ML20151Z400

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Repts for June 1988 for Browns Ferry Nuclear Plant
ML20151Z400
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 06/30/1988
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20151Z364 List:
References
NUDOCS 8808290317
Download: ML20151Z400 (2)


Text

.

LIEUID RADWACTE MONTHLY OPERATINO REPORT JUNE 1988 FLOW RATE (GPM)

DATA PLOTTE R HE P E 12 MONTHS TOTAL RELEASE (CI) 40.

2 RATE (GPM)_

HI 27.10 30 -

LOW 11.62 AVG 19.74 20.

1 TOTAL n

nFt FARF lET)

HI 0.05 LOW 0.01 10.

AVG 0.02 O FLOWRATE b.P bCT NOV EC JAN kB JUL AUG AR APR AY VUN

_THAOUGHPUT fG Af R1 FILTER THROUGHPUTS "5W 8.'!!N!e A

AVG 0.12E+07 FLOOR DRAIN 3

HI 0.89E+0S LOW 0.49E+0S IIl-l-I-IHI AVG 0.75E+06 2

LAUNDRY E

0.13E+05 LOW 0.00E+00 AVG 0.62E+04 g

0 JUL AUG SEP OCT NOV DEC VAN FEB MAR APR MAY JUN COST OF OPERATION enend "Jfencuns)-

THOUSAN OF DOLLARS WASTE HI 0.59E+05-90 -

LOW 0.19E+05 80.

AVG 0.3BE+05 4

70 -

FLOOR DRAIN n

.. l.

~..l,.

HI 0.10E+03 i

HI 0.45E+05

~

LOW 0.21E+05 50.

j AVG 0.31E+05

  1. 0
  • LAUNDRY 30 LOW 0.00E+00 20.

AVG 0.47E+02 10.

1 JUL AUG SEP OCT NOV DEC VAN FES MAR APR MAY JUN WASTE COLLECTOR SYSTEM LAUNDRY SYSTEM FLOOR ORAIN SYSTEM STARTING 3-87 COSTS INCLUDE RESIN DISPOSAL cREVISION: To be added to June 1988 report.

8808290317 080815 DR ADDCK 050 9

REACTOR POWER - MWT UNITS 1, 2 AND 3 JUNE 1988 MWT 3000 3000 I

UNIT 1: OUTAGE 2000 UNIT 2: OUTAGE UNIT 3: OUTAGE g,

1000 500 0*****%*h**Rs%QQ%4#44@@@&Q4544444 Cheelstry SectJon DAYS Technical Services Woms Ferry httclear Plant REACTOR WATER CONDUCTIVITY UNITS 1, 2,

AND 3 JUNE 1988 UNH0/CM g,73 CO 2VCTIVITY UNIT 1 1.5 1.25 CONDUCTIVITY UNIT 2 g............................................................

0.75

~

0.5 0*N EXPECTED RANGE COLD SHUTDOWN 0**%9*D*^**@@4O4@#4@@@@@@Y@$4$@S ACTION I LIMIT Chealstry Section DAYS COLD snuTOOwn TCchnical Services Wowns Ferry httclear Plant REACTOR WATER CHLORIDE UNITS 1, 2,

AND 3 JUNE 1988 PPB 50...............................................................

CHLORIDE UNIT 1 40 r

CHLORIDE 30 UNIT 2 20 CHLORIDE

. UNIT 3 to EXPECTED RANGE 0

.ALL Com!TIONS

  • %%%>%*h**44&O44444444QQ4554544

~~'

chemistry Section DAYS Technical Services Woms Ferry hticlear Plant OREVISION To be added to June 1988 Report.