U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No. 50-456/86042(DRSS)
Docket No. 50-456 License No. CPPR-132 Licensee: Commonwealth Edison Co.
Post Office Box 767 Chicago, IL 60690 Facil.ity Name:
Braidwood Nuclear Power Station, Unit 1 Inspection At: Braidwood, Illinois Plant Site, and NRC Region III Office Inspection Conducted: August 25, 1986 Date of Last Inspection: June 5-6, 9-13 and 17, 1986 g.L. fMany r
Inspectors:
J. L. Belanger
Physical Security Date Inspector
J. R. Kniceley dib Physical Spcurity Date Inspe or
' N Reviewed By:
Creed, Chief Safeguards Section Date LL l 'bb i
LIA$1 son, Chief
- N Approved 9y: W Nuclear Materials Safety and Date Safeguards Branch Inspection Summary Inspec_ tion on August 25,1986 (Report No. 50-456/86042(DRSS))
Areas Inspected:
Included a review of the audit findings which were generated during the licensee's " Safeguards System Assistance Visit" conducted by the CECO Nuclear Security Administrators and their assistants during the week of August 18-22, 1986.
Results: Region 311's review of the audit report and interviews with security management personnel showed that the licensee had identified significant concerns in the area of security system reliability and guard force performance.
The inspection also showed that the licensee had initiated corrective action to resolve these concerns.
Enclosure contains SAFEGUARDS INFORMATIO!!
0609170423 860912(6 Upon sep3 ration this PDR ADOCK 050004 page is Decontrolicd G
.
-
-
-
- -
-
.