Partially Withheld Insp Rept 50-456/86-29 on 860605-17 (Ref 10CFR73.21).No Violations or Deviation Noted.Major Areas Inspected:Physical Security Program.Potential Concern Identified Re Security Door Status
ML20202E149
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 07/03/1986
From: Belanger J, Kniceley J, Pirtle G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20202E136 List:
References
50-456-86-29, NUDOCS 8607140296
Download: ML20202E149 (2)


Text

. .

U.S. NUCLEAR REGULATORY COMMISSION

REGION III

Report No. 50-456/86029(DRSS)

Docket No. 50-456 License No. CPPR-132 Licensee: Commonwealth Edison Company Post Office Box 767 Chicago, IL 60690 Facility Name: Braidwood Nuclear Power Station, Unit 1 Inspection At: Braidwood, IL; and NRC Region III Office Inspection Conducted: June 5-6, 1986 (in-office)

June 9-13,17,1986 ( site)

Inspectors: 3. Y h p . L. Belanger O 1/3/8(o Date T Physical Security Inspector /3/F (.

p.R.Kniceley Date Physical Security Inspector Approved By: I3/?lo G. L. Pirtle, Acting Chief Date Safeguards Section Inspection Summary Inspection on June 5-6, 9-13, and 17, 1986 (Report No. 50-456/86029(DRSS))

Areas Inspected: Included a review of the status of implementation of the licensee's physical security program required prior to fuel load licensin The inspection focused on the following specific areas of the licensee's security program: Security Plan and Implementing Procedures; Management Effectiveness (Security System Status); Security Organization; Security System Power Supply; Personnel Training and Qualification; and Protection of Safeguards Information. The inspection also reviewed the licensee's actions relating to IE Bulletin 77-08; IE Circular 77-04; IE Circular 78-17; IE Circular 79-03; and verified that the licensee had received IE Information Notice 86-2 Results: One potential concern was developed regarding security door status  !

relative to the licensee's current schedule for full security implementation, on August 1, 1986. The inspector received assurances from site management EncIosure Contains AFEGUARDS INFORMATION 8607140296 PDR 860703ADOCK PDR 05000456 " Separation This O Pa98 la 08 Cont M W

_ - _ _ _ _ - .

.. . - - . . . . ..

- . . _ -- .-

.

. -

.

representatives that the required resources would be made available to meet {

the August 1, 1986 date. The following areas were inspected and determined  ;

to be closed items: Security Plan and Implementing Procedures; Security Organization; and the Protection of Safeguards Information. Licensee actions relating to the IE Bulletin and Circulars were adequate. Additional inspection is required regarding Security System Power Supply and Personnel Training i and Qualificatio Details: Unclassified Safeguards Information.