ML20153C979
| ML20153C979 | |
| Person / Time | |
|---|---|
| Site: | 05000128 |
| Issue date: | 09/22/1998 |
| From: | Weiss S NRC (Affiliation Not Assigned) |
| To: | Bill Russell TEXAS A&M UNIV., COLLEGE STATION, TX |
| References | |
| NUDOCS 9809240261 | |
| Download: ML20153C979 (1) | |
Text
.-
SEP 2 21998 EDocket No.'M128 Dr. B. Don Russell, Deputy Director Texas Engineering Experiment Station Texas A&M University System College Station, Texas 77843-3575 1
Dear Dr. Russell:
SUBJECT:
INITIAL RESULTS - TEXAS A&M UNIVERSITY Enclosed is a copy of the results of the Operator initial Examination conducted at Texas A&M University on September 14,1998.
Sincerely, (h
Seymour H. Weiss, Di,9ctor Non-Power Reactora and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation
Enclosures:
1.
Summary Sheet 2.
Candidate's Form 301N 3.
Candidate's Answer Sheets g% hd.C$T$ W7 Distribution: w/o encis. 2 & 3 HOHPILA Summary Sheet File (DMcCain)
Facility File (DMcCain)
Distribution: w/o encl i
UDocket Files C
l[3 SWeiss b
PDoyle
.PDR File Center
',, i,c*1
}py@nDRCH P@:DRPM D@:DRPM cCain:dm p RD~oyle f SWdiss 0931/98 f)B8 0 09/)/98 1
9809240261 990922 PDR ADOCK 05000128 V