ML20203D628

From kanterella
Revision as of 15:41, 14 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Special Rept:While Venting Reactor Vessel Head,Operator Noticed That RCS Low.Operator Increased Letdown Flow to Decrease Nc Sys Pressure.Porv Actuated for 2 S.Operator Counseled to Pay Attention to Parameters During Evolutions
ML20203D628
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 04/09/1986
From: Tucker H
DUKE POWER CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8604220221
Download: ML20203D628 (2)


Text