ML20151T706

From kanterella
Revision as of 20:52, 24 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-219/85-38 on 851202-860105.No Violations Noted.Ack June 1986 Commitment to Complete Corrective Actions Re Concerns Raised in Insp Rept 50-219/84-09
ML20151T706
Person / Time
Site: Oyster Creek
Issue date: 02/04/1986
From: Kister H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Fiedler P
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20151T709 List:
References
NUDOCS 8602100341
Download: ML20151T706 (2)


See also: IR 05000219/1985038

Text

D:d ' '.~

-

.

4

.

FEB 4 1986

Docket No: 50-219

License No: DPR-16

GPU Nuclear Corporation

ATTN: Mr. P. B. Fiedler

Vice President and Director

Oyster Creek Nuclear Generating Station

P. O. Box 388

Forked River, New Jersey 08731

Gentlemen:

Subject: Inspection Report No. 50-219/85-38

-

This refers to the routine resident safety inspection by Messrs. W. Bateman,

J. Wechselberger and R. Urban from December 2,1985 to January 5,1986 at the

Oyster Creek Nuclear Generating Station. The inspection consisted of document

- reviews, interviews, and observations of activities as~ documented in the

enclosed inspection report. The findings were discussed with you and other

members of your staff at the conclusion of the inspection.

Within the scope of this inspection, no violations were identified.

This letter acknowledges a change in your commitment date to complete corrective

action to address a concern raised in Inspection Report 84-09 involving failure

to specify angular tolerance criteria for pipe support installations. During

this report period, you informed us that you need an additional six months,

beyond your previous commitment of December 1985, to complete work on the design

standards. This is the third revision of the original March 1, 1985 commitment

date. We accept your new date of June 1986, but do not anticipate granting

additional extensions.

Your cooperation with us in these matters is appreciated.

Sincerely,

--

Oristual S1 0ed

6 Byg

kk Nk k9

0 Harry B. Kister, Chief

Projects Branch No. I

Division of Reactor Projects

Enclosure: NRC Region I Report No. 50-219/85-38

0FFICIAL RECORD COPY IR OYC 85-38 - 0001.0.0

01/27/86 Z E O I

1

< 4

- .

,

cc'w/ enc 1:

BWR Licensing Manager

Licensing-Manager, Oyster Creek

Public Document Room (PDR)

Local Public Document Room (LPDR)

-Nuclear Safety-Information Center (NSIC)

NRC-Resident Inspector

State of New Jersey

bec'w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA

DRP Section Chief

DRS-Director

DRSS Director

t-

.

I

RI:DRP. l.: RP

Bgh/mjd Kister

1/ar/86 1$/86 {

OFFICIAL RECORD COPY IR OYC 85-38 - 0002.0.0

01/27/86

4

4