Forwards LER 99-001-00 for Quad Cities Nuclear Power Station.Licensee Shall Rept Any Operation or Condition Prohibited by Plant Tech Specs.Util Committing to Listed Actions
ML20206R428
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 05/12/1999
From: Dimmette J
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20206R434 List:
References
SVP-99-097, SVP-99-97, NUDOCS 9905200113
Download: ML20206R428 (2)


LER-1999-001, Forwards LER 99-001-00 for Quad Cities Nuclear Power Station.Licensee Shall Rept Any Operation or Condition Prohibited by Plant Tech Specs.Util Committing to Listed Actions
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications
2541999001R00 - NRC Website

text

_

a.

Osmmonwcalth IMison Company Qu$d Citics Gener.iting $tation 22710 206th Ascouc North O >rdova, ll. 61212N70 Tel Sm.su21i SVP 99-097 May 12,1999 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Quad Cities Nuclear Power Station, Unit 1 Facility Operating License No. DPR-29 ILRC Docket No. 50-254 Enclosed is Licensee Event Report (LER) 254/99-001, Revision 00, for Quad Cities Nuclear Power Station.

This report is submitted in accordance with the requirements of the Code of Federal Regulations, Title 10, Part 50.73(a)(2)(i)(B). The licensee shall report any operation or condition prohibited by the Plant's Technical Specifications.

We are committing to the following actions:

1. A revision to Updated Final Safety Analysis Report (UFSAR) Table 6.2-7 will be submitted 1o ensure the penetrations are properly identified by June 17,1999.
2. Awareness training on the lessons learned from this event will be conducted for on-site Independent Technical Review (ITR) qualified personnel by July 23,1999.
3. Piping and Instrumentation Diagram (P&lD) M-24 sheet 13 will be revised to include the three Unit 1 spare valves on Penetration X-106B by October 12,1999.

Any other actions described in the submittal represent intended or planned actions by Commonwealth Edison (Comed) Company. They are described for the NRC's information and are not regulatory commitments.

?

/ g k+

4 9905200113 990512 PDR ADOCK 05000254 1

S PDR J

l l

- c.

May 12,1999 U. S. Nuclear Regulatory Commission Page 2 Should you have any questions concerning this letter, please contact Mr. Wally J. Beck, Acting Regulatory Assurance Manager at 309-654-2241, ext. 3100.

Resp

ully, J

l P. Dimmette, Jr.

. S.ite Vice President Quad Cities Nuclear Power Station Enclosure cc: