Peach Bottom Atomic Pmwer Ctation' ,
s..g_ "
RECO! NUCLEAR nm ~v c-1848 Lay Road -
- A Unit of PECO Energy! Na gPAj7314 oo32.
December 4,1997 U.S. Nuclear Regulatory Commission Document Control Desk
- Washington, D.C. 20555 Docket Nos. 50-277 and 50-278-
' Gentlemen:
Enclosed is the monthly operating report for Peach Bottom Units 2 and 3 for the month of November
~ 1997 forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1,
' Revision 4.
' Sincerely,-
r r
t Mark E. Wamer Director, Site Ecgineering Peach Bottom Atomic Power Station
../ '
- MEW /M JM:dmkg') n %
Enclosures ' pdW
. cc: N.J. Sproul, Public Service Electric & Gas E. Salowitz, Public Service Electric & Gas W.P, Domsife, Commonwealth of Pennsylvania
- R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L. Schmidt, USNRC, Senior Resident inspector T. M. Messick, Atlantic Electric -
A.F. Kirby,'ll!, Delmarva Power & Light INPO Records C6nter '
T. N. Mitchell, PECO Nuclear, Vice President, Peach Bottom Atomic Power Station
/
f 39&) I -
/
- ccn 9714071'- , l i,
. . , a n ['; '.2 0 9712220062 971130~
PDR .ADOCK 05000277'
' R :. PDR. ,
Pc:ch Bottom Atomic Power St tion
) .
Unit 2 November 1 through November 30,1997
- 1. Narrative Sy_q1 mary of Operatina Experiences Unit 2 began the month of November at a nominal 100 % of rated thermal power (RTP).
On November 5,1997 at 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br />, power was reduced to 04% of RTP for SB Feedwater Heater steam leak repair. Power was restored to 100% on November 7,1997 _
at 000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />.
On November 9,1997 at 15:25 U/2 automatic scram occurred due to loss of DC voltage during swap nf battery chargers. Power was restored to 100% on November 11, at 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />.
Unit 2 ended this month operating at 100% RTP.
i
l - Attichm:nt to Monthly Operating Report for November 1997
_ UNIT 2 REFUELING INFORMATION
- 1. Name of facility.
Peach Bottom Unit 2
- 2. Schcduled date for next refueling shutdown:
Reload 12 is scheduled for October 2,1998.
- 3. Scheduled date for restart following refueling:
Restart following refueling forecast for October 30,1998.
- 4. Will refueling or resumption of operation therefore require a technical specification change or other license amendment?
N/A If answer is yes, what, in general, will these be?
N/A
- 5. Scheduled date(s) for submitting proposed licensing act:an and supporting information:
- 6. Important licensing consi-le ations associated w3 refueling, e.g., new or Efferent fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
w
- 7. The number of f.iel assemblies (a) in the core and (b) in the spent fuel storage pool:
- a) Core - 764 Fuel Assemblies (b) Fuel Pool- 2720 Fuel Assemblies,52 Fuel Rods
-- _ - ii ._ _.___ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ . . _ . _ _ . _ _ _ . _ _ _ _ _ _ _
Dock:t No. 50-277 Attrchm:nt to Monthly Operating Report for November 1997 Page 2 UNIT 2 REFUEt ING INFORMATION (Continued)
- 8. The present licensed spent fuel pool storage capacity and it a size of any increase in licensed storage capacity that has been requested or is plan.1ed, in number of fuel assemblies:
The spent fuel pool t,torage capacity has been relicensed for 3819 fuel assemblies.
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
September 2002 without full core offload capability.
September 1998 with full core of00ad capability.
l
AVERAGE DAILY POWER LEVEL
' DOCKET NO. 50-277 UNIT PEACH BOTTOM UNIT 2 DATE DECEMBER 3,1997 '
COMPANY PECO EN"EGY. COMPAf#
f E. A. DUNNING , l.
BUSINESS SERVICES
$1TE S'JPPORT DMSION '
PEACH BOTTOM ATOMIC FCWER STATION ~
TELEPHONE (717)456-3412 MONTH NOVEMBER,1997 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL DAY (MWE-NET) (MWE-NET) l 1119 17 1123 1
2 5113 18 1122 3 1117 19 1127 l
4 1123 20 1114 1120 21 1130 5
6 1072 22 1126 7 1125 23 1122 8 1120 24 1126 9 720 25 1118 to 0 26 1122 11 322 27 1126 <
12 962 28 1121 13 1094 29 1116 14 1127 30 1120 15 1122 16 1122
l OPERATING DATA REPORT DOCKET NO.53-277 '
DATE DECEMBER 3,199' . ~
COMPLETED BY PECO ENERGY COMPANY
- E. A. DUNNING BUSINESS SERVICES * -
SITE SUPPORT DMSION PEACH BOTTOM ATOM)C POWER STATION TELEPHONE (717) 726-3412 OPERATING STATUS . _.
- 1. UNIT NAME: _ _ _ . _ _ _ _ . _ _ . . . _ . _ - . _ .. _ _ . .. _ _ _ ~ _ . P. EA._CH BO. TT..OM.U. NI.T. 2. .
- 2. REPORTING PERIOD:, _ _ . _ . _ _ _ _ _ _ _
_ _ NOVEMBER,1997,
- 3. LICENSED THERMAL POWER (MWT): _ . _ _ _ _ _ __. __ _ _ _ _ __3458_
4 NAMEPLATE RATING (GROSS MWE): _ _ _ . _ _. . _ _ . _ _ _ 1221
- 5. DESIGN ELECTRICAL RATlHG (NET MWE): __ ___ _._ _ _ _ __.__ __. .____ _1119
- 6. MAXIMUM DEPENDABLE CAPAC!TY (GROSS MWE): _ _.,_ __. _ _ _._ _ 1159
- 7. MAXIMUM DEPENDABLE CAPACITY (NET IME): 1093
- 8. IF CHANGES OCCUR IN C,. .ATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO VvHICH RESTRICTED, IF ANY (NET MWE):
M REASONS FOR RESTRICTIONS,IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE 720 8,016 205,200
- 11. HOURS IN REPORTING PERIOD 691.6 7,987.6 138,903.1
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 0.0
- 13. REACTOR RESERVE SHUTDOWN HOURS 683 0 7,979 0 134,756 2
- 14. HOURS GENERATOR ON-LINE -
l 0.0 0.0 0.0
- 15. UNIT RESERVE SHUTDOWN HOURS 3,049,987 28,007,942 409,983.522
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 766,200 9.044,500 134,514,090
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 745,978 8,810,958 129,277,410
- 18. NET ELECTRICAL ENERGY GENEhATED (MWH) l PAGE 1 OF 2
~
+
, w
- e-
. s.
s m
. n- s . . -v-m
.. 4 4
..-s - - , - m - ~ .
+.. .,
su
- 1 OPERATING DATA REPORT (CONTINLED) ',j 1 . . . . . ....
t , '
i
< DOCKET NO.. !50 - 277 : sJ i .p DATEi DECEMBER 3.1997 - TC
.s. , ;
fa
- L THIS MONTH L YR-TO-DATE ' ' CUMULATNE
~
i 19. UNIT SERVICE FACTOR .. , - 94.9 % ,. .
99.5 % ' 95.7 % ; ..
- 20. UNIT AVAILABILITY FACTOR
- 94.9 % ' 99.5 % ' '
05.7 % ' ~ -
~
H 21.- (THIT CAPACITY FACTOR (USING MDC NET) ' 94.8 % 100.6 %- . 59.5 % '
L 22. UNIT CAPACITY FACTOR (USING DER NET) ' . 92.6 % 98_2 % - J. 58.5 % ,
' 23. UNIT FORCED OUTAGE RATE - 5.1 % .5 % - r t 11.1 %'-
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS' (TYPE, DATE AND DURATION OF EACH):
. . i 1
- 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP
- ;
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS): FORECAST' ACHtEVED
' INITIAL CRITICAUTY 09/16/73 -
INITIAL ELECTRICITY
. 02/18/74
, COMMERCIAL OPERATION - 07/05/74 -
r 1
i- ,
,, l i
, , PAGE 20F 2h 1
w ~m < . , . , < -
.v~- v,v 4, s..4,- , g g 1 ,u..., 4 , -n. -.n.,.4 ...w,,. ++w-- ,m ,. wN-e . s,se,- ..w , m .s
- l. UNIT SHUTDOWNS AND POWER REDUCTIONS
. DOCKET NO. 50-277 )l
' UfET MAME PEACH BOTTOM UNIT 2 '
DATE DECEMBER 3,1997 - .
COMPLETED BY PECO ENERGY COMPANY -
E. A. DUNNING BUSINESS SERVICES SITE SUPPORT DMSION PEACH BOTTOM ATOMC POWER STATION REPORT MONTH NOVEMBER,1997 TELEFHONE (717)456-3412
{ METHOD OF L!CENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE REASON. SHUTTING DOWN EVENT CODE CODE ACTION TO TYPE- DURATION REACTOR (3) REPORT # (4) (5) FREVENT RECURRENCE NO. DATE (1). (HOURS) (2)
H 3 BATTRY less of DC voltage during swap of battery chargers f Q 971109 F 37.0 TOTAL HOURS 37.0 l
I l
l l
l (2) (3) (4)
(1)
REASON METHOD EXH! BIT G-INSTRUCTIONS l F-FORCED FOR PREPARATION OF DATA A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL l- S- SCHEDULED B - MAINTENANCE OR TEST 2- MANUAL SCRAM ENTRY SHEETS FOR UCET.SEE C - REFUEUNG 3- AUTOMATIC SCRAM EVENT REPORT (LER)
D - REGULATORY l" STR!CTION 4- OTHER (EXPLAIN) FILE (NUREGC81)
E - OPERATOR TRAINING + LICENSE EXAMINATION l
F ADMINiSTRATMI (5) i- EXHIBIT I-SAME SOURCE l G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER (EXPLAIN)
l P: ch Bottom Atomic Power St tion Unit 3 November i through November 30,1997
- 1. Narrative Summary of Operatina Experiences Unit 3 began the month of November at 0% of rated thermal power (RTP) due to refueling 4 outage.
On November 8,1997 at 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> the Unit reached 93% of RTP. The Unit was held at 03% RTP due to jet pump riser weld cracking indications. The Unit was raised to 100% on November 12 at 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />.
On November 14,1997 at 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> the Unit was reduced back to 93% of RTP due to jet pump riser weld cracking indications.
On November 28,1997 at 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br /> the Unit was manually shutdown to repair the "E" Steam Relief Valve. The Unit remained shutdown throughout the remainder of the month.
l .
Dock;t No. 50-270 I Attichment to Monthly Operating Report for November 1997 UNIT 3 REFUELING INFORMATION
- 1. Name of facility:
Peach Bottom Unit 3 2, Scheduled date for next refueling shutdown: :s Reload 11 scheduled for October 3,1997 is in progress
- 3. Scheduled date for restart following refueling Restart following refueling scheduled for November 1,1997
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
N/A 4
If answer is yes, what, in general, will these be?
- 5. All items have been submitted.
- 6. Important licensing considerations ass (clated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performa nce analysis methods, significant changes in fuel design, new operating procedures:
(a) The 292 new 3R11 bundles are GE 13 design new to Unit 3
- 7. The number of fuel assemblies (a) in the core and (b)in the spent fuel storage pool:
(a) Core - 764 Fuel Assemblies (b) Fuel Pool- 2777 Fuel Assemblies,16 Fuel Rods (292 new 3R11 bundles)
( one of the 2777 is a skeleton which contains less than a full complement of fuel rods)
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned,in number of fuel assemblies-The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
l 1
- : Docket No ' 50-278
. ' Attachment 13 :
-- + . Monthly Operating --
Repon for November 1997 ;
Page 2 7 4 4 UNIT.3 REFUELING INFORMATlON (Continued)-
= 9. - The projected date of the last refueling that can be discharged to the spent fuel pool assuming .-
- the present capacity: ,
G ptember 2003 withcut full core offload capability,
- a September 1999 with full core offload capebility. !
1 t
7
. t t
't h'
Y W
i w -
-e + w
AVER".GE DA!LY POWER LEVEL DOCKETNO. 50-278 UNIT PEACH BOC UNIT 3 DATE Dr EMegg. jg7 - "
COMPANY PECO ENEnuY COMPANY '*
E. A. DUNfilNG BUSINES$ SERVICES SITE SUPPORT D' VISION .
PEACH BOTTOM ATOMC POWER STATION TELEPHONE (717)4560412 MONTH NOVEMBER,1997 AVERAGE DA!LY POWER LEVEL DAY AVEP. AGE DAILY POWER LEVEL DAY (MWE-NET) (MWE-NET) 0 17 1039 .
1 37 18 1039 2
1'J5 19 1039 3
4 491 20 1027 938 21 1048 l 5 941 22 1038 6
1044 23 1037 7
24 1041 8 1040 25 1033 9 1042 i
1025 25 1038 10 11 1038 27 1042 1105 28 741 12 13 1112 29 0 14 1104 N O 15 1031 16 1044
OPERATING DATA REPORT DOCKET NO 50- 7/8 CATE DECEMBER 3,1997 -
COMPLETED BY PECO ENERGY COM'ANY E. A. DUNNING BUS.* NESS SERVICES
- SITE SUP' ORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)456-3412 l
l OPERATING STATUS l
- 1. UNIT NAME: _ _ _ _ _ . __, ,
_, _ ._ _ , _ PEACH BOTTOM U. NIT 3 NOTES:
NOVEMBER,1997_
- 2. REPORTING PERIOD: _ . _ _ _ ___ _ _ _ _ . _ _ _
- 3. LICENSED THERMAL POWER (FENT): __ ._ _ ._
_3458 1221,
- 4. NAMEPLATE RATING (GROSS MWE): ____ _ _ . . . . _ _ . . _ __
- 5. DESIGN ELECTRICAL RATING (NET MWE): ___ _ . _ _ _ ___ __
_111,9
_ _ _ _ _._1159
' 6. MAX' MUM DEPENDABLE CAPACITY (GROSS MWE): _ _ . _
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): ___ __ __
,_ _1093
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED,IF ANY (NET MWE):
10 REASONS FOR RESTRICTIONS,IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE 720 8,016 201.096
- 11. HOURS IN REPORTING PERIOD 667.1 7,227.6 137,209.9
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 00 0.0 0.0
- 13. REACTOR RESERVE SHUTDOWN HOURS 631.0 7,179 0 133,614 2
- 14. HOURS GENERATOR OrJ-LINE 0.0 0.0 0.0
- 15. UNIT RESERVE SHUTDOWN HOURS 1,903.121 21,925,404 400,927,382
- 16. GROSS THERM *'. ENERGY GENERATED (MWH) 624,700 7,043,100 131,361,532
- 17. GROSS ELECTRICAL ENERGY GENERAT ED (MWH) 607,756 6,825,513 126.264,053
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)
PAGE 1 OF 2
- m. -
- lv.
- u > c
.{
- -r- -
OPERATING DATA REPORT (CONTir1UED) .. . .
- ,._ r ' '
.g --
' DOCKET NO. . 50 -278 --
._m DATE " DECEMBER 3.1997 ;
3
THIS MONTH ~ YR-TCMMTE . CUMULATNE L- ' r .19.. UNIT SERVICE FACTOR .- 87.6 % 89.6 % es.4 %;
i .20. UNIT AVAlt.ABluTY FACTOR ' 87.6 % - 89.6 % . 66.4 %
L 21. UNIT CAPACITY FACTOR (USING MDC NET) - 77.2 % - 77.9 % 60.2 %
! 22. ' UNIT CAPACITY FACTOR (USING DER NET) ' 75 4 % ~ 76.1 % ' 56.6 %
- 23. UNIT FORCED OUTAGE RATE - .0 % 1.0 % 10.0 %
' 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
L 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP; -
^
f 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPEPATIONS): -FORECAST ACHIEVED L INITIAL CRITICALITY 0807/74
' !NmAI. ELECTRICITY 0001/74
' COMMERCIAL OPERATION -12/23/74 '
l 1
' PAGE'2"OF 2 .
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-278 ,
UNTT NAME PEACH BOTTOM UNIT 3 DATE DECEMBER 1't,1997 .. ,
COMPLETED BY PECO ENERGY COMPANY .
E. A. DUNNING BUSINESS SERVICES ^
SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)4563412 REPORT MONTH NOVEMBER,1997 SYSTEM COMPONEht CAUSE AND CORRECTIVE METHOD OF LICENSEE CODE CODE ACTION TO l
REASON SHUTTING DOWN EVENT TYPE DURATION (5) PREVENT RECURRENCE .
f REACTOR (3) REPORT 8 (4)
NO. DATE (1) (HOURS) (2)
ZZ 777777 Refuehng Outage S 34 3 C 2
'10 971101 RA PUMPXX Jet pump riser weld cracidng 0.0 H 4 (duration shown enfy for shutdown) 11 971108 S CC VALVEX T SRVieelong S 55 0 A 2 (durabon to shown only for shutdown)
I 12 971128 TOTAL HOURS 89 0 (3) (4)
(1) (2)
METHOD EXHIBIT G-INSTRUCTIONS F-FORCED REASON 1-MANUAL FOR PREPARATION OF DATA S - SCHEDULED A -EQUIPMENT FAILURE (EXPLAIN) 2- MANUAL SCRAM ENTRY SHEETS FOR UCENSEE B- MAINTENANCE OR TEST 3- AUTOMATIC SCRAM EVENT REPORT (LER)
C - REFUELING FILE (NUREG4161) ,
4- OTHER (EXPLAIN) '
D - REGULATORY RESTRICTION E - OPERATOR TRAIN!NG + LICENSE EXAMINATION (5)
F- ADMINISTRATIVE EXHIBIT I- SAME SOURCE G- OPE ~4TIONAL ERROR (EXPLAIN)
H - OTHE". (EXPtAIN)
. -. .. .. .. , . ..