U. S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No. 50-456/86004(DRSS)
Docket No. 50-456
,
Licensee:
Commonwealth Edison Company License No. CPPR-132 Post Office Box 767 Chicago, IL 60690 Facility Name:
Braidwood Nuclear Power Station Inspection At:
Braidwood, IL Inspection Conducted:
January 27-28, 1986 Date of Last Preoperational Inspection:
December 3-4, 1985 Type of Inspection:
Announced, Preoperational Physical Protection Inspector:
9 k. [bg(Mwpg D-/dC/F/-
J.' L. Belanger *
Date Physical Security Inspector 1/~/s
'
~
Approved By
J. R. Creed, Chief Date Safeguards Section Inspection Summary Inspection on January 27-28, 1986 (Report No. 50-456/86004(DRSS))
Areas Inspected:
Included a review of the status of implementation of the licensee's physical security program required prior to fuel load licensing.
The inspection involved 13 inspector-hours by one NRC inspector.
Results: The licensee appears to be adhering to a schedule which should assure full security program implementation sixty days prior to the projected fuel load date of September 30, 1986.
No problem areas or items of concern were identified at this time which would indicate that this objective could not be met.
(Details:
UNCLASSIFIED SAFEGUARDS MATERIAL)
Enclosure contains StiFEGUARDS INFORMATION Upon separation this pa p is Decontrolled 9602270176e6g0 PDR ADOCM g