ML20024D977
| ML20024D977 | |
| Person / Time | |
|---|---|
| Site: | 05000128 |
| Issue date: | 06/21/1983 |
| From: | Urbanik T TEXAS A&M UNIV., COLLEGE STATION, TX |
| To: | Robinson P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML20024D973 | List: |
| References | |
| NUDOCS 8308080657 | |
| Download: ML20024D977 (2) | |
Text
$
THE TEXAS A&M UNIVERSITY SYSTEM TEXAS TRANSPORTATION INSTITUTE
~
COLLEGE STATION TEXAS 77843-3135 TRANSPORT OPERATIONS PROC %M (713) g45.gs35 June 21, 1983 Perry D. Robinson Ed ~ / - O U.S. Nuclear Regulatory Commission Emergency Preparedness Branch Office of Inspection & Enforcement Washington, D.C.
20555
Dear Mr. Robinson:
A review of the Perry ETE dated July 1982 has been made using Appendix 4 of NUREG-0654, Revision 1.
As indicated on the attached summary, two defi-ciencies were noted.
The Summer Sunday evacuation time estimate does not include an adverse weather estimate. Although a summer peak scenario with adverse weather is a remote possibility, wet roads due to a summer thunderstorm is nevertheless possible.
It is, therefore, appropriate to have a Summer Sunday scenario con-sidering adverse weather (rain).
No reference in the report is made to having had the estimates reviewed by the appropriate state and local officials. A statement or reference to state / local review is necessary to remove the deficiency regarding state and local review.
If you have any questions, please call me at (409) 845-1535.
Sincerely,
^Q.
Thomas Urbanik II Assistant Research Engineer TV/kab I
l 8308080657 830729 PDR ADOCK 05000128 F
PDR TRANSPORTATION RESEARCH ANO DEVELOPMENT
6 EVALUATION OF EVACUATION TIME ESTIMATE Perry Item Adequate Deficient Poor None
=
I.
General A. Maps X
B. Report Format 1
II.
Demand Estimation A. Permanent Residents X
B. Transient Populations X
C. Special Facility Population X
D. EPZ Sub-areas X
III.
Traffic Capacity A. Evacuation Roadway Network X
B. Roadway Characteristics X
C. Adverse Weather Considered X
IV.
Analysis A. Assumptions X
B. Methodology X
C. Carless X
V.
Other Requirements A. Confirmation Time X
B. State and Local Review 1
VI.
Overall X
Date of Report: July, 1982 i
)
l
)