18018 June 1999 Insp Repts 50-456/99-07 & 50-457/99-07 on 990414-0524.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000457/19990081999-06-14014 June 1999 Insp Rept 50-457/99-08 on 990415-0518.No Violations Noted. Major Areas Inspected:Isi & SG Insp Program IR 05000456/19990051999-05-20020 May 1999 Insp Repts 50-456/99-05 & 50-457/99-05 on 990405-23.Non- Cited Violations Identified.Major Areas Inspected:Review of Engineering & Technical Support & Corrective Actions IR 05000456/19990061999-05-11011 May 1999 Insp Repts 50-456/99-06 & 50-457/99-06 on 990302-0413.One non-cited Violation Re Configuration Control Error Occurred. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000456/19990021999-03-23023 March 1999 Insp Repts 50-456/99-02 & 50-457/99-02 on 990120-0301.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19990041999-03-23023 March 1999 Insp Repts 50-456/99-04 & 50-457/99-04 on 990222-24 & 0303 Onsite & 0309 & 11 Region 3 Ofc.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000456/19980161999-02-11011 February 1999 Insp Rept 50-456/98-16 on 980916-990121.No Violations Noted. Major Areas Inspected:Containment Access Opening & Replacement Activities,Removal & Replacement of Sgs,Welding of SG Piping & Review of Quality Control Activities IR 05000456/19980201998-12-30030 December 1998 Insp Repts 50-456/98-20 & 50-457/98-20 on 981020-1207.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000456/19980211998-12-10010 December 1998 Insp Repts 50-456/98-21 & 50-457/98-21 on 981110-24.No Violations Noted.Major Areas Inspected:Aspects of Corrective Actions & Engineering Involvement in Corrective Action Process IR 05000456/19980181998-12-0404 December 1998 Insp Rept 50-456/98-18 on 981015-23 & 1109-10.No Violations Noted.Major Areas Inspected:Four Areas Associated with Licensee SG Replacement Project IR 05000456/19980191998-11-25025 November 1998 Insp Repts 50-456/98-19 & 50-457/98-19 on 981027-30.No Violations Noted.Major Areas Inspected:Licensee Implementation of 10CFR50.65 Requirements for Monitoring Effectiveness of Maintenance at Nuclear Power Plants ML20195G3731998-11-17017 November 1998 Insp Repts 50-456/98-14 & 50-457/98-14 on 980909-1019. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering ML20195G3681998-11-17017 November 1998 Notice of Violation from Insp on 980909-1019.Violation Noted:As of 980818,licensee Failed to Initiate Measures to Determine Cause or Take Action to Preclude Recurrence of Loose Bolts on Two EDG Lubricating Oil Heat Exchanger Bells ML20195G3031998-11-13013 November 1998 Notice of Violation from Insp on 980915-1022.Violation Noted:On 981022,two Individuals Working Under RWP 984014 Removed Outer Rubber Gloves While Replacing Insulation in Containment IR 05000456/19980151998-11-13013 November 1998 Insp Repts 50-456/98-15 & 50-457/98-15 on 980915-1022. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Focusing on Radiological Controls for Unit 1 Outage Activities & SG Replacement Project IR 05000456/19980171998-11-10010 November 1998 Insp Repts 50-456/98-17 & 50-457/98-17 on 981013-19. Violations Noted.Major Areas Inspected:Security Measures Implemented to Support Steam Generator Replacement Project ML20196D9201998-11-10010 November 1998 Notice of Violation from Insp on 981013-19.Violation Noted: Licensee Security Staff Discovered That on Three Occasions Between 980826 & 1002,security Officers Were Found Asleep on Post IR 05000456/19983051998-11-0202 November 1998 Exam Repts 50-456/98-305 & 50-457/98-305 on 980914 with Telephoned Exam Results 981020.No Violations Noted.Exam Results:Applicant Passed Retake Exam & Was Issued Reactor Operator License IR 05000456/19980121998-10-0505 October 1998 Insp Repts 50-456/98-12 & 50-457/98-12 on 980728-0908.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19980111998-09-25025 September 1998 Insp Rept 50-456/98-11 on 980707-09,15-16,0805-06,10-13 & 26-28.No Violations Noted.Major Areas Inspected:Review of SG Replacement Program.Insp Focused on Welding of SG Feedwater Piping & Preparation Activities for Replacing SGs IR 05000456/19980131998-08-28028 August 1998 Insp Repts 50-456/98-13 & 50-457/98-13 on 980810-14.No Violations Noted.Major Areas Inspected:Review of Chemistry & Radiation Protection Programs IR 05000456/19980091998-08-25025 August 1998 Insp Repts 50-456/98-09 & 50-457/98-09 on 980609-0727. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20236N0911998-07-0606 July 1998 Notice of Violations from Insp on 980421-0608.Violations Noted:On 980424,licensee Failed to Implement Specific Fire Protection Program Requirements in That Welding Machine Was Left Unattended & Energized in Fuel Handling Bldg ML20236N0941998-07-0606 July 1998 Insp Repts 50-456/98-08 & 50-457/98-08 on 980421-0608. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000456/19980101998-07-0202 July 1998 Insp Repts 50-456/98-10 & 50-457/98-10 on 980615-19.No Violations Noted.Major Areas Inspected:Physical Security Program.Details Withheld (Ref 10CFR73.21) IR 05000456/19980071998-06-18018 June 1998 Insp Repts 50-456/98-07 & 50-457/98-07 on 980519-22.No Violations Noted.Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000456/19982011998-06-0101 June 1998 Insp Rept 50-456/98-201 on 980316-20,0330-0410 & 0420-24. No Violations Noted.Major Areas Inspected.Team Selected & Reviewed Relevant Portions of Ufsar,Ts,Drawings, Calculations,Mod Packages & Procedures IR 05000456/19980051998-05-19019 May 1998 Insp Repts 50-456/98-05 & 50-457/98-05 on 980310-0420. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20248D0821998-05-19019 May 1998 Notice of Violation from Insp on 980310-0420.Violation Noted:On 980303,licensee Failed to Implement Braidwood Administrative Procedure 2321-18T11,Step E.1,for Sf Pool Skimmer Strainer Level Control IR 05000456/19983041998-04-29029 April 1998 NRC Operator Licensing Exam Repts 50-456/98-304OL & 50-457/98-304OL (Including Completed & Graded Tests) Administered During Wk of 980413 ML20217F5281998-04-21021 April 1998 Notice of Violation from Insp on 980331-0407.Violation Noted:Licensee Failed to Check That SG Worker Dosimetry Was Present & Correctly Worn IR 05000456/19980061998-04-21021 April 1998 Insp Repts 50-456/98-06 & 50-457/98-06 on 980331-0407. Violations Noted.Major Areas Inspected:Announced Review Protection Program.Insp Focused on Liquid & Gaseous Effluent Radiation Monitoring Programs ML20216B0611998-04-0808 April 1998 Notice of Violation from Insp on 980127-0309.Violation Noted:On 971010,21,1219 & 980105,licensee Failed to Require Independent Verification of Proper Sys Alignment for safety-related Valves Repositioned in Steps F.1.4 & F.1.7 ML20216B0761998-04-0808 April 1998 Insp Repts 50-456/98-02 & 50-457/98-02 on 980127-0309. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000456/19980031998-03-16016 March 1998 Insp Repts 50-456/98-03 & 50-457/98-03 on 980128-30.No Violations Noted.Major Areas Inspected:Operations & Maint ML20203D9201998-02-20020 February 1998 Insp Repts 50-456/97-22 & 50-457/97-22 on 971216-980126. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20203D9151998-02-20020 February 1998 Notice of Violation from Insp on 971216-980126.Violation Noted:In Nov 1989,licensee Failed to Initiate Deviation Rept & Take Corrective Measures to Preclude Repetition of Mechanical Failure to All 4 Main Feedwater Check Valves ML20202F2321998-02-11011 February 1998 Notice of Violations from Insp on 971112-21 & 980115. Violations Noted:Licensee Failed to Follow NSWP-A-15 & Bwap 330-10 Requirements to Issue PIF for Tempering Line Snubber Considered Inoperable on 971110 IR 05000457/19970211998-02-11011 February 1998 Insp Rept 50-457/97-21 on 971112-21 & 980115.Violations Noted.Major Areas Inspected:Operations & Engineering PNO-III-98-013, on 980126,turbine Tripped Causing Subsequent Reactor Trip.Cause of Turbine Trip Remains Under Investigation.Appears Replacement Circuit Board Had Incorrect Electronic Configuration1998-01-29029 January 1998 PNO-III-98-013:on 980126,turbine Tripped Causing Subsequent Reactor Trip.Cause of Turbine Trip Remains Under Investigation.Appears Replacement Circuit Board Had Incorrect Electronic Configuration ML20198G1231998-01-0707 January 1998 Partially Withheld Insp Repts 50-456/97-20 & 50-457/97-20 on 971117-21 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support Performance Involving Evaluation of Effectiveness of Physical Protection Program ML20202F1951998-01-0202 January 1998 Insp Repts 50-456/97-19 & 50-457/97-19 on 971104-1215. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 07100104/20120151998-01-0202 January 1998 Notice of Violation from Insp on 971104-1215.Violation Noted:On 971102,inspectors Identified That Licensee Had Failed to Fasten Covers on Incore Neutron Detector Drive Mechanism IR 05000456/19973101997-12-29029 December 1997 NRC Operator Licensing Exam Repts 50-456/97-310OL & 50-457/97-310OL for Tests Administered on 971006-1107.Three Senior Reactor Operators & One Reactor Operator Passed Exam. One Senior Reactor & One Reactor Operator Failed ML20199A5681997-12-17017 December 1997 Notice of Violation from Insp on 970923-1103.Violation Noted:On 971014,licensee Instrument Technician Made Error When Changing Setpoints on Unit 2 Containment Area Radiation Monitor 2AR11J.Error Resulted in High Radiation Alarm 1999-09-03
[Table view] |
Text
.. -- - -- -.
,
.
U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Reports No. 50-456/86045(DRS);50-457/86033(DRS)
Docket Nos. 50-456; 50-457 License No. NPF-59 and Construction Permit No. CPPR-133 Licensee: Comonwealth Edison Company Post Office Box 767-Chicago, IL 60690 Facility Name: Braidwood Station, Units 1 and 2 Inspection At: Braidwood Site, Braidwood, Illinois
-
Inspection Conducted: August 18 through October 22, 1986
)
'
Inspectors: Je ff Holmes (RIII)
bd hh ll D~a/7/
te %
6m Approved By: James W. Muffett, Chief r D l16 b Plant System Section Date I,
Inspec_t_i_on e Sumary I
Inspection on o 22,,_19_8_6 (R_epor_ts_ N_o_.__50-45_6/8_6045]DRS);
l 50-457/Mi(f3M
-
~~ ~ RS)JD_Augus_t_18_thru October
'A'rea's Iiispec_t_e_d: Special announced inspection by Region III based inspectors
! and their consultants to determine the adequacy of the facility's post fire
'
safe shutdown methods, and a review of the licensee's routine fire protection program. This inspection was conducted in accordance with Terrporary Inspection Procedure No. 2515/62, Revision 2.
Results: Of the areas inspected, no violations or deviations were identified.
I
!
8611130036 861107 6 i PDR ADOCK 0500
- a
_ . _ _ . _ - - _ - . _ _ _ _ _ _ . _ _ _ _ _ .._,._ _ .,. _ -._ _ _. . . - _ _ _ . . , _ _ _ _ _ . _ _ _ . _ . . _ _ __
I
'
.
DETAILS 1. Persons Contacted
- M. Wallace, Project Manager
- P. Barnes, Regulatory Assurance Supervisor
- P. Boyle, Regulatory Assurance
- J. Bruciak, Project Construction
- C. Diaz, Fire Protection Engineer
- D. Elias, Project Engineer
- P. Holland, Regulatory Assurance
+S. Hunsader,
- J. Kinsello, Assistant Fire Marshal
- L. Kline, Regulatory Assurance
- R. Kyrowac, Station QA Supervisor
- M. Lohmann, Assistant Construction Superintendent
+G. Masters, Operating Engineer
+*T. Meyer, Fire Marshal
+*G. O'Donnell, Fire Protection Engineer
+*M. Pietraszewski, Engineer
- H. Pontious, Regulatory Assurance
- T. Prewdergast, Construction Quality Assurance Engineer
- K. Radke, Assistant Fire Marshall
- B. Rybak, Station Nuclear Engineer
- C. Schroeder, Services Superintendent
+*T. W. Simpkin, Regulatory Assurance
- D. Thornley, Project Construction
- L. Weber, SF Sargent and Lundy Engineers
+*E. Crass, Licensing Project Engineer
- J. Kish, Electrical Engineer
- B. Salsbury, Mechanical Engineer
- J. Reuan, Electrical Project Engineer Marsh & McLennan Protection Consultants
- S. Chingo, Fire Protection Engineer Nuclear Regulatory Commission
,
- G. Gardner, Section Chief
- Kropp, Senior Resident Inspector (Construction)
- T. Taylor, Resident Inspector (OPS)
+*T. Tongue, Senior Resident Inspector (OPS)
- Denotes those persons present at the preliminary exit interview on August 22, 198 + Denotes those persons present at the exit interview on October 22, 198 *
. Alternate Safe Shutdown Procedures
'
The licensee's procedure entitled " Control Room Inaccessibility - Unit'1,"
1BWOA PRI-5, Revision 1 was reviewed. This procedure for alternative shutdown from outside the control room specifies the use of electrical
'
and pneumatic jumpers to maintain hot standby in the course of blocking or resetting spurious safety injection signals which may have been caused by the initiating fir Specifically, such actions are identified in Appendices C and E of the Procedure and would be taken in the Auxiliary Electrical Equipment Room (AEER) shortly after reactor trip (Step 4). However, a fire in the AEER itself requires evacuation of the control room and is a situation governed by this procedure. The licensee's intent is to terminate any uncontrolled injection into the reactor coolant system which could cause loss of control of the pressurizer level and pressure, since letdown flow can not be established at this point.
I In addition to the apparent contradiction of Appendix R, Sections III. ,
and III.L requirenents that repairs in the form of applying jumpers can
! only be allowed to achieve and maintain cold shutdown and not to maintain hot standby, the procedure as currently written therefore calls for actions which are highly inadvisable by directing actions to occur in the AEER inmediately after a postulated fire in the AEER and reactor tri The licensee's contention that this is a generic problem could not be verified during the time of the audit. The licensee is requested to demonstrate that Sections III.G.1 and III C are not violated when I maintaining hot standby should a fire occur in the Control Room or the
- AEE In the Braidwood Safety Evaluation Report Supplement No. 2 dated October
"
1986, it states "By letters dated September 25 and 30, 1986, the
- applicant revised the PRI-5 Procedures (which will prevent operators from
'
using the jumpers at attain hot standby from AEER) for the safety injection system. The revised procedures will call for performing the functions manually at the SI Pumps, as stated in Attachment K of the
' PRI-5 Procedures. The staff finds this acceptable, and, therefore, this item is closed." Accessibility,to Valves Utilized for Safe Shutdown The walkdown of the procedure entitled " Control Room Inaccessibility, Revision 1," No. 1BWOA PRI-5 dated July 18, 1985 identified that the access to valves and other components was extremely difficult due to numerous obstructions. As discussed with the licensee, obstructions such as HVAC duct work, pipe supports and consideration of the planned emergency lighting (also refer to Section 17 of this report) for access to and egress from safe shutdown related components should be reviewed by human factors personne . . - - - --- - . - --- , . _ . - . . - - - - - . - . - . - - - ,
.
This is considered an Open Item (456/86045-01; 457/86033-01) pending Region III verification of the proper final configuration prior to Initial Criticalit . Operators Awareness in Util_izing S_afe_Sh_utdown Procedure Based on a review and walkdown cf the procedure entitled " Control Room Inaccessibility - Unit 1," 1BWOA PRI-5, Revision 1 the licensee should clearly identify either in the procedure or on the remote stutdown panels, or both, those instruments and controls that are electricali., isolated I from the control room when the transfer switches are placed in the remote position. The transfer switches are placed in remote to prevent spurious signals. The operators should be trained to recognize the possible spurious actuations or indications caused by a fire. In particular, the procedures should indicate, and the operators should be trained to be aware, that the fire hazards panel is also electrically isolated from the control room to prevent spurious signal This concern has also been identified in the Braidwood Safety Evaluation Report Supplement (SER) No. 2, dated October 1986, and is being tracked as an Unresolved Item in the SE . _ Communications
_
The walkdown of the procedure entitled " Control Room Inaccessibility, Revision 1, No. 180WA PRI-5, dated July 18, 1985 identified that the portable radios was deficient, specifically between the remote shutdown panel and containment. The licensce indicated that the deficiency of the radios was caused by the temporary removal of power to the repeater station inside containment. In a telephone conversation on October 22, 1986, the licensee indicated to the inspector that portable radios can only be used during refueling because of noise spiking. The licensee indicated that there are other means of conn:unication such as the paging system and the telephone system. The inspector questioned whether the paging system and the telephone would be available should a loss of off-site power occu The licensee indicated that the telephone system will be the only form of conniunication should a loss of offsite power occur because it receives power from the security diesel. This is considered an Open Item (456/86045-02; 457/86033-02) pending verification of adequate con;munication between the remote shutdown panel and containment by Region III prior to Initial Criticalit . High__ Low P_re_s_sure Interfaces
.
The applicant's safe shutdown ar,alysis identified two high low pressure interfaces, namely, the RHR pump suction lines and the pressurizer relief isolation valves. The applicant determined that the RHR/RCS isolation valves operate spuriously only when the control switch at the main control board is closed and the reactor pressure switch interlock is closed. Since the reactor pressure switch is remotely located from the control room, this n'ethod was found to be satisfactor *
.
The pressurizer isolation valves control circuitry is isolated from the control room by transfer switches and redundant fuses to provide an alternate source of 125 V DC control powe During the inspection, it was determined that the applicant has not performed a spurious signal analysis for the reactor vessel head vent valves 1RC-014A, B, C, and D. During the conference call held on August 28, 1986 between licensee and NRC, the applicant proposed the removal of power from these valves during normal operation. This concern has also been identified in the Braidwood Safety Evaluation leport (SER) Supplement No. 2 dated October 1986, and is being tracked as an Unresolved Item in the SE . Common Enclosure
)
The common enclosure concern occurs when redundant circuits are routed together in a raceway or enclosure and the circuits are not electrically protected or when the circuits can be destroyed by a fire due to inadequate fire protectio At the Braidwood plant the common enclosure concern was answered satisfactorily when a sample of circuits selected were found to be 6 electrically protecte In addition, the applicant stated that non-safety related circuits were never routed from one train to anothe The applicant does not mix safety related cables in raceways and conduit Power, control and instrumentation are run in separate cable trays. The applicant analyzed for all cor. figuration in which non-safety related cables which share an enclosure with safety related cable Therefore, the common enclosure concern was addressed satisfactorily by the applicant. The fire wraps which are required to protect redundant trains were not installed. The applicant was able to demonstrate with drawings and engineering change notices that provisions are underway to have the fire wraps installed. The installation of the fire wraps required to comply with Appendix R, III.G.2, is incomplete. The applicant plans to. start installing the fire wraps on or about September 2, 1986 and should be completed prior to exceeding 5%. This is considered an Open Item (456/86045-03; 457/86033-03) pending verification of the fire wrap by Region II . Inadequate Fire Protection to Achieve and Maintain Cold Shutdown In the auxiliary building elevation 346 feet, the inspectors observed that redundant RHR Systems (including pumps, motor, unit coolers and cables) were not seperated/ protected as required per the requirements of l Section C.5.b.(2) of the sta'f fire protection guideline In Amendment No. 7, it indicates that the RHR System could be repaired with 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> (which is the prescribed time to achieve and maintain shutdown, and i includes estimated times to complete any repairs). Allowance for repairs is consistent with the guidelines of Section C.5.b.(1) of BTP CMEB 9.5.1. However, the applicant's repair procedure only address repair of cables. The cable repair procedure has been reviewed and
_ _ _ _ _ _ _ _ _ _ _ _ _
.
found acceptable. The licensee has no procedures for repairing other vulnerable components of the RHR system. The RHR System is vulnerable to fire damage. Therefore, the plant may not be able to achieve and maintain cold shutdown within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> as stipulated in Section C.S.b.(1).
The Braidwood Safety Evaluation Report (SER) Supplement No. 2, dated October 1986 stated "By letter dated September 22, 1986, the applicant committed to upgrade the wall between the redundant RHR pumps to one having a 1-1/2 hour fire rating. Before exceeding 5% of rated power, the applicant will notify the staff if the upgrade of the wall is not complete. On the basis of limited combustible content, the staff concludes that the 1-1/2 hour rated wall is acceptable protection for the redundant RHR pumps."
This is considered an Open Item (456/86045-04; 457/86033-04) pending verification of the 1-1/2 hour rated fire wall between the redundant RHR pumps by Region III inspector . Sprinkler System Adequacy The sprinkler protection provided in the auxiliary building open hatchway between elevations 401 feet and 426 feet did not provide adequate protection for the unprotected opening. The licensee was requested to design a system that would provide an adequate level of protection by the use of draft stops around the opening and sprinklers below the hatchway perimeter at floor level 426 elevation. In addition, the inspectors observed in the auxiliary building on elevation 346 feet that no sprinkler system was installed to protect the stairway and hatchway in Zone 11.2-0. The licensee was requested to provide adequate sprinkler protection by the use of sprinklers below the floor and the use of the draft stops. This is considered an Open Item (456/86045-05; 457/86033-05)
and should be completed prior to exceeding 5% of rated power and will remain open pending verification of adequate installations by Region III.
.
10 Obstructions of Sprinkler Systems The inspectors observed that sprinkler heads were obstructed in areas including but not limited to elevation 364 feet and 426 feet of the turbine building. The staff requires that sprinkler heads be repositioned and/or added to provide adequate protection from an exposure fir This is considered an Open Item (456/86045-06; 457/86033-06) and will remain open pending verification of licensee's corrective action Any modifications in safety related areas should be completed prior to exceeding 5% of rated power. Turbine building sprinkler obstructions will be evaluated, and sprinklers will be relocated, as required, before the end of the first refueling outag . Manual Hose Station Coverage
.
The inspector identified lack of manual hose stations (standpipes) in the cable tunnel areas including the valve galleries. The licensee was requested to demonstrate the ability to provide adequate hose coverage for cable tunnel areas and the valve gallerie The Braidwood Safety Evaluation Supplement No. 2 dated October 1986 stated "By letter dated September 22, 1986, the applicant committed to provide additional hose l
_
,
at a hose station to provide coverage to one of the valve rooms within the tunnel, before exceeding 5% of rated power. The other valve room within the tunnel can be served by a hose from an outside hose hous The applicant has verified that adequate pressure and flow are available to accommodate the additional hose. The applicant has committed to revise its pre-fire plans to account for this additional hose before exceeding 5% of rated power." This is considered an Open Item (456/86045-07; 457/86033-07) pending review of licensee's corrective action . Detection The inspectors identified that the licensee has not installed smoke detectors in the control room main console. The licensee was requested to install detectors to insure that a fire inside the main console would be identified in it's initial stage This item is currently being reviewed by NRR and is an Open Item in the Braidwood Safety Evaluation Report, Supplement No. 2, dated October 198 . Steel Plate Hatchway Gaps The inspector observed in the auxiliary building, elevation 426 feet that gaps and holes existed in steel diamond plate at the hatchway which under fire conditions could allow heat and products of combustion to rise into the vertical adjoining areas. The Braidwood Safety Evaluation Report Supplement No. 2, dated October 1986, stated "By letter dated September 22, 1986, the applicant committed to seal gaps and openings in the steel hatch covers with fire resistant caulk before exceeding 5% of rated power."
This is considered an Open Item (456/86045-08; 457/86033-08) pending inspection of the installed fire resistant caulk by Region III inspector . Unsealed Spare Conduit Sleaves The inspectors observed unsealed conduit sleaves in rated barrier Openings through fire barriers for pipe should be sealed to prevent the passage of smoke and hot gases. The licensee was requested to insure the integrity of the fire barrier by sealing the inside of the spare sleave or provide test results from a recognized testing laboratory to justify that seals are not necessar The Braidwood Safety Evaluation Report Supplement No. 2, stated "By letter dated September 22, 1986, the applicant committed to seal spare conduits with fire resistant material to form a 3-hour fire-rated barrier." In addition it is also stated in the Safety Evaluation Report, Supplement No. 2, that "Any seals not completed before fuel load will be monitored with hourly fire watches."
This is considered an Open Item (456/86045-09; 457/86033-09) pending completion of sealing spare conduits in fire rated barriers with fire resistant materia _ _ _ _ _ __
__ . . - ._ __
.
,
15. Rea c t o r 011_C_o l 1 e c_t c i op_ _Sy_s_t_em The licensee has provided an oil collection system for the reactor coolant pumps, however, it was identified by the inspector that a portion of the high pressure screwed connection on the discharge side of the oil lift pump did not appear to be adequately protected by shields to contain an oil release. As discussed in a telephone conversation between the licensee and Region III on October 22, 1986, the licensee was requested to provide a detailed engineering analysis regarding the high pressure screwed connection on the discharge side of the oil lift pump that was in question by the inspector. This is considered an Unresolved Item (456/86045-10; 457/86033-10) pending review of licensee's analysi !
16. Emergency _Ligh_tj n3 f_or Safe Shu_t_down_ _Equipmen_t '
The installation and testing of the emergency lighting required for safe
. shutdown was not completed at the time of the inspection. On October 10, 1986 in a telephone conversation between the NRR, licensee and Region III, the licensee comitted to complete the installation and testing of the emergency lights prior to Initial Criticality. This Open Item (456/86045-01;457/86033-01) was previously mentioned in Secticn 3 of this report and will remain open pending installation and testing of emergency light . ,Un_ der 3round Firemain l The underground firemain is supplied by one electric driven and one diesel drisen fire pump which under churn (test) condition develops a pressure of 230 psig. During normal operation of the fire pumps, the pressure relief valve for the fire pump is set at 170 psi The licensee conducted a hydrostatic test of the underground firemain at 235 psig which is not in accordance with NFPA-24 which indicates that
_
"All new private fire service mains shall be tested hydrostatically at
! not less than 200 psi pressure for two hours, or at 50 psi in excess of the maximum static pressure when the maximum static pressure is in excess of 150 psi," (the licensee should have conducted the hydrostatic test at 280 psig).
'
In a document entitled " Hydrostatic Test Pressure for the Underground Fire Protection Piping at Braidwood" dated October 1, 1986 (no author identified) it indicated that during future churn test the underground fire main will be sectionalized from the fire pumps by the use of two isolation valves in series. Pressure may be monitored downstream of the first isolation valv In a telephone conversation between the licensee and Region III on October 22, 1986, the licensee comitted to rehydrotesting the portion of the underground fire main that will not be sectionalized from the fire pump. This is considered an Unresolved Item (456/86045-11; 456/86045-11) pending review of the underground rebydrostatic test results and procedures that will be utilized for the churn test.
t
_ . __ .,
'
.
1 Post Indicator Valves The inspector identified that the indicating sign for the post indicator valve was not secured in the proper position. The licensee indicated that Preoperational Tests were not completed. This is considered an Open Item (456/86045-12; 457/86033-12) which should be completed by initial criticality and will remain open pending review of Preoperational Test and inspection of Post Indicator Valves by Region II . Fire Dampers '
The inspector discussed with the licensee action taken to address the 10 CFR Part 21, report submitted by Ruskin Manufacturing Company regarding the potential problem with fire dampers failing to close under normal duct pressur The licensee should provide a valid engineering analysis which should include but not be limited to parameters such as size of damper, air flow, identification number / location and if installed in fire walls utilized for Appendix R considerations. It is recommended that it may be beneficial to review all fire dampers (regardless of manufacturer).
An option to providing the engineering analysis for the dampers would be to shut off inlet and exhaust air upon initiating the fire brigade. Should the licensee elect not to provide an engineering analysis then the licensee should provide the plant operating procedures and/or pre-fire plans for review. This is considered an Open Item (456/86045-13; 457/86033-13)
and should be completed prior to 5% powe . Open Items Open items are matters that have been discussed with the licensee, which will be reviewed further by the inspector, and which involve some action on the part of the NRC or licensee or both. Open items disclosed during the inspection are discussed in Sections 3, 5, 7, 8, 9, 10, 11, 13, 14, 18 and 1 . Unresolved Items Unresolved items are matters about which more information is required in order to ascertain whether they are acceptable items, items of noncompliance, or deviations. Unresolved items disclosed during the inspection is discussed in Paragraphs 15 and 1 . Exit Meeting The inspectors met with licensee representatives denoted in Paragraph 1 at the conclusion of the inspection on October 22, 1986, and summarized the scope and findings of the inspection. The licensee acknowledged the statements made by the inspector. The inspector also discussed the likely information content of the inspection report with regard to documents reviewed by the inspector during the inspection. The licensee did not identify any such documents as proprietar