Forwards Safety Evaluation Supporting Util Submittal Re Compliance W/Atws Rule 10CFR50.62 Concerning Alternate Rod Injection & Recirculation Pump Trip Sys.Design Does Not Meet Requirements of ATWS Rule & Not Acceptable
ML20205P523
Person / Time
Site: Oyster Creek
Issue date: 11/04/1988
From: Dromerick A
Office of Nuclear Reactor Regulation
To: Fitzpatrick E
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20205P526 List:
References
TAC-59122, TAC-66126, NUDOCS 8811080195
Download: ML20205P523 (3)


Text

r

. N0'l 04.1533 o

Docket No. 50-219 DISTRIBUTION

, Docket FfTe" ADronerick Mr. E. E. Fitzpatrici: NRC & Local PDRs OGC(info.cnly)

Vice President and Cirector SVarga EJordan Oyster Creek Nuclear Generating Station BBoger PGrfres Post Office Box 3C8 SNorris ACRS(10) forked River, New Jersey C8731 Gray File Cear Mr. Fitzpatrick:

SUBJECT:

SAFE 1Y EVALUATION ON OYSTER CkEEK h0 CLEAR GENERATlhG STATION C0MPLIANCE WITH ATWS RULE 10 CFR 50.62 RELATING 10 ARI AND RPT SYSTEMS (TAC h05. 59122 AhD 66126)

The ATWS Fule (10 CPt $0.62. Re Transients Without Scram (ATWS)quittnents for Feduction ofNuclear Events for Light-Water-Cooled Risk frcm Anticipated Power Plants) requires inprovenents in the design and creration of concercial nuclear peker facilities to reduce the Iflelihecd of failure to shutdown the reactor folicwing anticipated transients, and to mitigate the consequences of an ATWS event. The requirenents for a boiling water reactor are to install an alternate rod injec-ticrLIARI) systtm, a stardby itquid control system (SLCS) and to trip the reactor cholant recirculation pupps autom atically under conditions indicative of an ATUS.

CPU Nuclear Corporation (CPUN/ licensee) provided infor1 nation by letters dated Septer;ter 3,1987. Pecember 30, 1987 and April 79, 1988 concerning their imple-pentation of the ATWS Pule. The staff and the Science Applications Interna-tional Corporation, cur consultant, have reviewed these sutrittals. Fased on this review, we have concluded that the ARI design dces not rcet the' diversity requircrents of the ATES Rule and, as a result, is rot acceptable. Fewever, we do not believe that the issues related to this ncnacceptance are of sufficient safety significance to delay irplettentation of the ARI system or replace equip-nent already installed. In order to corply with the ATWS Fule, the licenste shall provide an ARI system with instrument ccepcments that ate diverse frce the reactor trip system before restart following the next refueling cutage (Refueling Outage 13P). You are also required to rerfeit a preoperational test to serify thtt the actual ARI function time is within the design 11mit. GPUN is also required to provide equiprent technical specifications including opetebility and surstillance requirerents. The staff will providt guidance on technical specification requiretrentr for the ATWS/RPT system in a separate docueent . Our Safety Evaluation (SE), which provides the review details regaiding this cor clusion, is encitaed.

Based on the above, we request that )cu dccurent your intent legarding reeting cur requirements related to (1) dinersity and preoperaticnal testing of the ARI System ard (2) technical specification requirerents for the ATWS/RPT systec's.

0011000195 081104 A POR ADOCK 05000219 F P PNV

Mr. E.E. Fitzpatrick The reporting and/or recordkeeping requirerents contained in this letter af'ect fewer than ten respondents; therefore, CMB clearance is not rcquired under P.L.97-511.

Sincerely.

Alexander W. Crccerick, Project Panager Project Directorate I-4 Division of Reactor Projects ! I!

Office of W.lcar Reactor Fegu[iatien

Enclosure:

As stated cc w/ enclosure:

See next page 1

FF,:PD14h LA:PDI-4s( Arrin,efick:bd D:PDI-4pp[ ,

!?l orris ;*

'!,05tolz 10/y/f8 Ik/ I/E8 1(/ 'J /E8

//  !

i

.. 1

, Mr. E. E. Fitzpatrick Oyster Creek Nuclear Oyster Creek Nuclear Generating Station Generating Station g

cc:

Ernest L. Blake, Jr. Resident Inspector Shaw, fittman, Potts and Trowbridge c/o U.S. HRC 2300 N Street, NW Post Office Box 445 Washington, D.C. 20037 Forks i ' liver, New Jersey 08731 J.B. Liberman, Esquire Comissioner Bishop, i.iberman, Cook, et el Hen Jersey Departnant of Energy 1155 Avenue of the America' 101 Comerce Street New York, New York 100' Newark, New Jersey 07102 Jennifer Moon, Acting Chief Regional Administrator, Region 1 New Jersey Department of Environmental U.S. Nuclear Regulatory Commission Protection 475 Allendale Road Bureau of Nuclear Engineering King of Prussia, Pennsylvania 19406 CN 415 Trenton, New Jersey 08625 BWR Licensing Manager GPU Nucle 6r Corporation i Upper Pond Road Parsippany, New Jersey 07054 Deputy Attorney General State of New Jersey ,

Department of Law and Public Safety 36 West State Street - CH 112 Trenton, New Jersey Oco25 Mayor Lacey Township 818 M t Lacey Road Fro m River, New Jersey 08731 Licensing Marager Oyster Creek Nuclear Generating Station Mail Stop: Site Emergency Bldg.

P. O. Box 388 Forked River, New Jersey 08731 t

y

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ - _ - - - -