Forwards Addl Info Responding to NRC Reguest Re Util 861014 Screenhouse Fire Protection Exemption Request,Including Rev 137 to Vol 3 of Emergency Procedure Emp 3.10, Fires, Svc Water Pump Motor Drawings & Instruction Manual
ML20149M513
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 02/22/1988
From: Frisch R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20149M515 List:
References
NUDOCS 8802260087
Download: ML20149M513 (2)


Text

1 I Consumers

@pavsens power MENIGAN's PRDGRES$i oeneral officos: 1945 West Pern611 Road, Jackson MI 49201 . (517) 788 0550 February 22, 1988 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT -

SCREENHOUSE FIRE PROTECTION ETFMPTION - RESPONSE TO VERBAL REQUEST FOR ADDITIONAL INFORMATION Consumers Power Company was verbally requested by the Big Rock Point Acting NRC Project Manager to provide additional information regarding our Screenhouse Fire Protection Exemption Request dated October 14, 1986. The ,

additional information is needed to allow continued NRC review of our request.

The specific additional information requested was:

1. Copy of procedure used to effect replacement of the Service Water Pump motor.
2. Copy of procedure used to effect ccnnection of temporary hose for air compressor _ cooling.
3. More detailed information, if available, on time required to change out motor including information on motor size.
4. More detailed information on the extent of cable replacement required should the Service Water Pump motors be damaged by a fire.

Our response to this request follow. l Emergency procedure EMP 3.10 (Attachment 1) covers plant response to fires.

Appendix 1 of EMP 3.10 contains the contingency actions necessary to reach cold shutdown. Sections I-1.3 and 1.4 of this Appendix provide the direction for connecting a Service Water Pump to the Emergency Diesel Generator assuming a loss of normal power. Appendix IV provides additional safe-shutdown direction after severe screenhouse fires which require replacement of the Service Water Pump motor, and connection of the temporary demineralized water hose for air compressor cooling.

8902260087 880222 8

{DR ADOCK 05000155 PDR (k

.OC0288-0048-NLO4

i e 2

The spare motor is stored in the stockroom which is located approximately 300 yards from the screenhouse. Attachment 2 is a motor outline drawing. The-motor is approximately 24" in diameter and 40" long and weighs approximately 800 lbs. As discussed in the October 14, 1986 Exemption Request .the motor can be transported to the screenhouse via crane truck, forklift, or pickup truck.

Vendor instructions-(Attachment 3) are used for Service Water Pump motor removal and installation. Maintenance personnel receive skills _ training in precision measurement / coupling alignment along with motor repair and installa& ion. Following motor replacement, direction in EMP 3.10, Appendix I is used to connect the cables from the Emergency Diesel Generator to the motor if required. ,

Overhaul of the No. 1 Service Water Pump was completed in February,1987.

Complete pump removal including motor disassembly was completed in approxi-mately eight hours and reinstallation in approximately nine hours by three repairmen. Three repairmen can remove, replace, and align the spare motor within five to six hours. Spare cable hookup > if necessary, can be completed in less than one hour. The spare cable (3 conductor, #2 AWG) is stored in the Emergency Diesel Generator room and is approximately 160 feet long. The shortest distance from the motor controllers in the Emergency Diesel Generator room to the Service Water Pumps is approximately 70 feet. The spare cable has been installed and both Service Water Pumps have been trial run with the spare cable.

All of these repairs can be completed well within the required 36 hour4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> time period discussed in the Exemption Request. Additional fire protection program supporting information has been provided in the Fire Protection Hazards  ;

Summary document submitted by our letter dated February 27, 1987. j s

i S M k-Ralph R Frisch Senior Licensing Analyst CC Administrator, Region III, NRC NRC Resident Inspector - Big Rock Point Plant Attachments OC0288-0048-NLO4