|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARLIC-99-0098, Forwards Revs to Fort Calhoun Station EPIPs & Emergency Planning Forms Manual.Document Update Instructions & Summary of Changes Are Included on Confirmation of Transmittal Form Attached1999-10-15015 October 1999 Forwards Revs to Fort Calhoun Station EPIPs & Emergency Planning Forms Manual.Document Update Instructions & Summary of Changes Are Included on Confirmation of Transmittal Form Attached ML20217G9261999-10-15015 October 1999 Forwards Insp Rept 50-285/99-10 on 990913-17.One NCV Noted ML20217G2331999-10-14014 October 1999 Forwards Insp Rept 50-285/99-09 on 990913-17.No Violations Noted LIC-99-0091, Submits Suppl Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, in Response to NRC RAI During 990817 Meeting with Util1999-10-0808 October 1999 Submits Suppl Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, in Response to NRC RAI During 990817 Meeting with Util LIC-99-0097, Forwards Final RO & SRO License Applications,As Requested in ,Certifying That Training Completed for Six RO Candidates,Three Instant SRO Candidates & One Upgrade SRO Candidate.Without Encls1999-10-0707 October 1999 Forwards Final RO & SRO License Applications,As Requested in ,Certifying That Training Completed for Six RO Candidates,Three Instant SRO Candidates & One Upgrade SRO Candidate.Without Encls ML20217B5111999-10-0606 October 1999 Forwards Amend 193 to License DPR-40 & Safety Evaluation. Amend Revises TS Sections 2.10.4,3.1 & Table 3-3 to Increase Min Required RCS Flow Rate & Change Surveillance require- Ments for RCS Flow Rate ML20216H7231999-09-29029 September 1999 Informs That Util 980325 Response to GL 97-06, Degradation of SG Internals, Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Fort Calhoun Station,Unit 1 ML20212L9571999-09-27027 September 1999 Informs That Follow Up Insp for Drill/Exercise Performance Indicator Will Be Conducted During Wk of 991001 LIC-99-0089, Forwards Preliminary License Exam Applications for Six Ros, Three Instant SROs & One Upgrade SRO Candidate,Per Preparation for Ro/Sro Licensing Exams to Be Administered on 991025-29 at Fcs.Without Encl1999-09-24024 September 1999 Forwards Preliminary License Exam Applications for Six Ros, Three Instant SROs & One Upgrade SRO Candidate,Per Preparation for Ro/Sro Licensing Exams to Be Administered on 991025-29 at Fcs.Without Encl LIC-99-0092, Forwards Revised Epips,Including non-proprietary Rev 8 to EPIP-RR-66,rev 3 to EPIP-EOF-24,rev 14 to RERP-Section F,Rev 11 to RERP-Section I,Rev 12 to RERP-Appendix C & RERP & EPIP Indexes.Proprietary Rev 3 to EPIP-EOF-24,pages 1-3,encl1999-09-21021 September 1999 Forwards Revised Epips,Including non-proprietary Rev 8 to EPIP-RR-66,rev 3 to EPIP-EOF-24,rev 14 to RERP-Section F,Rev 11 to RERP-Section I,Rev 12 to RERP-Appendix C & RERP & EPIP Indexes.Proprietary Rev 3 to EPIP-EOF-24,pages 1-3,encl LIC-99-0087, Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams1999-09-17017 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams LIC-99-0088, Forwards Documentation Associated with SRO License Renewal Application for Cd Darrow.Applicant Has Satisfactorily Completed Applicable FCS Requalification Program.Without Encls1999-09-16016 September 1999 Forwards Documentation Associated with SRO License Renewal Application for Cd Darrow.Applicant Has Satisfactorily Completed Applicable FCS Requalification Program.Without Encls LIC-99-0080, Requests Approval of Attached Rev to QAP Contained in App a of Usar,Revising Commitment Re Qualifications of Personnel Performing Quality Control Insps of Activities Affecting Fire Protection1999-09-16016 September 1999 Requests Approval of Attached Rev to QAP Contained in App a of Usar,Revising Commitment Re Qualifications of Personnel Performing Quality Control Insps of Activities Affecting Fire Protection LIC-99-0085, Forwards Revs 18 & 19 to TDB-VI, COLR for FCS Unit 1,IAW TS 5.9.5.Rev 18 Resulted from Reevaluation of Cycle 18 Setpoints & Rev 19 Resulted from Changes in Cycle 19 Refueling Boron Concentrations & Addition of TS Parameters1999-09-0808 September 1999 Forwards Revs 18 & 19 to TDB-VI, COLR for FCS Unit 1,IAW TS 5.9.5.Rev 18 Resulted from Reevaluation of Cycle 18 Setpoints & Rev 19 Resulted from Changes in Cycle 19 Refueling Boron Concentrations & Addition of TS Parameters IR 05000285/19990081999-09-0707 September 1999 Forwards Insp Rept 50-285/99-08 on 990907-0811.No Violations Noted.Insp Consisted of Exam of Activities Conducted Under License as Relate to Safety & to Compliance with Commission Rules & Regulations & with Conditions of License ML20211P2581999-09-0303 September 1999 Forwards Insp Rept 50-285/99-06 on 990809-12.No Violations Noted.Insp Consisted of Exam of Activities Under License as Related to EP & to Compliance with Commission Rules & Regulations & with Conditions of License LIC-99-0083, Requests Participation in internet-based Y2K Early Warning Sys (Yews),As Noted in NRC Info Notice 99-25.Plant Point of Contact Will Be JW Chase1999-09-0202 September 1999 Requests Participation in internet-based Y2K Early Warning Sys (Yews),As Noted in NRC Info Notice 99-25.Plant Point of Contact Will Be JW Chase ML20211J9231999-09-0202 September 1999 Forwards SE Accepting Licensee 990301 Requests for Relief Re Third 10-year ISI Interval for Plant,Unit 1.Relief Proposed Alternatives to Requirements in ASME B&PV Section XI,1989 Edition,Paragraphs IWA-5242(a) & IWA-5250(a)(2) ML20211L3241999-09-0202 September 1999 Informs That Due to Administrative Error,Page 2-50 of TSs Contained Error on 2.10.2(2) of Amend 192 to License DPR-40 Issued on 990727.Corrected Page Encl LIC-99-0077, Forwards non-proprietary & Proprietary Revised EP Forms, Including FC-EPF Index,Pp 1 Dtd 990805,pp 2 Dtd 990812,rev 11 to FC-EPF-9,rev 12 to FC-EPF-10,rev 9 to FC-EPF-11,rev 2 to FC-EPF-12 & Rev 3 to FC-EPF-38.Proprietary EP Withheld1999-08-27027 August 1999 Forwards non-proprietary & Proprietary Revised EP Forms, Including FC-EPF Index,Pp 1 Dtd 990805,pp 2 Dtd 990812,rev 11 to FC-EPF-9,rev 12 to FC-EPF-10,rev 9 to FC-EPF-11,rev 2 to FC-EPF-12 & Rev 3 to FC-EPF-38.Proprietary EP Withheld ML20211F4491999-08-25025 August 1999 Forwards Ltr from Ja Miller,Dtd 990819,which Notified State of Iowa of Deficiency Identified During 990810,Fort Calhoun Station Biennial Exercise.One Deficiency Identified for Not Adequately Demonstrating Organizational Capability LIC-99-0076, Forwards fitness-for-duty Program Performance Data for Six Month Period from Jan-June 1999,IAW 10CFR26.71(d)1999-08-20020 August 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period from Jan-June 1999,IAW 10CFR26.71(d) LIC-99-0078, Forwards Rev 16C to FCS Site Security Plan,Per Provisions of 10CFR50.54(p).Rev Has Been Determined Not to Degrade Effectiveness of Current Security Plans.List of Changes, Provided.Encl Withheld1999-08-20020 August 1999 Forwards Rev 16C to FCS Site Security Plan,Per Provisions of 10CFR50.54(p).Rev Has Been Determined Not to Degrade Effectiveness of Current Security Plans.List of Changes, Provided.Encl Withheld ML20210R1491999-08-13013 August 1999 Forwards Insp Rept 50-285/99-07 on 990719-23.No Violations Noted.Nrc Identified One Issue Which Was Evaluated Under Risk Significance Determination Process & Was Determined to Be of Low Risk Significance LIC-99-0075, Forwards Monthly Operating Rept for July 1999 for Fcs,Unit 1,per Plant TS 5.9.1.Revised Rept for June 1999,encl Due to Inadvertent Reporting of Gross Electrical Energy Data When Net Electrical Energy Data Was Required1999-08-13013 August 1999 Forwards Monthly Operating Rept for July 1999 for Fcs,Unit 1,per Plant TS 5.9.1.Revised Rept for June 1999,encl Due to Inadvertent Reporting of Gross Electrical Energy Data When Net Electrical Energy Data Was Required ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210N1991999-08-0909 August 1999 Informs That as Result of NRC Review of Licensee Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20210P8991999-08-0909 August 1999 Forwards FEMA Final Rept for 990630 Offsite Medical Drill. No Deficiencies or Areas Requiring Corrective Action Identified During Drill LIC-99-0072, Requests That Licensee 990526 Application for Amend & Related Documents,Be Withdrawn.Util Requests That NRC Review Attached Responses to Ensure That Upcoming Submittal Will Be Acceptable1999-08-0606 August 1999 Requests That Licensee 990526 Application for Amend & Related Documents,Be Withdrawn.Util Requests That NRC Review Attached Responses to Ensure That Upcoming Submittal Will Be Acceptable ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams LIC-99-0068, Documents OPPD Response to Requested Actions in GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-08-0202 August 1999 Documents OPPD Response to Requested Actions in GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal LIC-99-0040, Forwards Rept of Changes,Tests & Experiments Performed Per 10CFR50.59 & Revs to USAR Other than Those Resulting from 10CFR50.59.Encl Info Covers Period of 981101-9903311999-07-28028 July 1999 Forwards Rept of Changes,Tests & Experiments Performed Per 10CFR50.59 & Revs to USAR Other than Those Resulting from 10CFR50.59.Encl Info Covers Period of 981101-990331 LIC-99-0070, Requests Reinstatement of SRO License Previously Held by K Grant-Leanna (License SOP-43569).Operator Is Current on All requalification-training Topics & Has Completed License Reactivation Program1999-07-28028 July 1999 Requests Reinstatement of SRO License Previously Held by K Grant-Leanna (License SOP-43569).Operator Is Current on All requalification-training Topics & Has Completed License Reactivation Program ML20210G1851999-07-27027 July 1999 Forwards Amend 192 to License DPR-40 & Safety Evaluation. Amend Consists of Changes to TS in Response to 990129 Application LIC-99-0057, Forwards 1999/2000 Statement of Cash Flow from Operations, as Guarantee of Payment of Deferred Premiums for Period of 990630 to 0006301999-07-26026 July 1999 Forwards 1999/2000 Statement of Cash Flow from Operations, as Guarantee of Payment of Deferred Premiums for Period of 990630 to 000630 ML20216D6951999-07-26026 July 1999 Informs That During 990614 Review of Fort Calhoun,Nrc Noted That Drill/Exercise Performance Indicator Has Entered White Band,Which Indicated Level of Licensee Performance That Warranted Increased Regulatory Response LIC-99-0071, Informs That Util Expects to Submit Four Licensing Actions in Each of Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-26026 July 1999 Informs That Util Expects to Submit Four Licensing Actions in Each of Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates LIC-99-0069, Forwards non-proprietary & Proprietary Epips,Including FC- Epf Index Page & Page 2 ,rev 0 to FC- EPF-42,EPIP Index (Page 1 of 2) & EPIP-OSC-2, Cover & Pages 19 & 20.Proprietary Encls Withheld1999-07-23023 July 1999 Forwards non-proprietary & Proprietary Epips,Including FC- Epf Index Page & Page 2 ,rev 0 to FC- EPF-42,EPIP Index (Page 1 of 2) & EPIP-OSC-2, Cover & Pages 19 & 20.Proprietary Encls Withheld ML20210D9471999-07-22022 July 1999 Forwards Amend 191 to DPR-40 & Safety Evaluation.Amend Authorizes Rev to Licensing Basis as Described in Updated Safety Analysis Rept to Incorporate Mod for Overriding Containment Isolation ML20210C2041999-07-20020 July 1999 Discusses 990715 Mgt Meeting with Midamerican Energy Co Re risk-informed Baseline Insp Program Recently Implemented at Cooper & Fort Calhoun Stations ML20210C0201999-07-20020 July 1999 Informs That Due to Administrative Oversight,Revised TS Bases Provided in to Fort Calhoun Station Were Not Dated.Dated Pages to TS Encl ML20210B0761999-07-19019 July 1999 Forwards Insp Rept 50-285/99-05 on 990601-0710.No Violations Noted ML20209G5351999-07-15015 July 1999 Informs That Staff Incorporated Rev of TS Bases Provided by Licensee Ltr Dtd 980904,into Fort Calhoun Station Tss. Staff Finds Revs to Associated TS Bases to Be Acceptable. Revised Bases Pages Encl ML20209F5741999-07-12012 July 1999 Ack Receipt of Transmitting Exercise Scenario for Upcoming Biennial Offsite Exercise Scheduled 990810.Scenario Reviewed & Acceptable ML20209G5591999-07-0808 July 1999 Forwards Detailed Listing of Staff Concerns with C-E TR NPSD-683,rev 3 & RCS pressure-temperature Limits Rept LIC-99-0066, Forwards Fort Calhoun Performance Indicators Rept for May 19991999-07-0707 July 1999 Forwards Fort Calhoun Performance Indicators Rept for May 1999 LIC-99-0060, Forwards Proprietary & non-proprietary Revs to Fort Calhoun Station Emergency Plan Forms (Epf),Including FC-EPF,FC-EPF-1 & FC-EPF-17.Proprietary Info Withheld1999-07-0101 July 1999 Forwards Proprietary & non-proprietary Revs to Fort Calhoun Station Emergency Plan Forms (Epf),Including FC-EPF,FC-EPF-1 & FC-EPF-17.Proprietary Info Withheld ML20209D8771999-07-0101 July 1999 Summarizes 990630 Public Meeting Conducted in Fort Calhoun, Ne Re Results of Completed Culture Survey,Plant Status, Facility Activities Re New NRC Oversight Process & License Renewal.Licensee Handout & Attendance List Encl LIC-99-0063, Requests Termination of License Held by MR Anderson (License SOP 43812) for Fort Calhoun Station.Anderson Ended Employment Effective 9906241999-07-0101 July 1999 Requests Termination of License Held by MR Anderson (License SOP 43812) for Fort Calhoun Station.Anderson Ended Employment Effective 990624 1999-09-08
[Table view] Category:NRC TO UTILITY
MONTHYEARML20062G6561990-11-19019 November 1990 Forwards Amend 134 to License DPR-40 & Safety Evaluation. Amend Addresses Two Administrative Changes ML20216K0541990-11-14014 November 1990 Forwards Safety Evaluation Denying Request for Exemption from Requirements of 10CFR50,App R for Fire Area 34B for Wide Range Nuclear Power Instrumentation Channels.Required Level of Protection Not Provided ML20062E4641990-11-0909 November 1990 Forwards Insp Rept 50-285/90-42 on 901015-19.No Violations or Deviations Noted ML20058H0551990-11-0101 November 1990 Forwards List of Unimplemented Gsis,Per Generic Ltr 90-04 ML20058C6821990-10-24024 October 1990 Offers No Comment on Annual Exercise Scenario Submitted Via ML20058A3901990-10-19019 October 1990 Advises That Maint Team Reinspection Scheduled for Wks of 901203 & 10.Meetings Will Be Scheduled on 901113-14 in Preparation for Insp.List of Required Matls Encl ML20062B6041990-10-12012 October 1990 Forwards Amend 133 to License DPR-40 & Safety Evaluation. Amend Modifies Tech Spec to Increase Refueling Boron Concentration & Revise Storage Requirements of Spent Fuel Pool Region 2 ML20059M6751990-09-28028 September 1990 Forwards Insp Rept 50-285/90-35 on 900729-0910.No Violations or Deviations Noted ML20059N3311990-09-28028 September 1990 Forwards Final SALP Rept 50-285/90-24 for Period of May 1989 - Aug 1990.Actions Discussed in 900726 SALP Mgt Meeting & Util 900827 Response to Initial SALP Rept Considered to Be Responsive to NRC Concerns & Recommendations ML20059K3691990-09-14014 September 1990 Ack Receipt & Review of Changes to Emergency Plan Re Emergency Facilities & Equipment Based on Review of .Proposed Changes Acceptable ML20059K7061990-09-14014 September 1990 Disagrees W/Position That More Detailed Design & Safety Assessment Using Ipe/Pra Appropriate Framework,Per Generic Ltr 89-19 ML20059J9871990-09-13013 September 1990 Provides Info Re Generic Fundamentals Exam Section of Operator Licensing Written Exam to Be Administered on 901010.W/o Map of Exam Area & Preliminary Instructions to Participant Encl ML20056B4071990-08-20020 August 1990 Forwards Insp Rept 50-285/90-34 on 900730-0803.No Violations or Deviations Noted.Unresolved Items Identified in Paragrphs 2.1 & 4.0 of Encl Insp Rept ML20059A2211990-08-17017 August 1990 Forwards Evaluation of Cen 387-P, Pressurizer Surge Line Thermal Stratification. Info Provided by C-E Owners Group in Ref 1 & 2 Inadequate to Justify Meeting All Appropriate Limits for 40-yr Plant Life ML20058M8071990-08-10010 August 1990 Discusses Closeout of NRC Bulletin 90-001, Loss of Fill-Oil Transmitters Mfg by Rosemount. Util Replaced Four Transmitters Which Fell within Scope of Bulletin During Refueling & Maint Outage ML20058N3711990-08-10010 August 1990 Advises That Programmed Enhancements for Generic Ltr 88-17, Loss of DHR, Acceptable ML20056A5761990-08-0707 August 1990 Forwards Request for Addl Info to Review Alternate Seismic Criteria & Methodologies for Facility ML20056A7551990-08-0606 August 1990 Advises of Concluded Investigation Case 4-87-016 Re Alleged False Welding Records,Violations of Employee Protection & Cheating on Welding Performance Tests.Allegations Unsubstantiated ML20056A1721990-07-30030 July 1990 Advises That Written Licensing Exams Scheduled on 901113 & Operating Licensing Exams Scheduled on 901114 & 15.Licensee Requested to Furnish Ref Matl Listed in Encl 1 by 900917 in Order to Avoid Exam Being Rescheduled ML20056A3461990-07-27027 July 1990 Summarizes 900724 Meeting W/Util in Region IV Ofc Re Changes to Operator Licensing Program ML20055J1461990-07-23023 July 1990 Forwards Insp Rept 50-285/90-30 on 900513-0616 & Notice of Violation.App C Withheld from Public Per 10CFR73.21 ML20055G1791990-07-18018 July 1990 Ack Receipt of Advising NRC of Corrective Actions in Response to Violations Noted in Insp Rept 50-285/90-13. Implementation of Actions Will Be Reviewed During Future Insp ML20055G3931990-07-16016 July 1990 Informs That Financial Info Submitted for 1990 in Util Satisfies 10CFR.140 Requirements ML20055F6841990-07-12012 July 1990 Forwards Initial SALP Rept 50-285/90-24 for May 1989 - Apr 1990 IR 05000285/19900021990-07-0909 July 1990 Ack Receipt of 900507 & 0629 Responses to Violations & Deviations Noted in Insp Rept 50-285/90-02 ML20055G0171990-07-0606 July 1990 Forwards Amend 132 to License DPR-40 & Safety Evaluation. Amend Changes Tech Spec Pages 5-1,5-5,5-8 & 5-9a to Incorporate Title Changes as Result of Reorganization & Partial Relocation of Emergency Planning Dept IR 05000285/19900291990-07-0505 July 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-285/90-29 ML20055C7901990-06-18018 June 1990 Forwards Insp Rept 50-285/90-26 on 900416-0512.Violations Noted.No Citations Issued for Violations Discussed in Paragraphs 5.a,5.b, & 5.c of Rept ML20055C8051990-06-15015 June 1990 Forwards Insp Rept 50-285/90-25 on 900402-06 & 16-19 & Notice of Violation.Violations Pertain to Inadequate Assessment Aids,Detection Aids,Compensatory Measure & Key Control ML20059M9681990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20055C4101990-02-23023 February 1990 Advises That 891010 & 1207 Changes to Emergency Plan Reviewed by Emergency Preparedness Staff & Acceptable ML20248C7421989-09-28028 September 1989 Forwards Insp Rept 50-285/89-32 on 890801-31.Noted Violations Not Being Cited to Encourage & Support Util self-identification & Correction of Problems.One Unresolved Item Discussed in Paragraph 7.a of Rept ML20248C4901989-09-22022 September 1989 Forwards Summary of 890828 Enforcement Conference in Arlington,Tx to Discuss Violations Noted in Insp Repts 50-285/89-10 & 50-285/89-31.Attendance List Also Encl ML20247Q6361989-09-21021 September 1989 Forwards Amend 8 to Indemnity Agreement B-67,reflecting Changes to 10CFR140, Financial Protection Requirements & Indemnity Agreements IR 05000285/19890011989-09-19019 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-285/89-01.NRC Will Withdraw Items 3 & 4 If Review of Safety Evaluation Documentation Found to Be Adequate ML20247L2491989-09-18018 September 1989 Advises That 890907 Meeting W/Util Re Status of Plant Safety Enhancement Program Provided for Better Understanding of Progress Util Made in Implementing Program.List of Attendees & Meeting Slides Encl ML20247L6161989-09-0606 September 1989 Advises That 890808 Priority Description & Interim Milestones for Rev of safety-related Procedures & Commitment to Final Completion Date of 901231 Acceptable.Nrc Should Be Notified If Interim Milestones Cannot Be Met ML20247B1611989-08-30030 August 1989 Forwards Summary of Region Iv/Senior Util Executives Meeting on 890818 in Arlington,Tx.Topics Discussed Included Improving Communications,Salp Process in Region IV & Enforcement.List of Attendees & Agenda Encl ML20247A3151989-08-30030 August 1989 Forwards Final SALP Rept 50-285/89-19 for May 1988 - Apr 1989,summary of 890713 Meeting to Discuss SALP Rept & Util 890817 Response to SALP Rept ML20247B4191989-08-29029 August 1989 Forwards Insp Rept 50-285/89-28 on 890701-31.No Violations or Deviations Noted.One Unresolved Item Identified ML20246F0161989-08-25025 August 1989 Forwards Insp Rept 50-285/89-30 on 890724-28.No Violations or Deviations Noted ML20246D5521989-08-23023 August 1989 Discusses Util Response to Generic Ltr 89-08, Erosion/ Corrosion-Induced Pipe Wall Thinning, & Advises That Licensee Maintain,In Auditable Form,Records of Program ML20246E0791989-08-18018 August 1989 Discussess Insp Repts 50-285/89-10 & 50-285/89-23 on 890227-0303 & 0508-10 & Forwards Notice of Violation. Decision Not Reached by NRC Re Failures to Adequately Protect Safeguards Info from Compromises,Per 10CFR73.21 ML20246A0531989-08-17017 August 1989 Forwards Supplemental Safety Evaluation for Rev 4 to Inservice Testing Program for Pumps & Valves,Per Generic Ltr 89-04 ML20245H8901989-08-15015 August 1989 Forwards Safety Evaluation Supporting Util 890215 Response to Generic Ltr 83-28,Item 2.1 (Part 1), Vendor Interface for Reactor Trip Sys Components ML20245J9061989-08-11011 August 1989 Forwards Summary of Enforcement Conference on 890728 in Region IV Ofc Re Violations Noted in Insp Rept 50-285/89-27 Involving Inadequate Testing of Turbine Driven Auxiliary Feedwater Pump ML20245K3431989-08-11011 August 1989 Forwards Safety Evaluation Determining That Isolation Devices Qualified & Acceptable for Interfacing Safety & Nonsafety Sys Re Implementation of ATWS Rule IR 05000285/19890221989-08-0707 August 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-285/89-22 ML20248C4631989-08-0101 August 1989 Discusses 890728 Meeting in Region IV Re Discussion & Status Update for safety-related Procedures Upgrade Program.List of Attendees & Matl Presented at Meeting Encl ML20247L7921989-07-27027 July 1989 Informs That 890616 Response to NRC 890110 Safety Evaluation Re HPSI Header cross-connect Valves on Hot Leg Injection at Plant Acceptable,Including Adequacy of Path for Boron Control,Per Telcon Providing Flow Rate as 420 Gpm 1990-09-28
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217G9261999-10-15015 October 1999 Forwards Insp Rept 50-285/99-10 on 990913-17.One NCV Noted ML20217G2331999-10-14014 October 1999 Forwards Insp Rept 50-285/99-09 on 990913-17.No Violations Noted ML20217B5111999-10-0606 October 1999 Forwards Amend 193 to License DPR-40 & Safety Evaluation. Amend Revises TS Sections 2.10.4,3.1 & Table 3-3 to Increase Min Required RCS Flow Rate & Change Surveillance require- Ments for RCS Flow Rate ML20216H7231999-09-29029 September 1999 Informs That Util 980325 Response to GL 97-06, Degradation of SG Internals, Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Fort Calhoun Station,Unit 1 ML20212L9571999-09-27027 September 1999 Informs That Follow Up Insp for Drill/Exercise Performance Indicator Will Be Conducted During Wk of 991001 IR 05000285/19990081999-09-0707 September 1999 Forwards Insp Rept 50-285/99-08 on 990907-0811.No Violations Noted.Insp Consisted of Exam of Activities Conducted Under License as Relate to Safety & to Compliance with Commission Rules & Regulations & with Conditions of License ML20211P2581999-09-0303 September 1999 Forwards Insp Rept 50-285/99-06 on 990809-12.No Violations Noted.Insp Consisted of Exam of Activities Under License as Related to EP & to Compliance with Commission Rules & Regulations & with Conditions of License ML20211L3241999-09-0202 September 1999 Informs That Due to Administrative Error,Page 2-50 of TSs Contained Error on 2.10.2(2) of Amend 192 to License DPR-40 Issued on 990727.Corrected Page Encl ML20211J9231999-09-0202 September 1999 Forwards SE Accepting Licensee 990301 Requests for Relief Re Third 10-year ISI Interval for Plant,Unit 1.Relief Proposed Alternatives to Requirements in ASME B&PV Section XI,1989 Edition,Paragraphs IWA-5242(a) & IWA-5250(a)(2) ML20211F4491999-08-25025 August 1999 Forwards Ltr from Ja Miller,Dtd 990819,which Notified State of Iowa of Deficiency Identified During 990810,Fort Calhoun Station Biennial Exercise.One Deficiency Identified for Not Adequately Demonstrating Organizational Capability ML20210R1491999-08-13013 August 1999 Forwards Insp Rept 50-285/99-07 on 990719-23.No Violations Noted.Nrc Identified One Issue Which Was Evaluated Under Risk Significance Determination Process & Was Determined to Be of Low Risk Significance ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210P8991999-08-0909 August 1999 Forwards FEMA Final Rept for 990630 Offsite Medical Drill. No Deficiencies or Areas Requiring Corrective Action Identified During Drill ML20210N1991999-08-0909 August 1999 Informs That as Result of NRC Review of Licensee Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210G1851999-07-27027 July 1999 Forwards Amend 192 to License DPR-40 & Safety Evaluation. Amend Consists of Changes to TS in Response to 990129 Application ML20216D6951999-07-26026 July 1999 Informs That During 990614 Review of Fort Calhoun,Nrc Noted That Drill/Exercise Performance Indicator Has Entered White Band,Which Indicated Level of Licensee Performance That Warranted Increased Regulatory Response ML20210D9471999-07-22022 July 1999 Forwards Amend 191 to DPR-40 & Safety Evaluation.Amend Authorizes Rev to Licensing Basis as Described in Updated Safety Analysis Rept to Incorporate Mod for Overriding Containment Isolation ML20210C0201999-07-20020 July 1999 Informs That Due to Administrative Oversight,Revised TS Bases Provided in to Fort Calhoun Station Were Not Dated.Dated Pages to TS Encl ML20210C2041999-07-20020 July 1999 Discusses 990715 Mgt Meeting with Midamerican Energy Co Re risk-informed Baseline Insp Program Recently Implemented at Cooper & Fort Calhoun Stations ML20210B0761999-07-19019 July 1999 Forwards Insp Rept 50-285/99-05 on 990601-0710.No Violations Noted ML20209G5351999-07-15015 July 1999 Informs That Staff Incorporated Rev of TS Bases Provided by Licensee Ltr Dtd 980904,into Fort Calhoun Station Tss. Staff Finds Revs to Associated TS Bases to Be Acceptable. Revised Bases Pages Encl ML20209F5741999-07-12012 July 1999 Ack Receipt of Transmitting Exercise Scenario for Upcoming Biennial Offsite Exercise Scheduled 990810.Scenario Reviewed & Acceptable ML20209G5591999-07-0808 July 1999 Forwards Detailed Listing of Staff Concerns with C-E TR NPSD-683,rev 3 & RCS pressure-temperature Limits Rept ML20209D8771999-07-0101 July 1999 Summarizes 990630 Public Meeting Conducted in Fort Calhoun, Ne Re Results of Completed Culture Survey,Plant Status, Facility Activities Re New NRC Oversight Process & License Renewal.Licensee Handout & Attendance List Encl ML20196F4931999-06-24024 June 1999 Discusses 990617 Public Meeting at Dana College,Blair,Ne Re Overview of Pilot Insp Program ML20196D2321999-06-21021 June 1999 Forwards Corrected Cover Ltr for Insp Rept 50-285/99-04. Original Cover Ltr Incorrectly Stated That Rept Contained Two Noncited Violations,When Rept Actually Documented Only One ML20195J2121999-06-14014 June 1999 Ack Receipt of Ltr Dtd 990316,which Transmitted Rev 16B to Site Security Plan,Rev 2 to Safeguards Contingency Plan & Rev 6 to Training & Qualification Plan for Plant,Under Provisions of 10CFR50.54(p) IR 05000285/19990041999-06-11011 June 1999 Corrected Ltr Forwarding Insp Rept 50-285/99-04 on 990425-0531.Insp Determined That One Violation of NRC Requirements Occurred & Being Treated as Noncited Violation, Consistent with App C of Enforcement Policy ML20195J2481999-06-11011 June 1999 Forwards Insp Rept 50-285/99-04 on 990425-0531.Violations Identified & Being Treated as Noncited ML20195G3141999-06-10010 June 1999 Ack Receipt of & Encl Objectives for Facility Emergency Plan Exercise,Scheduled for 990810 ML20195E8391999-06-0909 June 1999 Ack Receipt of Transmitting Changes to Licensee Emergency Plan,Rev 14 & Emergency Plan Implementing Procedure OSC-1 Under Provisions of 10CFR50,App E,Section IV ML20195G3621999-06-0808 June 1999 Ack Receipt of ,Which Transmitted Changes to Fort Calhoun Station Emergency Plan,App A,Rev 15,under Provisions of 10CFR50,App E,Section V.Nrc Approval Not Required ML20207G4741999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Fort Calhoun Station EP Implementing Procedure EPIP-OSC-1, Emergency Classification,Rev 31,under Provisions of 10CFR50, App E,Section V ML20207G4631999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Fort Calhoun Station Ep,App B,Rev 4,under Provisions of 10CFR50,App E,Section V.No Violations Identified During Review ML20207G2981999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Fort Calhoun Station Radiological Er Plan,Section E,Rev 22,under Provisions of 10CFR50,App E,Section V.Nrc Approval Not Required Due to Determination That Effectiveness Unchanged ML20207G4661999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Fort Calhoun Station EP Implementing Procedure EPIP OSC-1, Emergency Classification,Rev 30,under Provisions of 10CFR50, App E,Section V ML20207G3401999-05-27027 May 1999 Informs That NRC Held Planning Meeting on 990511 for Fort Calhoun Station to Identify Insp Activities at Facility for Next 6 to 12 Months.Informs of NRC Planned Insp Activities & Offers Licensee Opportunity to Provide Feedback ML20207A9041999-05-24024 May 1999 Informs That NRR Reorganized,Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Was Created. Reorganization Chart Encl ML20206U6331999-05-18018 May 1999 Forwards Insp Rept 50-285/99-03 on 990314-0424.Four Violations of NRC Requirements Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20206L4151999-05-10010 May 1999 Forwards SE of OPPD Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20206H4471999-05-0707 May 1999 Informs That on 990407,NRC Administered Gfes of Written Operator Licensing Exam.Licensee Facility Did Not Participate in Exam,However,Copy of Master Exam with Answer Key,Encl for Info.Without Encl ML20206E7201999-04-28028 April 1999 Responds to Meeting Conducted 990419 in Fort Calhoun,Ne Re Results of PPR Completed 990211.Addl Topics Discussed Included New Assessment Process & Upcoming Actions Planned in Response to Y2K Concerns ML20205Q5671999-04-15015 April 1999 Forwards Amend 190 to License DPR-40 & Safety Evaluation. Amend Revises TS 5.2.f & TS 5.11.2 to Change Title of Shift Supervisor to Shift Manager ML20205J2751999-04-0202 April 1999 Forwards Insp Rept 50-285/99-02 on 990131-0313.No Violations Noted.During Insp,Licensee Conduct of Activities at Fort Calhoun Station Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices ML20205A7191999-03-19019 March 1999 Informs That on 990211 NRC Staff Completed PPR of Fort Calhoun Station.Review Was Conducted for All Operating NPPs to Develop an Integrated Understanding of Safety Performance ML20207K6151999-03-11011 March 1999 Forwards Insp Rept 50-285/99-01 on 990208-26.One Noncited Violation Was Identified ML20207E8691999-03-0303 March 1999 Forwards Correction to Amend 188 to License DPR-40 for Plant,Unit 1.Administrative Error,Three Pages of TSs Contained Errors,An Incorrect Page Number,Missing Parenthesis & Misspelled Words ML20203F2041999-02-11011 February 1999 Informs That During 990208 Telcon Between Mc Ralrick & J Pellet & T Stetka,Arrangements Were Made for Administration of Licensing Examinations at Fort Calhoun Station for Week of 991018 1999-09-07
[Table view] |
Text
.
L \
s
[@ Clog %o UNITED STATES 8' 7o NUCLEAR REGULATORY COMMISSION g i WASHWGTON. D. C. 20666
\*****/ May 28,1987 Docket No. 50-285 Mr. R.L. Andrews Division Manager - Nuclear Production Omaha Public Power District 1623 Harney Street Omaha, Nebraska 68102
SUBJECT:
SURVEY OF FORT CALHOUN STATION CONTROL ROOM VENTILATION During the period of October 27-30, 1986 a survey was conducted at the Fort Calhoun Nuclear Power Plant. The survey was performed by John Driscoll and Roger Evans, Argonne National Laboratory (ANL), and Jack Hayes, NRC. The purpose of the survey was to evaluate: (1) the operation of the control room ventilation system and its ability to maintain the Fort Calhoun control room habitable and (2) the adequacy of the plant's technical specifications and procedures to demonstrate system operability and system capability consistent with the assumptions made in the plant's TMI Action Item III.D.3.4, " Control Room Habitability" analysis and the NRC staff's associated safety evaluation.
The survey team gathered flow rate data in various portions of the control room ventilation system with the system operating in its normal mode of operation. .
In addition, data was also gathered with the ventilation system operating in its emergency radiological and toxic gas operating modes. The survey team's observations covered system operation and design, plant technical specifica-tions and procedures, and the TMI Action Item III.D.3.4 analysis. The observa-tions were discussed with Omaha Public Power District personnel during the exit meeting; however, detailed results of the flow analysis were not available at that time.
The survey team's observations are listed below:
General Observations (1) Data gathered by the survey team showed that portions of the control room envelope were at a negative pressure when the ventilation systems were operating in the emergency mode of operation associated with a radiological challenge. This is contrary to plant technical specifications and the design basis for the facility which require it to be positive.
(2) There appears to be a significant amount of leakage from the air handling units such that under certain operating conditions a considerable amount i of unfiltered inleakage into the air handling unit may occur. Since you assumed no unfiltered inleakage into the envelope in your revised l III.D.3.4 analysis of September 23, 1985, the inleakage associated with j these units appears contrary to your assumption.
8706030419 870528 I PDR ADOCK 05000285 P PDR .
May 28,1987 (3) There is a considerable amount of inleakage into the control room envelope when the control room ventilation system is operating in its emergency modes of operation. In the case of a radiological challenge, inleakage measured by the survey team includes 740-1100 cfm of flow through the outside air normal makeup damper; 500 cfm of inleakage into the air handling unit VF-468, and 2000-3800 cfm in the return duct work from the control room. For the toxic gas challenge, inleakage includes 600-1500 cfm through the normal and emergency outside air intakes, 4700 cfm into the air handling units when VF-46B is operating, 3900 cfm into the return ductwork from the control room when VF-46B is operating, and 2100 cfm in the control room supply ductworks when VF-46A is operating.
Because of these large inleakage rates and the fact that portions of the control room are at a negative pressure during the radiological mode of opera-tion, you should perform a reanalysis to determine whether the conclusions previously presented in your TMI Action Plan Item III.D.3.4 analysis are still valid.
Observations involving plant operation include:
(1) The members of the plant staff responsible for the ventilation system need to be familiar with the licensing basis for the plant so that they understand the impact of changes to design conditions involving the control room ventilation equipment and its envelope.
(2) The control room envelope should be at a positive pressure of 1/8 inch W.G. with respect to all adjacent areas under the emergency mode of operation for a radiological incident. Areas where improvements can be made include the sealing of doors, dampers, integrity, and the controlling of leaks in the air handling units.
(3) Additional attention should be given to maintaining the air handling units.
(4) Significant flow occurs between the idle control room air handling unit and the operating units. There seems to be recirculation through dampers which do not isolate.
(5) Control room temperature is the most evenly distributed of any control room the survey team has seen to date.
Observations involving system design include:
(1) The control room ventilation system is susceptible to single failure (e.g., normal intake damper 860C, emergency intake damper 860A, the toilet exhaust damper, and the control room exhaust damper RCV-846).
(2) The control room envelope pressure should be measured relative to all adjacent areas not just to atmosphere.
P y- ~ ,,, , , - , ,v-r- ,-e-- .- -- --,--- m.-~-- ,--~,,-- ,-,--,.- -
. o May 28, W (3) The location of the control room ventilation system equipment may make it susceptible to a high energy line break and to steam intrusion into the control room.
(4) The location of the diesel generator exhaust is at the same elevation as the control room intake. A concern is the drawing of CO into the control room envelope through the control room emergency intake.2 (5) The licensee should verify whether the capacity of the HEPA filter utilized in the control room emergency ventilation system is 1000 cfm or 1200 cfm. Flow appears to be outside the technical specification limit of design 110%. The design value should be noted in the technical specification.
(6) The toilet exhaust damper seals the tightest of any the staff has seen to date.
(7) The modification to one of the auxiliary building fans to allow it to operate at a variable speed should be considered for two fans so that redundancy is provided. With such a change, credit could be taken for the ECCS charcoal adsorber units in the LOCA dose analysis and the control i room operator dose analysis.
(8) The adequacy of system cooling capability is questionable because both air handling units must be operated during the summer to maintain the control room comfortable.
Observations on technical specifications included:
(1) The present technical specifications do not track with the licensee's I
assumptions utilized in their analyses and accepted by the NRC staff in their SER. Technical specifications should reflect licensing basis assumptions. Proposed changes were discussed with the OPPD staff and include acceptance criteria of the laboratory test of charcoal and the acceptance criteria to which positive pressure is to be maintained in the control room envelope.
(2) The equipment qualification temperature should be measured in cabinets and not on the control room wall or in the operator station area.
I (3) Other comments were provided to the OPPD staff and included acceptance criteria for in place tests of HEPA filters and charcoal adsorbers, control room equipment and instrumentation qualification temperature.
May 28,1987 Observations on procedures include:
(1) Procedures need to address operation of both air handling units simultaneously as is done in the summer.
(2) Clarification should be provided to the procedure which addresses opera-tion with the control room at a high temperature so that it includes instructions which restore control room integrity in the event of a toxic gas challenge.
(3) The proposed loss of ventilation test should incorporate a temperature criteria such that the tests is halted when either steady state '
temperature is reached and the control room temperature remains constant or the temperature rise is such that the instrumentation and the equipment in the control room are threatened.
Other observations and information are presented in the Enclosure which is the ANLreportcoveringtheFortCalhounSurvey. The ANL report does not consti-tute the NRC staff s position regarding these items.
We request that you review the above observations and provide confirmation within 45 days that your analyses and regulatory commitments regarding the Fort Calhoun Station control room ventilation system are still valid. Otherwise indicate those changes you propose and the schedule for their implementation.
The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
Sincerely,
/A/
Walter A. Paulson, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects
Enclosure:
As stated cc w/ enclosure:
See next page DISTRIBUTION Docket File NRC PDR Local PDR PD4 Reading 3 WMt44 F. Schroeder JACalvo P. Noonan WPaulson JCraig OGC-Bethesda EJordan JPartlow ACRS (10)
Fort Calhoun Plant File
- SEE PREVIOUS E NCURREN'bPD4 /N, PD4* PD4 S PSB I PNoonan WP cn JCrijg JACalvo 5/14/87 5/14/87 5/ W 87 5/M/87 N
(2) Clarification must be provided to the procedure which addresses operation with the control room at a high temperature so that it includes instructions which restore control room integrity in the event of a toxic gas challenge.
(3) The proposed loss of ventilation test should incorporate a temperature c'riteria such that the tests is halted when either steady state temperature is reached and the control room temperature remains constant or the temperature rise is such that the instrumentation and the equipment in the control room are threatened.
Other comments and/or findings are presented in the Enclosure which is the ANL report covering the Fort Calhoun Survey.
We request that you respond to each of the items discussed above within 45 days of the receipt of this letter. j
/
The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511. /
/
Since/ely,
/
/
/
/ Walter A. Paulson, Project Manager ProjectDirectorate-IV Division of Reactor Projects - III,
Enclosure:
/
/ IV, V and Special Projects As stated /
cc w/ enclosure: /
See next page /
DISTRIBUTION /
Docket File .NRC PDR Local PDR / PD4 Reading en "rM'ieM / F. Schroeder J. Calvo P. Noonan W. Paulson '
OGC-Bethesda E. Jordan J. Partlow ACRS (10) /_ PD4 Plant File ybP ognan
-'h
.P WM,(k dis'on: sr. PSB JCraig PD4/D JCalvo 5//1/87 f 5// /87 5/ /87 5/ /87
/
/
May 28,1987 Mr. R. L.~ Andrews Fort Calhoun Station Omaha Public Power District Unit No. 1 cc:
Harry H. Voigt, Esq.
LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW Washington, D.C. 20036 Mr. Jack Jensen, Chairman Washington County Board of Su Blair,pervisors Nebraska 68008 Mr. Phillip Harrell, Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 309 Fort Calhoun, Nebraska 68023 Mr. Charles B.' Brinkman, Manager Washington Nuclear Operations C-E Power Systems 7910 Woodmont Avenue Bethesda, Maryland 20814 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Harold Borchert, Director Division of Radiological Health Department of Health 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509