ML20058L516

From kanterella
Jump to navigation Jump to search
Advises That Request Will Be Made to State of Tx Legislature for Appropriation of Funds for Decommissioning & Decontamination of Nuclear Science Ctr Reactor After Future Decision for Final Shut Down Made
ML20058L516
Person / Time
Site: 05000128
Issue date: 07/09/1990
From: Hall K
TEXAS A&M UNIV., COLLEGE STATION, TX
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20058L515 List:
References
NUDOCS 9008070267
Download: ML20058L516 (2)


Text

.. .. . .. . _ _ _ . .

  • T[ w,n s ,'

$ Texa E gineering Experiment station The Texa's At.M UrJvorsity systor.1 College station, Texas 77843 3577

  • 409/8451321
ggy July 9,1990

@ $0 L

.juL 2 T l930 h Document Con.rol Desk -

W w

~

U.S. NLclear Regulatory Commission i

~~

Washington, 0.0. 20555

Reference:

Docket No. 50-128-Facility License No. D-83

Subject:

Availability of Funds for Future Decommissioning of the Nuclear Science Center Reactor as Per the Reporting Requirements. of .10CFRSO.33(k)

Gentlemen:

Certification is herewith given by the Texas- Engineering Experiment-Station ILicensee) that a request will'be- made to the State of Texas Legislature for the appropriation of funds forthe decommissioning and decontamination of the Nuclear Science Center Reactor. (NSCR) once a future decision for final shutdown is made. The cost estimate for decommissioning the NSCR in FY-90' dollars is 4.3 rnillion. This estimate is based on a cost study for decommissioning.the Washin0 ton State University reactor facility conducted by the Westinghouse Electric Corporation in February 1988. The cost estimate for the 1 MW TRIGA WSU reactor was 3.842 million FY-88 dollars. This figure has been adjusted

Upward for the NSCR due to a significant difference in building structures

~for, the, two facilities. It will be necessary to shore up the NSCR-building structure prior to the removal of any reactor pool shielding as all floor levels of the facility are tied to the concrete pool wall structure. The estimated ' decommissioning figure of 4.3 million FY-90 dollars for the s~

9008c70267 900724 PDC ADOCK 05000128 I PDC

[ 90- //If ' m

y i I

Document Control Desk-USNRC July . 9,1990 Page 2 NSCR will in future years require adjustment to account for increased inflation costs and uncertain increases in other cost factors.

Sincerely, Kenneth R. Hall, Deputy Director Texas Engineering Experiment Station xc: Dr. H.H. Richardson, Director, TEES Dr. K.L. Peddicord, Assistant Director, TEES Mr. F.- Jennings, Chairman, Reactor Safety Board' Mr. T. Michaels, Project Manager, USNRC, Washington, D.C.

Mr. D.E. Feltz, Director, Nuclear Science Center Sworn to before me the undersigned authority this Y day of .

1990.

)* Notan Public, state of Texas 4 y$ & hsk"

.(;;.3.,,,p w comw.icainw e i m 7 Notary Public

_ - - - - - - - - - - - - - - - " In and For Brazos County, Texas Commission expires /4-f-fd