ML20202F910

From kanterella
Revision as of 19:42, 1 January 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Advises That 860701 Mgt Meeting W/Util at Site in Two Rivers,Wi to Discuss SALP Rescheduled to 860718.Rev to Notice of Significant Licensee Meeting Encl
ML20202F910
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/11/1986
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
References
NUDOCS 8607150262
Download: ML20202F910 (2)


Text

. . ~ . . _ __ _ _

g _

OID b JUL 111986 Docket No. 50-266 ,

Docket No. 50-301 Wisconsin Electric Power Company ATTN: Mr. C. W. Fay Vice President Nuclear Power Department 231 West Michigan, Room 308 Milwaukee, WI 53201 i

Gentlemen:

This confirms our plans discussed between you and Mr. I. N. Jackiw of this office to reschedule our SALP meeting from July 1,1986 to July 18, 1986 at 10:30 a.m. at the Point Beach Nuclear Plant.

Should you have any questions relating to the SALP report or to the scheduled meeting, please let us know.

Sincerely, Charles E. Norelius, Director Division of Reactor Projects cc: J. J. Zach, Plant Manager DCS/RSB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII John J. Duffy, Chief Boiler Section Ness Flores, Chairperson Wisconsin Public Service Commission f

O RIII RII RII Jac iw/ as Gu demand or lius 7//f/8 7/fo/86 7//g/86 lb(

'i[s  !

1

,v Sa nto UNITED STATI:S

  1. o, NUCLEAR REGULATORY COMMisslON f REGION lli 5-S'

'f 799 ROOSEVELT ROAD CLEN ELLYN, ILLINOIS 60037

  1. '8 0'g 4 9
          • Jut,11 1986 NOTICE OF SIGNIFICANT LICENSEE MEETING Name of Licensee: Wisconsin Electric Power Company Name of Facility: Point Beach Units 1 and 2 Docket No.: 50-266; 50-301 Date and Time of Meeting: July 18, 1986 at 10:30 a.m. (CDT)

Location of Meeting: Point Beach Nuclear Power Plant Two Rivers, Wisconsin Purpose of Meeting: Management Meeting to Discuss the Systematic Assessment of Licensee Performance (SALP)

RIII Attendees:

J. G. Keppler, Regional Administrator W. G. Guldemond, Chief, Projects Branch 2, Division of Reactor Projects Others as designated by Region III NRR Attendees:

G. Lear, Project Director T. Colburn, Licensing Project Manager Licensee Attendees:

S. Burstein, Vice Chairman of the Board R. W. Britt, President and Chief Operating Officer C. W. Fay, Vice President - Nuclear Power J. J. Zach, Plant Manager C. Krause, Licensing Engineer NOTE: Attendance at this meeting by NRC personnel should be made known by July 17, 1986, via telephone call to I. N. Jackiw, Region III, FTS 388-5697 Distribution J. M. Taylor, Director, Office of Inspection and Enforcement E. L. Jordan, Director, Division of Emergency Preparedness and Engineering Response, IE J. G. Partlow, Director, Division of Inspection Programs B. K. Grimes, Director, Division of Quality Assurance, Vendor and Technical Training Center Programs R. Pierson, Regional Coordinator, IE