, IU.A.
Tennessee Valley Authority, Post Office Box 2000, Docutur, Alabama 35609-2000 November 13, 1998 i
v
?
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of ) Docket Nos. 50-259 Tennessee Valley Authority ) 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - OCTOBER 1998 MONTHLY OPERATING REPORT The enclosure provides the October 1998 Monthly Operating Report as required by BFN Technical Specifications Section 5.6.4. ;
. i If you have any questions concerning this matter, please call ,j me at (256) ' '9-2636.
Sincerely,
/ -
y (;
\b -
T. E. Abney '
Manager of ensin j ,. 2-and Ind stry Affa rs Enclosure cc: See page 9811F'30200 9810314:
PDR-R ADOCK 0500025V PDR3 n.- -.
?.
i 1
U.S. Nuclear Regulatory Commission- r Page 2
.Notrember 13, 1998 i
Enclosure !
cc (Enclosure): ,
Mr. Harold O. Christensen, Branch Chief U.S. Nuclear Regulatory Commission Region II 61 Forsyth Street, S.W.
Suite 23T85 Atlanta, Geo'rgia'30303 Mr. Frederick J. Hebdon, Director .
Project Directorate II-4 :
Division of Reactor Projects I-II ,
Office of Nuclear Reactor 1 Regulation, Mail 13 H3' Washington, D.C. 20555 i INPO Records Center-Institute of Nuclear Power Operations ;
- 700 Galleria-Parkway
' Atlanta, Georgia 30339-5957 Mr. James Lang, Manager.
Advanced Reactor Department Electric Power.Research-Institute 3340 Hillview Avenue:
'Palo Alto, California 94304 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611 Regional Administrator l
- U.S. Nuclear Regulatory Commission Region II ;
61 Forsyth Street, S.W.
Suite 23T85 Atlanta, Georgia 30303-I Ms.. Barbara Lewis McGraw-Hill' Companies
'1200 G Street, N.W.
Suite 1100 Washington, D.C. 20005-3802 l
L
.=. - . - - -
A_uA m* EM- __~a.44,_.. e ,u_a.. - 4e A_- c&.4p.- a...__,4,p.4s4-,4- *-oA- ea4 , ass s ,a 4 .mae,_A a ag
---o-.
- e- w # _m-m, E-. . __
4 ENCLOSURE TENNESSEE VALLEY AUTHORITY
- BROWNS FERRY NUCLEAR PLANT (BFN)
MONTHLY OPERATING REPORT OCTOBER 1998 UNIT 1 ,
l 1
DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 i
UNIT 2 I
DOCKET NUMBER 50-260 e
LICENSE NUMBER DPR-52 UNIT 3 DOCKET NUMBER 50-296 LICENSE NUMBER DPR-68 l
OPERATIONAL SUtefARY OCTOBER 1998 l
l BROWNS FERRY NUCLEAR PLANT UNIT 1 Unit 1 remains shutdown on administrative hold to resolve various TVA and NRC concerns. Unit 1 has been on administrative hold since June 1, 1985. As a result, TVA considers that accrual of reporting hours is suspended since the unit has a maximum dependable capacity of zero MWe. Accordingly, TVA does not l
consider reporting cumulative hours for the period beginning i June 1, 1985, when calculating the operating status variables. I BROWNS FERRY NUCLEAR PLANT UNIT 2 )
For the month of October, Unit 2 generated 762,650 megawatt hours gross electrical power and operated at a net capacity factor of 93.8 percent. On October 1, 1998 at 0047 hours5.439815e-4 days <br />0.0131 hours <br />7.771164e-5 weeks <br />1.78835e-5 months <br />, Unit 2 scrammed due to turbine trip on high Stator Coolant System temperature. !
The unit restarted and became critical at 0122 hours0.00141 days <br />0.0339 hours <br />2.017196e-4 weeks <br />4.6421e-5 months <br /> on October i 2, 1998, and closed breaker at 0641 hours0.00742 days <br />0.178 hours <br />0.00106 weeks <br />2.439005e-4 months <br /> on October 2, 1998. As of October 31, 1998, Unit 2 has operated continuously for 29 days.
I i
l BROWNS FERRY NUCLEAR PLANT UNIT 3 i For the month of October, Unit 3 generated 380,540 megawatt hours gross electrical power with a net capacity factor of 44.4 percent. On September 20, 1998, at 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br />, Unit 3 started its scheduled Cycle 8 refueling outage. The unit restarted and became critical at 1809 hours0.0209 days <br />0.503 hours <br />0.00299 weeks <br />6.883245e-4 months <br /> on October 14, 1998, and closed breaker at 1059 hours0.0123 days <br />0.294 hours <br />0.00175 weeks <br />4.029495e-4 months <br /> on October 15, 1998. As of October 31, 1998, Unit 3 has operated continuously for 15 days.
E-1 i
i 1
- . - . .- - - . . . - _ - . - - . _ - = . . . . . _ .-..- - .
u; ;
\
AVERAGE DAILY UNIT POWER LEVEL i DOCKET NO. 50-259 UNIT NO. ONE DATE: Nov. 9, 1998 l
l l
COMPLETED BY: J. E. Wallace TELEPHONE 256-729-7874
' MONTH- October 1998 l AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL l l
l DAY (MWe-Net) DAY (MWe-Net) l l
- 1. 0 17 O j l
- 2. 0 18. O I
- 3. 0 19. O l' 4 . 0 20. 0
- 5. 0 21. 0
- 6. 0 22. O l
- 7. 0 23. 0
- 8. 0 24. 0
- 9. 0 25. 0
- 10. 26.
0 O j
- 11. 0 27. 0 12 0 28. 0 l
-13. 0 29. 0
- 14. 0 30, 0 1
- 15. 0 31 0 r
- 16. 0 l I
1 E-2 1
l l .
I i
AVERAGE DAILY UNIT POWER LEVEL l-l DOCKET NO. 50-260 UNIT NO. TWO DATE: Nov. 9, 1998 COMPLETED BY: J. E. Wallace TELEPHONE 256-729-7874 MONTH October 1998 l
l AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net) DAY (MWe-Net)
- 1. 18 17, 1086
- 2. 197 18. 1086 '
l
- 3. 846 19. 957
- 4. 973 20. 1053
- 5. 1050 21. 1063
- 6. 1082 22. 1065
- 7. 1078 23. 1076 i
- 8. 1078 24. 1081.
- 9. 1075 25. 1084 ,
l
- 10. 1083 26. 1084 !
- 11. 1077 27. 1086 12- 1084 28. 1094
- 13. 1085 29. 1085 14 '. 1085 30. 1058
- 15. 1085 31 1067
- 16. 1084 i
i n
0-l E-3 1
1 AVERAGE DAILY UNIT POWER LEVEL i
l DOCKET NO. 50-296 UNIT NO. THREE DATE: Nov. 9, 1998 COMPLETED BY: J. E. Wallace TELEPHONE 256-729-7874 HONTH- October 1998 l
AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL l
DAY (MWe-Net) DAY (MWe-Net) l
- 1. 0 17. 573 I
- 2. -0 18. 950 l
l
- 3. 0 19. 807 i 4. 0 20. 1006 l
- 5. 0 21. 999 j
- 6. 0 22. 899 ;
- 7. 0 23. 918 l
- 8. 0 24. 1085
- 9. 0 25. 1145 i
- 10. 0 26. 1146
- 11. 0 27. 1147 12 0 28. 1037
- 13. 0 29. 1080
~14. 0 30. 1099 l
- 15. 94 31 1126 l 16. 374 E-4 l
l
- - . .. _. . . . -_= - -_ - -
OPERATING DATA REPORT Docket No. 50-259 Date: Nov. 9.1998 Completed By: J. E. Wallace Telephone: (2561-729-7874
- 1. Unit Name: BFN Unit 1
- 2. Reporting Period: October 1998
- 3. Licensed Thermal Power (MWt): 3293
- 4. Nameplate Rating (Gross MWe): 1152
- 5. Design Electrical Rating (Net MWe): 1065
- 6. Maximum Dependable Capacity (Gross MWe): 9
- 7. Maximum Dependable Capacity (Net MWe): 9
- 8. If changes Occur in Capacity Rating (Item Numbers 3 Through 7) Since Last Report, Give Reasons: N/A
- 9. Power Level To Which Restricted, If any (net MWe): 0
- 10. Reasons for Restrictions, If any: Administrative Hold 1
This Month Yr-To-Date Cumulative
- l
- 11. Hours in Reporting Period 0 0 95743
- 12. Number of Hours Reactor was Critical ,_
0 0 59521
- 13. Reactor Reserve Shutdown Hours 0 0 6997 l
-14. Hours Generator On-Line 0 0 58267 l
- 15. Unit Reserve' Shutdown Hours 0 0 0 l
- 16. Gross Thermal Energy Generated (MWh) 0 0 168066787
- 17. Gross Electric Energy Generated (MWh) 0 0 _ 55398130
- 18. Net Electrical Energy Generated (MWh) 0 0 53796427
- 19. Unit Service Factor 0 0 60.86
- 20. Unit Availability Factor 0 0 60,86
- 21. Unit Capacity Factor (Using MDC Net) 0 0 52.76
- 22. Unit Capacity Factor (Using DER Net) 0 0 52.76
- 23. Unit Forced Outage Rate 0 0 25.57
- 24. Shutdowns Scheduled Over Next 6 Months (Type, !
Date, and Duration of Each): N/A
- 25. If Shutdown at End of Report Period, Estimate Date of Startup: To Be Determined
(
- Excludes hours under Administrative Hold (June 1,1985 to present)
E-5 l
l
i- ,
1 1
OPERATING DATA REPORT !
l Docket No. 50-260 l Date: Nov. 9.1998 Completed By: J. E. Wallace !
Telephone: (2561-729-7874
{
- 1. Unit Name: BFN Unit 2
- 2. Reporting Period: October 1998 i
! 3. Licensed Thermal Power (MWt): 3293
- 4. Nameplate Rating (Gross MWe): 1152 I
- 5. Design Electrical Rating (Net MWe): 1065 l l 6. Maximum Dependable Capacity (Gross MWe): 1998.4
- 7. Maximum Dependable Capacity (Net MWe): 1965
- 8. If changes Occm in Capacity Rating (Item Numbers 3 Through 7) Since Last Report, Give Reasons: N/A 1
- 9. Power Level To Which Restricted, If any (net MWe): N/A l l
- 10. Reasons for Restrictions, If any: N/A l l l This Month Yr-To-Date Cumulative *
- 11. Hours in Reporting Period 745.0 7296.0 155671
- 12. Number of Hours Reactor was Critical 720.0 7271.0 114078 I
[ 13. Reactor Reserve Shutdown Hours 0.0 0.0 14200 J i 14. Hours Generator On-Line 715.0 7266.0 111679
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0
- 16. Gross Thermal Energy Generated (MWh) 2291258.0 23771098 333806582
- 17. Gross Electric Energy Generated (MWh) 762650.0 7914140 110916618 ;
- 18. Net Electrical Energy Generated (MWh) 744146.0 7732951 107939042
- 19. Unit Service Factor 96.0 99.6 71.7
- 20. Unit Availability Factor 96.0 99.6 71.7
- 21. Unit Capacity Factor (Using MDC Net) 93.8 99.5 65.1 l 22. Unit Capacity Factor (Using DER Net) 93.8 99.5 65.1
- 23. - Unit Forced Outage Rate 0.0 0.4 13.3
- 24. Shutdowns Scheduled Over Next 6 Months (Type, L Date, and Duration of Each): Unit 2 Cycle 10 Refueling Outage Scheduled to Begin on April 11, 1999,25-Days Duration
- 25. If Shutdown at End of Repon Period, Estimate Date of Startup: N/A
- Excludes hours under Administrative Hold (June 1,1985 to May 24,1991) ,
i E-6 L
t
i
- 1 OPERATING DATA REPORT Docket No. 50-296 Date: Nov. 9.1998 Completed By: J. E. Wallace Telephone: (256)-729-7874
- 1. Unit Name: BFN Unit 3
- 2. Reporting Period: October 1998
- 3. Licensed Thermal Power (MWt): 3458
- 4. Nameplate Rating (Gross MWe): 1190
- 5. Design Electrical Rating (Net MWe): 1120
- 6. Maximum Dependable Capacity (Gross MWe): Jig.5
- 7. Maximum Dependable Capacity (Net MWe): 1119 8.' If changes Occur in Capacity Rating (Item Numbers 3 Through 7) Since Last Report, Give Reasoas: Unit 3 is Authorized to Operate at a 5-Percent Power Uprate Condition Upon Restart from the Cycle 8 Refueling Outage (October 15,1998) in Accordance with Technical Specification Amendment No. 214 Dated September 8,1998.
- 9. Power Level To Which Restricted, If any (net MWe): N/A
- 10. Reasons for Restrictions, if any N/A This Month Yr-To-Date Cumulative *
' 11. Hours in. Reporting Period 745.0 7296.0 98893
- 12. Number of Hours Reactor was Critical 415.0 6443.0 69517
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 7068-
- 14. Hours Generator On-Line 398.0 6399.6 68121
- 15. - Unit Reserve Shutdown Hours 0.0 , 0.0 0.0
- 16. Gross Thermal Energy Generated (MWh) 1150351.0 19426543 206861456
- 17. Gross Electric Energy Generated (MWh) 380540.0 6387160 69150570
- 18. Net Electrical Energy Generated (MWh) 369918.0 6218743 66424240
- 19. Unit Service Factor 53.4 87.7- 68.9
- 20. Unit Availability Factor 53.4 87.7 68.9
. 21. Unit Capacity Factor (Using MDC Net) 44.4 79.6 63.0
- 22. Unit Capacity Factor (Using DER Net) 44.4 79.6 63.0
- 23. Unit Forced Outage Rate 0.0 0.1 15.4
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
- 25. . If Shutdown at End of Report Period, Estimate Date of. Startup: N/A
- Excludes hours under Administrative Hold
_(June 1,1985 to November 19,1995) .
t E-7 l
UNIT SHUTDOWNS AND POWER REDUCTIONS -
REPORT MONTH: OCTOBER 1998 .
l i
DOCKET NO: 50-259
~
UNIT NAME: BFN-1 DATE: November 9,1998 COMPLETED BY: J. E. Wallace TELEPHONE: (256) 729-7874 No.x 9 Dates TypcI Duration;
~
- Reassn*c
^
LMethod ofg Licensee? Systenti :Coinponent! Cause'and Corrective Action; to Prevent :
~(Hours)} Snutting) EfentLReport CodeY . Code 7 'Reearrencel ggg ~ :y,y w ~
' Remit $N? '
1 06/01/85 S 745 F 4 N/A N/A N/A Administrative hold to resolve various TVA I and NRC concerns.
[
' F: Forced ' Reason: ' Method ' Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)
C-Refueling 3-Automatic Scram (NUREG - 1022)
D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage ,
Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)
H-Other (Explain) t E-8
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT' MONTH: OCTOBER 1998 ,
DOCKET NO: 50-260
~
UNIT NAME: BFN-2 DATE: November 9,1998 COMPLETED BY: J. E. Wallace
^
TELEPHONE: (256) 729-7874 No. ?Datei iType . Duration: Reasont
~
- ' Met. hod or LicenseeP :Systemf Component ;Cause and Corrective Action.to Prevent)
LShuttingli EveniReport' l Code? ll Code 0 ; Recurrence t
-L(Hours)!
s.:
DbWa{ N62 ReactAr'l y 3 10/01/98 F 30 A 3 260/1998003 TJ ISV On 10/01/98 at 0047 CDT Unit 2 received a full automatic scram from 100 percent power. The scram was generated by a main turbine trip which was the result of high generator stator cooling water outlet temperature. The cause of the scram was failure of a normally open manual isolation valve which blocked the flow of stator cooling water through the associated heat exchangers.
3
' F: Fosted Reason: ' Method
- Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)
C-Refueling 3-Automatic Scram (NUREG - 1022)
D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)
H-Other (Explain) i E-9
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: OCTOBER 1998 ,
DOCKET NO: 50-296 UNIT NAME: BFN-3 DATE: November 9,1998 COMPLETED BY: J. E. Wallace TELEPHONE: (256) 729-7874
~
. No,' 4Date? Typejj ;Duratha Reaso.nI l Method .off: ; Licenses} _. Systems; ; Component] lCauseland Corrective / Action':to Preventi
.(Haurs){
Sh;uttingll Event: Report:: ; Code? lCode' iRecurrsacel! * "
D6wni , ;; nom ' -
w
[gg: ,
10 10/01/98 S 347 C 4 N/A N/A N/A The Unit 3, Cycle 8 refueling outage began at 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> on September 20,1998. The unit restarted on October 14,1998, and closed breaker at 1059 hours0.0123 days <br />0.294 hours <br />0.00175 weeks <br />4.029495e-4 months <br /> on October 15,1998.
' F: Forced
- Reason: ' Method
- Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)
C-Refueling 3-Automatic Scram (NUREG - 1022)
D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)
H-Other (Explain)
E-10