Responds to NRC 860722 Notice of Violation & Proposed Imposition of Civil Penalty from Insp Rept 50-128/86-01. Extension of Response Until 860922 Requested
ML20205E011
Person / Time
Site: 05000128
Issue date: 08/11/1986
From: Richardson H
TEXAS A&M UNIV., COLLEGE STATION, TX
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
EA-86-105, NUDOCS 8608180224
Download: ML20205E011 (2)


Text

__.

a TEXAS ENGINEERING EXPERIMENT STATION Office of the Director F

August 11, 1986 Director office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Reference:

Docket No. 50-128, License R-83, EA 86-105

Subject:

July 22, 1986 Notice of Violation and Proposed

l. Imposition of Civil Penalty (NRC Inspection Report No. 50-128/86-01)

Dear Sir:

In reference to the above Notice of Violation and the conditions for reply as stated on page 2, " Consideration may be given to extending the response time for good cause shown", the Texas i Engineering Experiment Station (Licensee) requests a 30 day extension of the reply date to 22 September 1986 for the following reason:

! As discussed during the enforcement conference of 21 May 1986, one of the corrective actions planned by the Licensee was the addition of a prominent reactor administrator to the NSC technical staff for the purpose of providing needed assistance in operational and l developmental research programs for the reactor. Dr. Jon A.

Reuscher, Manager, Reactor Development and Applications at Sandia Laboratory, Albuquerque, New Mexico, will join the staff on 1 September as Director of Nuclear Research Reactor Programs. It is very desirable that Dr. Reuscher be given the opportunity to review the notice of violation and take part in the evaluation and reply process. An extension of 30 days would provide adequate time for his i involvement.

I gagggji $$$kje r O

klb The Texas A&M University System o Engineenng Research Center Col!cge Station, Texas 77843-3577 e 909) 8451321 l

o Director, Office of Inspection and Enforcement August 11, 1986 Page 2 Your consideration of this request will be appreciated.

Yours very truly, S$ t Herbert H. Richardson Director Texas Engineering Experiment Station HHR:ja cc: Robert D. Martin, Regional Administrator Carl Erdman, Associate Dean, College of Engineering Lee Peddicord, Department Head, Nuclear Engineering Don Feltz, Director, Nuclear Science Center Feenan Jennings, Chairman, Reactor Safety Board Perry L. Adkisson, Chancellor, TAMU System Donald Mcdonald, Provost, TAMU