|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20211Q4001999-09-0707 September 1999 Forwards Final Version of Nuclear Science Ctr TS Pending Official Approval from Nrc.Revised TS Simply Incorporates Changes That Were Proposed in Previous Ltrs with Exception of Minor Mod ML20209F0171999-07-0909 July 1999 Forwards Insp Rept 50-128/99-201 on 990608-10.No Safety or Noncompliance Concerns Identified.Various Aspects of Reactor Health Physics & Safeguards Programs Inspected ML20195J4391999-06-10010 June 1999 Forwards Initial Exam Rept 50-128/OL-99-01 Administered During Wk of 990405 to Employees of Facility Who Had Applied for License to Operate Texas A&M Univ Reactor ML20195J9881999-06-10010 June 1999 Forwards Results of Operator Initial Exam Conducted at Texas A&M Univ on 990405-06.Without Encl ML20205R2391999-04-14014 April 1999 Informs That DOE Was Unable to Fund Conversion of Tx A&M Univ Nuclear Science Center Reactor to Low Enrichment U Fuel in FY98 ML20202J6071999-02-0404 February 1999 Advises of Arrangements Made with a Sanchez for Administration of Operator Licensing Exam Wk of 990329. Forwards Ref Matl for RSO & RO Licensing Exam,Administration of Written Exam & Procedures for Administration of Exam ML20197H0921998-12-0808 December 1998 Forwards Insp Rept 50-128/97-201 on 971103-05 & 981102-05.No Significant Safety Issues Were Identified & No Reply Required ML20155A4221998-10-22022 October 1998 Forwards Comment on Rev to Nuclear Science Center Physical Security Plan Submitted by Ltr Dtd 980916.Use Guidance Provided in Reg Guide 5.59 to Address Development of Rev to Security Plan in Response to Comments ML20154L2231998-10-14014 October 1998 Forwards RO License Certificate for CM Lemons,Newly Licensed Individual at Texas A&M Univ ML20153C9791998-09-22022 September 1998 Forwards Copy of Results of Operator Initial Exam Conducted at Texas A&M Univ on 980914.Without Encl ML20154F5391998-09-22022 September 1998 Forwards Inital Exam Rept 50-128/OL-98-02 Administered During Week of 980914 to Employee of Facility Who Applied for License to Operate Texas A&M Univ Reactor ML20153B7501998-09-16016 September 1998 Informs That Nuclear Science Ctr Has Reviewed & Revised Physical Security Plan to Fully Implement NRC Comments & Recommendations,With Exception of One General Comment. Encl Withheld ML20237D6541998-08-20020 August 1998 Discusses Arrangements Made W/A Sanchez,For Administration of Operating Licensing Exams at Texas A&M Univ During Wk of 980914.Matl Furnished for Exam Administered in May 1998 Will Be Used ML20236Q3181998-07-0909 July 1998 Forwards Comments Re Rev to Nuclear Science Ctr Physical Security Plan.Comments Requested to Be Included in Rev to Plan ML20236N0041998-06-22022 June 1998 Forwards SRO Certificates to B Correll,P Pratt & J Stone. W/O Encls ML20249A6291998-06-12012 June 1998 Forwards Copy of Results of Operator Initial Exam Conducted at Texas A&M Univ on 980526-28.W/o Encl ML20249A6101998-06-12012 June 1998 Informs That During Week of 980525,NRC Administered Initial Exam to Employees of Facility Who Applied for License to Operate Texas A&M University Reactor ML20249A6081998-06-11011 June 1998 Forwards Request for Addl Info Re 980126 Application for Amend to Texas A&M Triga Research Reactor License Dealing W/Production of I-125 ML20217M7531998-03-30030 March 1998 Informs That DOE Will Be Unable to Fund Conversion of Texas A&M Univ Nuclear Science Ctr Reactor to Low Enrichment U Fuel in FY97,IAW 10CFR50.64 ML20217F1801998-03-24024 March 1998 Informs That Ltr Submitted W/Nuclear Science Reactor Physical Security Plan Failed to Mention That Changes to Plan Do Not Reduce Effectiveness of Plan & Plan Submitted IAW 10CFR50.90 ML20217Q0831998-03-0202 March 1998 Forwards Nuclear Science Ctr Physical Security Plan.Changes on Copy Designated by Black Vertical Lines in Right Margin. Encl Withheld ML20203J0521998-02-25025 February 1998 Informs That Data Contained in Pages 2,3 & 4 of License Amend Application Submitted by Will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20202G2151998-02-0808 February 1998 Requests That Specific Parts of SE Accompanying 980126 Request for Amend to TS Be Withheld from Public Disclosure Per 10CFR9.17 & 10CFR2.790 ML20199J2841998-01-29029 January 1998 Transmits SRO License Certificate to Th Fisher.W/O Encl ML20199K5241998-01-29029 January 1998 Forwards Revised Ts,Including Minor Changes Made to Sections 3.5.2,6.6.1.f.1 & 6.6.2 ML20199D7801998-01-23023 January 1998 Forwards Revised Safeguard Contingency Plan for Nuclear Science Ctr at Tx A&M Univ,Per 10CFR50.54(p).Changes Do Not Reduce Effectiveness of Security Plan.W/O Encl ML20199C1941997-11-13013 November 1997 Forwards Senior Reactor Operator License Certificates to AB Caldwell & Bk Correll.W/O Encl ML20199B2141997-11-0303 November 1997 Confirms Arrangements Between W Eresian & a Sanchez for Administration of Operator Licensing Exam.Final Applications Certifying Training Must Be Completed & Submitted at Least 14 Days Before First Exam Date ML20211A7141997-09-17017 September 1997 Forwards Signed Amend 19 to Indemnity Agreement E-12 ML20216E9741997-09-0404 September 1997 Forwards Results of Operators Initial Exam Conducted at Facility on 970825-26.W/o Encl IR 05000128/19970011997-08-11011 August 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-128/97-01 on 970317-21.Revised NOV Re Violation E,Concerning Failure to Survey Encl ML20149F3461997-07-15015 July 1997 Forwards Amend 19 to Indemnity Agreement E12,amend 14 to License R-83 & Se.Amend Modifies License Conditions to Allow Greater Flexibility in Possession & Storage of Radioactive Matls Used to Support Research & Development within Site ML20141C6271997-06-16016 June 1997 Responds to NRC Ltr Re Violations Noted in Insp Rept 50-128/97-01 on 970317-21.Corrective Actions:Requalification Program Implementation Responsibility Has Been Assigned to Individual Designated as Reactor Administrative Assistant ML20140D2811997-06-0404 June 1997 Informs of Arrangements Made for Administration of Operator Licensing Exams for Wk of 970825.Ref Matls for Exam,Facility Review of Written Exams,Administration of Written Exams & Procedures for Administration of Written Exams Encl ML20148F1151997-05-29029 May 1997 Forwards Insp Rept 50-128/97-01 on 970317-21 & Notice of Violation.Nrc Will Use Facility Response to Determine Whether Further Enforcement Action Will Be Needed.Mgt Meeting W/Nrc Scheduled for 970619 to Discuss Insp Findings ML20138C8741997-04-25025 April 1997 Informs That DOE Will Be Unable to Fund Conversion of Texas A&M Univ Nuclear Science Ctr Reactor to Low Enrichment U Fuel in FY97 ML20137Y0301997-04-16016 April 1997 Forwards Rev 4 to Nuclear Science Center Senior Reactor Operator & Reactor Operator Requalification Program ML20137T9251997-04-11011 April 1997 Forwards Reactor Operator License Certificate to Dj Beckel, Newly Licensed Individual at Texas Engineering Experiment Station Reactor.W/O Encl ML20137L3321997-04-0303 April 1997 Forwards Retaken Exam Rept 50-128/OL-97-01 on 970324.Exam Administered to Employee,To Operated Texas A&M Triga Reactor ML20137R4221997-04-0303 April 1997 Forwards Results of Operator Initial Exam Conducted at Facility on 970324.W/o Encl ML20137C9001997-03-19019 March 1997 Forwards Reactor Operator License Exam,Category B,To Be Administered to D Beckel on 970324.Pre-exam & post-exam Security Agreement Also Encl for Signature & to Be Returned W/Exam Matls ML20135D5391997-02-25025 February 1997 Requests That Indemnity Agreement E-12 Be Changed as Listed ML20147E2351997-02-13013 February 1997 Forwards Reactor Operator License Certificates to Listed Individuals.W/O Encl ML20135E9411996-12-0909 December 1996 Forwards Initial Exam Rept 50-128/OL-96-02 Administered to Employees Who Had Applied for License to Operate Texas A&M Reactor During Wk of 961118 ML20135D8671996-12-0606 December 1996 Forwards Results of Operator Initial Exam Conducted on 961119-21.W/o Encl ML20135E1591996-12-0505 December 1996 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp of License R-83 ML20134M7061996-11-21021 November 1996 Forwards Request for Addl Info,In Order to Complete Review of 960715 Application to Increase Power Level of Texas A&M Univ Sys Nuclear Science Center Reactor Up to 1,500 Kilowatts ML20134L6851996-11-18018 November 1996 Forwards Certificates to Two Newly Licensed Individuals at Texas A&M University System.W/O Encls ML20129A8591996-10-17017 October 1996 Informs NRC of Reportable Occurrence Re Violation of Tech Specs LCO on 961015.Automatic Ventilation Sys Shutdown Bypassed During Air Monitor Check Prior to Reactor Startup ML20129F0981996-09-27027 September 1996 Informs of Arrangements Made W/B Asher for Administration of Operator Licensing Exam During Wk of 961118 1999-09-07
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20211Q4001999-09-0707 September 1999 Forwards Final Version of Nuclear Science Ctr TS Pending Official Approval from Nrc.Revised TS Simply Incorporates Changes That Were Proposed in Previous Ltrs with Exception of Minor Mod ML20205R2391999-04-14014 April 1999 Informs That DOE Was Unable to Fund Conversion of Tx A&M Univ Nuclear Science Center Reactor to Low Enrichment U Fuel in FY98 ML20153B7501998-09-16016 September 1998 Informs That Nuclear Science Ctr Has Reviewed & Revised Physical Security Plan to Fully Implement NRC Comments & Recommendations,With Exception of One General Comment. Encl Withheld ML20217M7531998-03-30030 March 1998 Informs That DOE Will Be Unable to Fund Conversion of Texas A&M Univ Nuclear Science Ctr Reactor to Low Enrichment U Fuel in FY97,IAW 10CFR50.64 ML20217F1801998-03-24024 March 1998 Informs That Ltr Submitted W/Nuclear Science Reactor Physical Security Plan Failed to Mention That Changes to Plan Do Not Reduce Effectiveness of Plan & Plan Submitted IAW 10CFR50.90 ML20217Q0831998-03-0202 March 1998 Forwards Nuclear Science Ctr Physical Security Plan.Changes on Copy Designated by Black Vertical Lines in Right Margin. Encl Withheld ML20202G2151998-02-0808 February 1998 Requests That Specific Parts of SE Accompanying 980126 Request for Amend to TS Be Withheld from Public Disclosure Per 10CFR9.17 & 10CFR2.790 ML20199K5241998-01-29029 January 1998 Forwards Revised Ts,Including Minor Changes Made to Sections 3.5.2,6.6.1.f.1 & 6.6.2 ML20199D7801998-01-23023 January 1998 Forwards Revised Safeguard Contingency Plan for Nuclear Science Ctr at Tx A&M Univ,Per 10CFR50.54(p).Changes Do Not Reduce Effectiveness of Security Plan.W/O Encl ML20211A7141997-09-17017 September 1997 Forwards Signed Amend 19 to Indemnity Agreement E-12 ML20141C6271997-06-16016 June 1997 Responds to NRC Ltr Re Violations Noted in Insp Rept 50-128/97-01 on 970317-21.Corrective Actions:Requalification Program Implementation Responsibility Has Been Assigned to Individual Designated as Reactor Administrative Assistant ML20138C8741997-04-25025 April 1997 Informs That DOE Will Be Unable to Fund Conversion of Texas A&M Univ Nuclear Science Ctr Reactor to Low Enrichment U Fuel in FY97 ML20137Y0301997-04-16016 April 1997 Forwards Rev 4 to Nuclear Science Center Senior Reactor Operator & Reactor Operator Requalification Program ML20135D5391997-02-25025 February 1997 Requests That Indemnity Agreement E-12 Be Changed as Listed ML20129A8591996-10-17017 October 1996 Informs NRC of Reportable Occurrence Re Violation of Tech Specs LCO on 961015.Automatic Ventilation Sys Shutdown Bypassed During Air Monitor Check Prior to Reactor Startup ML20115D0351996-07-0808 July 1996 Informs NRC That Name of Level 1 Licensee for Tx A&M Univ Sys/Tx Engineering Experiment Station Nuclear Science Ctr, Now Bd Russell,Effective 960701 ML20101N0281996-04-0303 April 1996 Informs That DOE Unable to Fund Conversion of Licensee Reactor to LEU Fuel in FY96,in Accordance w/10CFR50.64, Limitations on Use of HEU in Domestic Non-Power Reactors ML20093C2371995-10-0606 October 1995 Forwards Rev to Emergency Preparedness Plan for Nuclear Science Ctr Tx A&M Univ Sys. Change Increases Required Time for Emergency Class Event from Minutes to Hours ML20087G3531995-03-20020 March 1995 Informs That Nuclear Science Ctr Has Completed Preliminary Amend to SAR to Include Conversion to LEU Fuel ML20081F4871995-03-10010 March 1995 Advises That Nuclear Science Ctr Has Revised Safeguards Contingency Plan.Plan Withheld ML20078F5131995-01-13013 January 1995 Confirms 950113 Telcon Re Interpretation of Licensee FOL R-83,section (B(3)) Re Use of Byproduct Matl at Facility ML20078E1301994-11-0404 November 1994 Forwards Safeguards Contingency Plan,Per 10CFR50.54(p). Revised Plan Provides Better Agreement Between Working Plan & Regulations Requiring Plan.Encl Withheld ML20024J3741994-10-0707 October 1994 Forwards Rev of Emergency Preparedness Plan for Nuclear Science Ctr Tx A&M Univ Sys. Plan Rewritten to Correct Weakness Identified by Previous NRC Insp at Facility (NRC Insp Rept 50-128/93-01) & Changes Desired by Licensee ML20071L4851994-07-27027 July 1994 Responds to NRC Re Violation Noted in Insp Rept 50-128/94-01.Corrective Action:Audit Program Has Been Expanded Under Mop to Include Reactor Operations Records & Experimental Facilities/Experiments/Records ML20069A4231994-05-0606 May 1994 Advises of Issuance of Grant to Perform Core & Safety Analysis Covering Conversion of Nuclear Science Ctr Reactor to Low Enrichment U Fuel.Amend to SAR Will Be Submitted by 941231 ML20044D0221993-05-0707 May 1993 Responds to Emergency Planning Program Weaknesses Noted in Insp Rept 50-128/93-01.Corrective Actions:Addl Changes Made to Emergency Plan to Ensure Info Consistent W/Actual Events at Time of Declaration of Emergency Class ML20045H0321993-03-25025 March 1993 Forwards Proposed Amend 13 to License R-83,allowing Greater Flexibility Re Possession of Radioactive Matls for Supporting Research & Development Functions.Justification for Requested Amend Encl Also ML20126B2301992-12-0707 December 1992 Responds to Violations Noted in Insp Rept 50-128/92-02. Corrective Actions:Mgt Overview Program Database Created for Tracing Biennial,Annual & Semiannual Routes to Ensure Timely Completion & Limited Access Badge Documentation Upgraded ML20137Z0521992-10-23023 October 1992 Informs That Licensee Continues to Review Licensing Jurisdiction Situation W/Re to Radioactive Matl Used in & Around Texas A&M Univ Nuclear Science Ctr in College Station,Tx ML20115G6331992-08-28028 August 1992 Reviews Written Exam Administered at Faclity on 920824 & Found No Questions Causing Applicants Problems ML20096B9201992-04-27027 April 1992 Responds to NRC Re Violations Noted in Insp Rept 50-128/92-01.Corrective Actions:Amend to State of Tx License Requested ML20091R2031992-01-22022 January 1992 Comments on Listed Questions Re Operator Licensing Exam ML20070G8841991-03-0606 March 1991 Notifies That Federal Govt Funding Not Available for Conversion of NSCR from Use of HEU Fuel to LEU Fuel,Per 10CFR50-64,c,(2)(ii).Will Notify Commission by 920327 If Funds Have Been Made Available in FY92 for Conversion ML20058L5081990-07-24024 July 1990 Forwards Kr Hall Re Availability of Funds for Any Future Decommissioning of Nuclear Science Ctr Reactor, Per 10CFR50.33(k),for Filing ML20058L5161990-07-0909 July 1990 Advises That Request Will Be Made to State of Tx Legislature for Appropriation of Funds for Decommissioning & Decontamination of Nuclear Science Ctr Reactor After Future Decision for Final Shut Down Made ML20043E2581990-06-0404 June 1990 Forwards Proposed Change to Reactor Operator & Senior Reactor Operator Requalification Program.Proposed Change Makes Written Exams Administered to Operators on Physical Security Plan Part of Operator Requalification Program ML20043B1521990-05-11011 May 1990 Responds to Violations Noted in Insp Rept 50-128/90-01 on 900221-23.Corrective Actions:Program for Review of Users License Established & Responsibility for Radiation Protection Program Transferred to Licensee ML20012C5491990-03-0909 March 1990 Responds to Violation Noted in Insp Rept 50-128/90-01 on 900110-12.Corrective Actions:Emergency Preparedness & Physical Security Designated as Next Scheduled Operator Requalification Program Topic for Lecture ML20012A0671990-02-28028 February 1990 Advises That Federal Govt Funding Not Available for Conversion of Nuclear Science Ctr Triga Reactor from High Enriched U to Low Enriched U Fuel During FY90.Reactor Does Not Have Further Plans for Conversion in 1990 ML19327B2891989-10-24024 October 1989 Requests That Licensee on License R-83 Be Officially Designated as Texas Engineering Experiment Station,Texas A&M Univ Sys,Per 890904 License Amend Request ML19325C8391989-10-13013 October 1989 Forwards 801020 Ltr Documenting Change of Licensee for Nuclear Science Ctr Reactor,Agreement Ltr Re Occupational Safety Advice & Revised Tech Spec Page 46 ML20247F9171989-09-0808 September 1989 Forwards Addl Info Re Nuclear Science Ctr Reactor Organizational Structure.New Organizational Structure Will Improve Communications,Streamline Mgt Functions & Establish Responsive Radiation Protection Program ML20151V9311988-08-10010 August 1988 Requests Extension to 880901 Be Granted for Response Deadline to 880713 Notice of Violation & Proposed Imposition of Civil Penalty.Addl Time Needed to Obtain Final Approval & Signitures of Individuals Presently on Vacation ML20151Y8821988-07-28028 July 1988 Responds to Notice of Violation & Proposed Imposition of Civil Penalty on 880713 in Amount of $5,000.Corrective Actions:Dosimeters Issued to Current NSC Employees Reviewed & Updated ML20151H5171988-07-21021 July 1988 Forwards Payment in Amount of $5,000 for 880713 Order Imposing Civil Monetary Penalty ML20155C9201988-06-0707 June 1988 Forwards Minutes of Reactor Safety Board Subcommitee for Review of Nuclear Science Ctr Experiment & Radiological Control 880530 Meeting ML20155A7511988-05-10010 May 1988 Forwards Summary of Rsb Subcommittee for Review of NSC Experiments & Radiological Control 880520 Meeting ML20151U7551988-03-31031 March 1988 Forwards ORO-4207-20, Twenty-Fourth Progress Rept of Texas A&M Univ Nuclear Science Ctr,1987, Per Tech Spec 6.6.1 ML20196F0231988-02-23023 February 1988 Submits Info to Correct Addressed to Berkow Re Change in Adminstration of Nuclear Science Ctr Reactor. Effective Date for Change Is 880201 ML20149H0451988-02-0808 February 1988 Submits Change to Facility Emergency Preparedness Plan.Ref in Plan to Support Agreement W/St Joseph Hosp,Bryan,Tx to Be Replaced W/Support Agreement W/Humana Hosp,College Station, Tx 1999-09-07
[Table view] |
Text
.- - - -- - -- .. . - - - -
! TEX AS ENGIN E ERIN G EXPERIM ENT STATION l
{ TEXAS A&M UNIVERSITY COLLEGE STATION. TEXAS 77843-3575 1 l
iN I l L._ -!
l NUCLEAR SCIENCE CENTER 07 October 1994 409/845-7551 U.S. Nuclear Regulatory Commission 94-0301 ATTN: Document Control Desk ,
Washington, DC 20555 j i'
REFERENCE:
Facility License R-83, Docket 50-128
SUBJECT:
Changes to Emergency Preparedness Plan'
Dear Sir,
Attached is a revision of the Texas A&M University Nuclear Science Center (NSC) Emergency Preparedness Plan. The plan was ,
rewritten to correct weaknesses identified by a previous NRC l inspection at the facility (NRC inspection report 50-128/93-01) and several changes desired by the NSC staff.
The following specific changes were made:
- 1. The initiation of emergency actions will be based on I available air monitor readings and alarm setpoints. An alarm received on the fission gas monitor will become an NOUE.
- 2. Declaration of either a Notification of Unusual Event or an Alert will require informing the NRC within 15 minutes.
- 3. The TAMU Radiological Safety Office has been renamed the Office of Radiological Safety (ORS).
- 4. The NSC Health Physics Office has been renamed the Radiation Protection Office.
l l 5. The two Scott air packs will be removed to avoid their use j by non-certified personnel during an emergency. Only j l firemen trained in the use of the breathing apparatus will l i be required to enter the building.
- 6. Both area hospitals will be available for contaminated injured personnel.
- 7. There is not a permanent decontamination shower in the NSC !
lab building. A temporary shower will be available and ,
water will be collected for later disposal.
l
_Ig; ;. s . J I
RESEARCH AND DEVELOPMENT FOR MANKIND f 9410170052 941007 1
't I l . . . .
fDR ADOCK 05000128 PDR
l
, 94-0301 Page 2
- 8. Members.of the ORS are available for support during an emergency, but have not been trained on the NSC Emergency ,
Plan. On-call ORS staff will now be required to attend annual training on NSC emergency procedures.
These changes'are being submitted in accordance with 10CFR50.54(q). The changes were reviewed and approved by the NSC staff and the Reactor Safety Board (RSB) and were determined to not reduce.the effectiveness'of the plan. Final-approval of the changes was made'at the RSB meeting on August 25, 1994.
Please contact me if further information is needed at 409-845-7551 or fax at 409-862-2667. c j Respectfully submitted, i
/ :
I Sean O' Kelly .
Assistant Director xc: Samuel J. Collins, Director, USNRC i Chrono File File 242A SOK/ym
(
l l
l 1
)
l l
l l
t
(
i
- - < - = - -