ML20151Z475

From kanterella
Revision as of 08:59, 24 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Revised Monthly Operating Repts for Sept 1987 for Browns Ferry Nuclear Plant
ML20151Z475
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 09/30/1987
From: Crawford J, Ratliff S
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20151Z364 List:
References
NUDOCS 8808290339
Download: ML20151Z475 (3)


Text

.- =

OPERATING DATA REPORT DOCKET NO. 50-259 DATE SEPTEMBER 87, PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 OPERATING STATUS

1. Unit Name: BROWNS FERRY UNIT ONE
2. Reporting period: SEPTEMBER, 1987
3. Licensed Thermal Power (MWt): 3293 4 Nameplate Rating (Gross MWe): 1152
5. Design Electric Rating (Net MWe): 1065
6. Maximum Dependable Capacity (Gross MWe): 1098.4
7. Maximum Dependable Capacity (Net MWe): 1065
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
9. Power Level To which Restricted, If Any (Net MWe): N/A
10. Reacon For Restrictions, If Any: N/A THIS YEAR-TO MONTH DATE CUMULATIVE
11. Hours In Reporting Period 720.0 6551 115471
12. Hours Reactor Was Critical 0.0 0 59521
13. Reactor Reserve Shutdown Hours 0.0 0 6997 14 Hours Generator On Line 0.0 0 58267
15. Unit Reserve Shutdown Hours 0.0 0 0
16. Gross Thermal Generation (MWh) 0.0 0 168066787
17. Gross Electric Generation (MWh) 0.0 0 5E398130
  • 18. Net Electric Generation (MWh) -1570.0 -25578 52686042
19. Unit Service Factor 0.0 0.0 50.46
20. Unit Availability Factor 0.0 0.0 50.46
21. Unit Capacity Factor (MDC Net) 0.0 0.0 43.66 #
22. Unit Capacity Factor (DER Net) 0.0 0.0 43.66
23. Unit Forced Outage Rate 100.0 100.0 39.78 24 Shutdowns Scheduled Over Next 6 Month (Type, Date, and Duration of Each):
25. If Shut Down At End Of Reporting Period, Estimated Date Of Startup: '
  • Revision B9082903399%pgh59 PDR ADOCK O R

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-259 Unit one DATE 10-01-87 COMPLETED BY J.D. Crawford TELEPHONE (205)729-2507 MONTH September 1987*

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 -2 17 -3 2 -2 18 -1 3 -3 19 -2 4 -2 20 -3 5 -2 21 -3 6 -2 22 -2 7 -2 23 -2 8 -2 24 -1 9 -3 __

25 -2 10 -2 26 -2 11 -2 27 -2 12 -3 28 -3 I? -2 29 -3 14 -2 30 -3 15 -2 31 i

16 -3 INSTRUCTIONS On this format, list the averaEe daily unit power level in MWe-Net for each day in the reportinE month. Compute to the nearest whole moEawatt.

  • Complete Revision (9/77)

.. r tv.s iss c tona4.eu NUCLEAR PLANT OPERATING STATISTICS Browns Ferry Nuclear Plant Period Hours 720 Month Sontember 19 87 Item No. Unit No. Unit 1 Unie 2 Unit 3 Plant 1 Averace Houriv Gross load kW 0 0 0 0

_2 Maximurn Hour Net Generation. MWh 0 0 0 0 3 C' ore Thermal Energy Gen, GWD (tl2 0 0 __ 0 0 4 Steam Gen. Thermal Energy Gen.. GWD (t)2

,j 5 Gross Efectrical Gen., MWh 0 0" 0 o g 6 Station Use, MWh

_ 1170

  • 483f 4295 10.700* .

g 7 Net Electrical Gen., MWh -4835 -4295 -10760*

-1570 *

,o 8 Station Use, Percent 0 0 0 0 i

~'~

Accum. Core Avg. Exposure. MWD / Ton 1

~

9 0 0' 0 0

~'

10 CTEG 'This Month 106 BTU 0 0 0 0'~

11 SGTEG This Month, IO 6BTU 0

~

13 Hours Reactor Was Critical 0 0 0 14 Unit Use, Hours. Min. 0 0 0 0 15 Capacity Factor, Percent 0 1 0 0 2 16 Turbine Avail. Factor. Pereent 0 0 100 33.3 17 Generator Avail. Factor. Percent 0 0 100 33.3 e 18 Turt ocen, Avail. Factor. Percent 0 0 100 33.3

$ 19 Reseter Avail. Factor. Percent 0 0 100 33.3 2 20 Unit Avaii. raeter. Percent 0 _

0 0 0 21 Turbine Startues 0 0 0 0 J Reactor Cold Startues 0 0 0 0 n

> 24 Gross Heat Rate, Btu /kWh 0 0 0 0 f 25 Net Heat Rate, Blu/kWh 0 0 0 0 3 26 C 27 g 28 Throttle Pressure, psig 0 0 0 0 ct 29 Throttle Temperature. *F 0 0 0 0 y 30 Exhaust Pressure, InHg Abs. 0 0 0 0 E 31 Intake Water Temo., *F 0 0 0 0

__- 32 33 Main Feedwater, M lb/hr i 34

  • 8$ 35 -

36 37 Full Power Capacity, EFPo (3) 4 4 4 38 Accum. Cycle Full Power Days, EFPD 4 4 4 j 39 Oil Fired for Generation, Gallons

'3802 e 2 _. 40 Olf Heatino Value_ Btu / Gal. 139,400

_ 41 Diestt Generation. MWh 25.2 o

Max. Hour Net Gen.

~

Max. Day Net Gen. '

l.oJ d MWh Time Date MWh Date Factor, %

2 43 0 0 0 Q Remarks: IFor BFNP this value is MWD /STU and for SONP and WBNP this value is MWD /MTU.

~

l 2(t) indicates Therre.1 Energy, 3

(3)'Information furnished by Reactor Analysis Group. Chattanooga (4) Administrative hold -

n .n A II I flu

  • Revision '

DJte Submitted Date Revise <1 #

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _