05000254/LER-1998-001, Informs of Change of Committed Due Date Re Rev to Logic Test Procedures as Stated in LER 98-001,dtd 980202.Due Date Is Now 980626 to Allow Station Necessary Time to Perform Appropriate Addl Reviews of Revised Procedures

From kanterella
(Redirected from 05000254/LER-1998-001)
Jump to navigation Jump to search
Informs of Change of Committed Due Date Re Rev to Logic Test Procedures as Stated in LER 98-001,dtd 980202.Due Date Is Now 980626 to Allow Station Necessary Time to Perform Appropriate Addl Reviews of Revised Procedures
ML20217E824
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 03/20/1998
From: Sager D
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
SVP-98-105, NUDOCS 9803310171
Download: ML20217E824 (2)


LER-2098-001, Informs of Change of Committed Due Date Re Rev to Logic Test Procedures as Stated in LER 98-001,dtd 980202.Due Date Is Now 980626 to Allow Station Necessary Time to Perform Appropriate Addl Reviews of Revised Procedures
Event date:
Report date:
2542098001R00 - NRC Website

text

I

  • a.Commonacalth 1.dmin Comjuny

.[

, , Qu.nl Citir$ 6enerating Station

- 22710 206th Asenue North Confou, il fil 2426r710 Tel MPM54 2241 SVP-98-105 March 20,1998 U. S. Nuclear Regulatory Commission Washington, D. C 20555 Attention: Document Control Desk

Subject:

Quad Cities Nuclear Power Station Unit 1 Change of Commitment Date NRC Docket Numbers 50-254. DPR-29

Reference:

(a) E. S. K.ran, Jr., (Comed) letter (SVP-98-029) to USNRC, dated February 2,1998 The purpose of this letter is to inform you of the change of a committed due date contained in Licensee Event Report 254/98-001, reference (a).

In this report, the station made the following commitment:

Logic Test procedures will be revised by 032798 to add and sequence steps such that inadvertent actuations are prevented.

(Engineering, NTS 25418098SCAQ0000106)

The station is changing the due date of this item to 062698. The completion of the review and revision of Logic Test Procedures cannot be met until this time. This change will allow the station the necessary time to perform appropriate additional reviews of revised procedures before performing the test. Due to work prioritization and back-log tests not required to be completed prior to Unit start-up will be completed afler Unit start-up. All test procedures will be revised and reviewed prior to the procedure being performed.

,. y A, (-[G g ja ,

9003310171 980320 PDR ADOCK 05000254 h S PDR A Unicom com;uny '

Li

y.

-USNRC--

SVP-98-1051 March 20,1998 If you have any questions concerning this letter, please contact Mr. Charles Peterson, Regulatory Affairs Manager, at (309) 654-2241, extension 3609.

Respectfully, David 'ager Site Vi President Quad Cities Station cc: A. B. Beach, Regional Administrator, Region III R. M. Pulsifer, Project Manager, NRR C. G, Miller, Senior Resident Inspector, Quad Cities W. D. Leech, MidAmerican Energy Company D. C. Tubbs, MidAmerican Energy Company F. A. Spangenberg, Regulatory Affairs Manager, Dresden INPO Records Center Office of Nuclear Facility Safety, IDNS DCD License (both electronic and hard copies)