Notice of Violation from Insp on 971104-1215.Violation Noted:On 971102,inspectors Identified That Licensee Had Failed to Fasten Covers on Incore Neutron Detector Drive Mechanism
ML20202F181
Person / Time
Site: Braidwood, 07100104  Constellation icon.png
Issue date: 01/02/1998
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20202F168 List:
References
50-456-97-19, 50-457-97-19, NUDOCS 9802190146
Download: ML20202F181 (2)


Text

'

)

r . l

.

?

NOTICE OF V;oLAT;ON Commonwealth Edison Company Docket Nos. 50 456; SH57 -

Braidwood Station Lloonse Nos. NPF-72; NPF-77 Branoville, Illinois As a result of an inspection conducted from November 4 through December 15, igg 7, a violauon of NRC requirements was identified, in accordance with the " General Statement of Policy and Procedure for NRC Enforcement AcGons,' NUREG 1600, the violation is listed below:

Tecnnical Specification 6.8.1.s states, in part, that written procedures shall be established, implemented, and maintained covering the applicable procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978, which laciudes procedures for the startup, opwation, and shutdown of safety related system Paragraph 3.f of Appendix A to Regulatory Guide 1.33, Revision 2, lists containment as a

,

safety-related system.

! Braidwood Procedure 2BwoS 5.2.o 1, " Containment 1 oose Debris inspection," l

'

Revision 6, Step F.2.c, requires that prior tc closing the containtnent, loose tools,

! equipment and mirror insulation that are net needed for approved work in progress be ,

- removed from containment.
Contrary to the above, ois Novemw 2, igg 7, the inspectors identified that the licensee i had failed to fasten covers on the incore neutron detector drive mechanism, and the

'

licensee had failed to remove from containment unattended tools near the reactor head

,

that were not needed for approved work in progress.

.

l This is a severity Level IV violat;on (Supplemord I) (50 457/g701g 01(DRP)).

Pusuant to the provisions of 10 CFR 2.201, Commonwealth Edison is hereby required to submit -

l a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN:

i

'

Document Control Desk, Washington D.C. 20555 with a copy to the Regional Administrator, U.S. Nuclear Regulatory Commission, Region ill, 801 Warrenville Road, Usle, Illinois 60532, and i a copy to the NRC Resident inspector at the Braidwood Station within 30 days of the date of the

!

letter transmitting this Notice of Violation (Notice). This rorly should be clearty marked as a i " Rep y to a Notice of Violation" and should include for each violation: (1) the reason for the

'

violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further

'

,

vioMtions, and (4) the date when full compliance will be achieved.

,

-

Your response may reference or include previous docketed correspondence, if the correspondence adequately addresses the required response, if an adequate reply is not received within the time specified in this Notice, an order or a demand for information may be

.- Issued as to why the license should not be modified, suspendod, or revoked, or why such other

action as may be proper should not be taken. 'Nhere good cause is shown, consideration will be j given to extending the response time, i

i

'

~

,

9002190146 900102 PDR ADOCK 05000456 G PDR l _ ___ _ . _ _ _ _ _ _ _ _ -- _ _ _ _

U'

~

.

.

Notice of Violation - 2-Because your response will be placed in the NRC Public Document Room (PDR), to the extent possible, N shcu'd not include any personal privacy, proprietary, or safeguards information so that it can be placed in the PDR without redaction. However, if you find it necessary to include such information, you should clearty indicate the specific information that you desire not to be placed in the PDR, and provide the legal basis to support your request for withholding the information from the publi Dated at Lisle, Illinois this 2nd day of January,1998 .

,