Forwards Revised Tech Spec Pages of 880705 Application for Amend to License DPR-6 Re Partial Stroke Testing Following Main Valve Seat Leakage Repairs,Per NRC Request
ML20207L189
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 10/10/1988
From: Marbaugh K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20204F836 List:
References
NUDOCS 8810170221
Download: ML20207L189 (2)


Text

--

3

e. .e -<

I I

Consumens i POVrer powsmus

~ MKJNMN3 MISERE55 oeneral offices: 1945 West Parnell Road, Jackson, MI 49201 .(517) 788 0550 October. 10, 1988 f

Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT -

RESPONSE TO VERBAL REQUEST FOR ADDITIONAL INFORMATION ON TECHNICAL SPECIFICATION CHANGE REQUEST - RDS SURVEILLANCE TESTING AND RDS RELIEF REQUESTS NRC Staff review of Consumers Power Company submittal dated July 5, 1988 requested additional information to resolve reviewer comments on the wording and placement of certain sections. These comments were discussed with appropriate plant staff. This letter provides Consumers Power Company acceptance of the NRC Staff's suggestions for revision, as discussed below.

In addition to the changes identified for the originally submitted Technical Specification pages, a review of the July 5 submittal has disclosed several other changes necessary to properly document the agreements reached, including page changes for the Bases section and others.

'The Technical Specification Change Request submitted by the July 5 letter concerned elimination of quarterly partial stroke testing of the RDS depressurizing valves, to be' replaced by full stroke exercising at each refueling outage. NRC Staff recommended that proposed item (d.) of the ACTION statements (11.3.1.5) be slightly reworded and moved to become item (d.) of the SURVEILLANCE REQUIRENENTS (11.4.1.5). It was also recommended that proposed item (e.) of the ACTION statements (11.3.1.5), concerning partial otroke testing following main valve reat leakage repairs, be

-deleted. Plant staff review of these suggestions has concluded that the changes proposed are acceptable and should be made.

Attached are the appropriate revised pages which replace the same pages of Consumers Power Company submittal dated July 5, 1988. Places where changes have been made are indicated by a slash (/) in the margin.

HJ0170221 881010 PDR ADOCK 03000155 @l P pm

  1. I OC1088-0163-NLO4 i

Nuclear Regulatory Commission 2 Big Rock Point Plant Add'1 Info - RDS TSCR October 10, 1988 Consumers Power Company may, at some future time, consider revisiting the issue of partial stroke testing as an appropriate means of verifying main depressurizing valve operability, even though that item is being deleted from this Technical Specification Change Request at the request of NRC ataff, 84w Kenneth E Harbaugh Plant Licensing Engineer CC Administrator, Region III, NRC NRC Resident Inspector - Big Rock Point Attachment i