ML20202J808

From kanterella
Revision as of 08:49, 1 January 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-277/98-09 & 50-278/98-09 & Notice of Violation.Insp Focused on Reactor Core Isolation Cooling & 4kV Electrical Distribution Sys Operation Under Normal & Emergency Operation Conditions
ML20202J808
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/01/1999
From: Lanning W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rainey G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20202J815 List:
References
50-277-98-09, 50-277-98-9, NUDOCS 9902090250
Download: ML20202J808 (3)


See also: IR 05000277/1998009

Text

. - - - - .. - . - - . . - . - -

j, "

February 1, 1999

a.

,

I

.

4-

~

'

Mr. G. Rainey, President

'

PECO Nuclear

j. Nuclear Group Headquarters

a

Correspondence Control Desk

P. O. Box 195

l Wayne, PA' 19087-0195

i

SUBJECT: NRC ENGINEERING TEAM INSPECTION 50-277/98-09 AND 50-278/98-09

4

AND NOTICE OF VIOLATION

i

j Dear Mr. Rainey:

j This letter refers to the engineering team inspection conducted November 16 through

i December 4,1998, at the Peach Bottom Atomic Power Station. The inspection evaluated the

i effectiveness of the engineering organization in supporting safe operation of your facility. The

'

inspection focused on the reactor core isolation cooling and 4kV electrical distribution systems'

l operation under normal and emergency operation conditions. The inspection also addressed  ;

I the performance of engineering in . support of the operations and maintenance functions, with l

'

.

emphasis on problem identification and corrective action implementation, and plant safety

<

evaluations. The enclosed report provides the results of the inspection. The preliminary -i

>

findings and conclusions were presented to Mr. Doering and others of your staff on j

! December 11,1998.  !

j.  :!

j The team concluded that PECO provided effective engineering support to the station. In-depth

review of the reactor core isolation cooling (RCIC) and_4Kv electrical distribution systems

i determined that both systems were operable and capable of performing their design basis

j functions and that the analyses and procedures supporting these systems were generally  ;

j' accurate. Also, based on several areas reviewed, the team concluded that plant problems are  !

. being identified, root causes determined, corrective actions taken, and results monitored in a ';

generally effective manner.  :

!

Based on the results of this inspection, the NRC has determined that a violation of NRC l

- requirements occurred. The violation is cited in the enclosed Notice of Violation, and the

circumstances surrounding it are described in detail in the subject inspection. The team found )

two examples in which RCIC system design basis information was not properly translated into /

procedures.

100053

The NRC has concluded that information regarding the reason for the violation, the corrective

fqol :

'

'

actions taken and planned to correct the violation and prevent recurrence is already adequately -

'

addressed on the docket in inspection Report No. 50-277/98-09, 50-278/98-09 dated

- January 29,1999. Therefore, you are not required to respond to this letter unless the

description therein does not accurately reflect your corrective actions or your position. In that -

case, or if you choose to provide additional information, you should follow the instructions

specified in the enclosed Notice.

9902090250 990201

PDR ADOCK 05000277

G PDR

-

!

- .. . . - --

. . . . _ -

. _ _ __ .__ . _ _ . _ _ _ . - _ _ _ . _ - _ . _ _ _ - - _ - . _ _ _ _ _

!. ,

. l

.

G. Rainey 2

l - We appreciate your cooperation.

l

Sincerely,

-

i

Wayne D. Lanning, Director

Division of Reactor Safety

Docket Nos.: 50-277,50-278  ;

License Nos: NPF-39, NPF-85 i

Enclosures: NRC Inspection Report 50-277/98-09,50-278/98-09

and Notice of Violation

cc w/encls:

J. Hagan, Vice President, Nuclear Station Support l

J. Doering, Vice President, Peach Bottom Atomic Power Station l

l

M. Wamer, Plant Manager, Peach Bottom Atomic Power Station i

'

G. D. Edwards, Chairman, Nuclear Review Board

R. Boyce, Director, Nuclear Quality Assurance i

A. F. Kirby, Ill, Extemal Operations - Delmarva Power & Light Co. j

G. J. Lengyel, Manager, Experience Assessment l

J. W. Durham, Sr., Senior Vice President and General Counsel

H. C. Kresge, Manager, Extemal Operations, Connectiv

N. J. Sproul, Manager, Financial Control & Co-Owner Affairs, Connectiv

R. McLean, Power Plant Siting, Nuclear Evaluations

D. Levin, Acting Secretary of Harford County Council I

'

R. Ochs, Maryland Safe Energy Coalition

J. H. Walter, Chief Engineer, Public Service Commission of Maryland

Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance  ;

Mr. & Mrs. Kip Adams j

Commonwealth of Pennsylvania  !

State of Maryland

TMI - Alert (TMIA)

!

,

!

l

._ _ _ _ _ _ _ . . . __ .._. . _ _ _ .. _ _ _ _ . _ .

  • *

.

.

3

Distribution w/ encl:

Region i Docket Room (with concurrences)

Nuclear Safety information Center (NSIC)

NRC Resident inspector

PUBLIC

H. Miller, RA/J. Wiggins, DRA (1)

W. Lanning, DRS

W. Ruland, DRS

J. Yerokun, DRS

A. Lohmeier, DRS

C. Cowgill, DRP

D. Florek, DRP

S. Barr, DRP

C. O'Daniell, DRP

DRS File

Distribution w/ encl: (Via E-Mail)

G. Shear, OEDO

W. Dean, PDI-2, NRR

inspection Program Branch, NRR (IPAS)

M. Thadani, NRR

B. Buckley, NRR

R. Correia, NRR

DOCDESK

l

.

DOCUMENT NAME: G:\CMMEB\LOHMEIER\ LIM 9809. INS

To receive a copy of this document, indicate in the box: wit

"C" = Copy,h%gf'opy

attachment / enclosure "E" = Copy with attachment / enclosure ppf c

OFFICE Rl/DRS Rl/DRS ,

, Rl/DRP fj Q Rl/DRS ,, g ..

l NAME Alohnyeier A// GMeypr [,j, / CAnderson "" JWigginsLG /GR

DATE 12/wf98 $ 01M/99 ~)l M/ 01/p(/99 //qy/7f

'

l

\ OFFICIAL fCORD COPY

L