IR 05000456/1986048

From kanterella
Jump to navigation Jump to search
Partially Withheld Preoperational Physical Protection Insp Rept 50-456/86-48 on 860902-05,15-19 & 22 (Ref 10CFR73.21). Major Areas Inspected:Implementation of Physical Security Program Required Prior to Fuel Load Licensing
ML20215N740
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 10/28/1986
From: Belanger J, Christoffer G, Creed J, Kniceley J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20215N733 List:
References
50-456-86-48, NUDOCS 8611070217
Download: ML20215N740 (2)


Text

_ ..

.. .#

%~  !

U. S. NUCLEAR REGULATORY COMMISSION REGIDN III Report No. 50-456/86048(DRSS)

Docket No. 50-456 License No. CPPR-132 Licensee: Commonwealth Edison Company Post Office Box 767 Chicago, IL 60690 Facility Name- Braidwood Nuclear Power Station,. Unit 1 Inspection At: Braidwood, IL and Chicago, IL (Corporate Office)

Inspection Conducted: September 2-5, 1986 (Site)

September 15-19,1986(Site)

September 22, 1986 (Corporate)

Date of Last Preoperational-Inspection: August 25, 1986 Inspectors: . ng ic >5 h Physical Security Inspector Date QS N J. R. Kniceley Mik Physical Secu,rity Inspector Date l[

G. M. Christoffer LLh f "

Physical Security Inspector

/dM' MM'

Date

~

Approved By: reed, Chief /C h h feguards Section Date'

Inspection Summary Inspection on September 2-5, 15-19, and 22, 1986 (Report No. 50-456/86048(DRSS))

Areas Inspected: Included a review of the status of implementation of the licensee's physical security program required prior to fuel load licensin The inspection specifically addressed the following areas of the security program: Management Effectiveness; Security Program Audit; Records and Reports; Testing and Maintenance; Locks, Keys, and Combinations; Physical Barriers - Protected Area; Physical Barriers - Vital Areas; Security System Power Supply; Lighting; Compensatory Measures; Assessment Aids; Access Control - Personnel; Access Control - Packages; Access Control - Vehicles; Detection Aids - Protected Area; Detection Aids - Vital Areas; Alarm Stations; Communications; Personnel Training and Qualifications - General Requirements; and Safeguards Contingency Plan Implementation Revie PDR ADOCK 05000456 Enclosure contains a PDR .'DS INTCRIOTION

^

- - - -- i Lg:,a scpcration this Ohl LG UNlu,'d i;sf()[+,jr M Mn t

p:.ga is Dccontrolled

_

. _

. -

.

.

h\

Results: Seven of the 20 functional areas listed above were found to be adequately implemented; the remaining 13 areas required additional inspection effort. Significant concerns were noted in the following areas: security computer system / security alarm response; lighting /CCTV surveillance capabilities during night hours, vital area barriers, and the emergency power supply for the security syste Details: (UNCLASSIFIED )

EneTosure contaTns SAFEGUARDS INFCRitATICN

E!"irsnaie

-

c

" %- -