05000254/LER-1997-022, Forwards LER 97-022-00,per 10CFR50.73(a)(2)(v)(D).Commitment Stating That Qcos 5750-04 Will Be Enhanced by Adding Precautions for Opening of Bypass Valve & Verification That Relief Valve Has Not Lifted & Failed to Reseat,Listed

From kanterella
Revision as of 04:00, 20 November 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 97-022-00,per 10CFR50.73(a)(2)(v)(D).Commitment Stating That Qcos 5750-04 Will Be Enhanced by Adding Precautions for Opening of Bypass Valve & Verification That Relief Valve Has Not Lifted & Failed to Reseat,Listed
ML20199B316
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 11/12/1997
From: Cook D
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20199B318 List:
References
SM-97-106, NUDOCS 9711180268
Download: ML20199B316 (1)


LER-2097-022, Forwards LER 97-022-00,per 10CFR50.73(a)(2)(v)(D).Commitment Stating That Qcos 5750-04 Will Be Enhanced by Adding Precautions for Opening of Bypass Valve & Verification That Relief Valve Has Not Lifted & Failed to Reseat,Listed
Event date:
Report date:
2542097022R00 - NRC Website

text

.

SM-97-106 November 12, 1997 United States Nuclear Regulatory Commission Washington, DC 20555 Attention: Document Control Desk

Reference:

Quad Cities Nuclear Power Station Docket Number 50-254, DPR-29, Unit One Enclosed is Licensee Event Report (LER)97-022, Revision 00, for Quad Cities Nuclear Power Station.

This report is submitted in accordance with the requirements of the Code of Federal Regulations, Title 10, Part 50.73(a)(2)(v)(D). The licensee shall report any event or condition tht alone could have prevented the fulfillment of the safety function of structures or systems that are needed to mitigate the consequences of an accident.

The following commitment is being made by this letter:

- QCOS 5750-04 will be enhanced by adding precautions for the opening of the bypass valve and verification that the relief valve has not lifted and failed to reseat. Due by 120197 If there are any questions or comments concernina this letter, please refer them to Charles Peterson, Regulatory Affai., Manager at 309-654-2241, ext. 3609.

Respectfully, COMMONWEALTH EDISON QUAD CITIES NUCLEAR POWER STATION h.d.ddd D. B. Cook Station Manager DBC/CP/plm Encion e cc: A. B. Beach, Regional Administrator, Region III R. M. Pulsifer, Project Mar.ager, NRR pV r]V C. G. Miller, Senior Resident Inspector, Quad Cities W. D. Leech, MidAmerican Energy Company (

D. C. Tubbs, MidAmerican Energy Company l M. E. Wagner, Licensing, Comed E F. A. Spangenberg, Regulatory Affairs Manager, Dresden ) l INP0 Records Center i STMOR\LFE0W ]

9711190268 971112