, IU.A.

Tennessee Valley Authority, Post Office Box 2000, Docutur, Alabama 35609-2000 November 13, 1998 i

v

?

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos. 50-259 Tennessee Valley Authority ) 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - OCTOBER 1998 MONTHLY OPERATING REPORT The enclosure provides the October 1998 Monthly Operating Report as required by BFN Technical Specifications Section 5.6.4.  ;

. i If you have any questions concerning this matter, please call ,j me at (256) ' '9-2636.

Sincerely,

/ -

y (;

\b -

T. E. Abney '

Manager of ensin j ,. 2-and Ind stry Affa rs Enclosure cc: See page 9811F'30200 9810314:

PDR-R ADOCK 0500025V PDR3 n.- -.

?.

i 1

U.S. Nuclear Regulatory Commission- r Page 2

.Notrember 13, 1998 i

Enclosure  !

cc (Enclosure): ,

Mr. Harold O. Christensen, Branch Chief U.S. Nuclear Regulatory Commission Region II 61 Forsyth Street, S.W.

Suite 23T85 Atlanta, Geo'rgia'30303 Mr. Frederick J. Hebdon, Director .

Project Directorate II-4  :

Division of Reactor Projects I-II ,

Office of Nuclear Reactor 1 Regulation, Mail 13 H3' Washington, D.C. 20555 i INPO Records Center-Institute of Nuclear Power Operations  ;

700 Galleria-Parkway

' Atlanta, Georgia 30339-5957 Mr. James Lang, Manager.

Advanced Reactor Department Electric Power.Research-Institute 3340 Hillview Avenue:

'Palo Alto, California 94304 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611 Regional Administrator l

U.S. Nuclear Regulatory Commission Region II  ;

61 Forsyth Street, S.W.

Suite 23T85 Atlanta, Georgia 30303-I Ms.. Barbara Lewis McGraw-Hill' Companies

'1200 G Street, N.W.

Suite 1100 Washington, D.C. 20005-3802 l

L

.=. - . - - -

A_uA m* EM- __~a.44,_.. e ,u_a.. - 4e A_- c&.4p.- a...__,4,p.4s4-,4- *-oA- ea4 , ass s ,a 4 .mae,_A a ag

---o-.

  • e- w # _m-m, E-. . __

4 ENCLOSURE TENNESSEE VALLEY AUTHORITY

- BROWNS FERRY NUCLEAR PLANT (BFN)

MONTHLY OPERATING REPORT OCTOBER 1998 UNIT 1 ,

l 1

DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 i

UNIT 2 I

DOCKET NUMBER 50-260 e

LICENSE NUMBER DPR-52 UNIT 3 DOCKET NUMBER 50-296 LICENSE NUMBER DPR-68 l

OPERATIONAL SUtefARY OCTOBER 1998 l

l BROWNS FERRY NUCLEAR PLANT UNIT 1 Unit 1 remains shutdown on administrative hold to resolve various TVA and NRC concerns. Unit 1 has been on administrative hold since June 1, 1985. As a result, TVA considers that accrual of reporting hours is suspended since the unit has a maximum dependable capacity of zero MWe. Accordingly, TVA does not l

consider reporting cumulative hours for the period beginning i June 1, 1985, when calculating the operating status variables. I BROWNS FERRY NUCLEAR PLANT UNIT 2 )

For the month of October, Unit 2 generated 762,650 megawatt hours gross electrical power and operated at a net capacity factor of 93.8 percent. On October 1, 1998 at 0047 hours5.439815e-4 days <br />0.0131 hours <br />7.771164e-5 weeks <br />1.78835e-5 months <br />, Unit 2 scrammed due to turbine trip on high Stator Coolant System temperature.  !

The unit restarted and became critical at 0122 hours0.00141 days <br />0.0339 hours <br />2.017196e-4 weeks <br />4.6421e-5 months <br /> on October i 2, 1998, and closed breaker at 0641 hours0.00742 days <br />0.178 hours <br />0.00106 weeks <br />2.439005e-4 months <br /> on October 2, 1998. As of October 31, 1998, Unit 2 has operated continuously for 29 days.

I i

l BROWNS FERRY NUCLEAR PLANT UNIT 3 i For the month of October, Unit 3 generated 380,540 megawatt hours gross electrical power with a net capacity factor of 44.4 percent. On September 20, 1998, at 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br />, Unit 3 started its scheduled Cycle 8 refueling outage. The unit restarted and became critical at 1809 hours0.0209 days <br />0.503 hours <br />0.00299 weeks <br />6.883245e-4 months <br /> on October 14, 1998, and closed breaker at 1059 hours0.0123 days <br />0.294 hours <br />0.00175 weeks <br />4.029495e-4 months <br /> on October 15, 1998. As of October 31, 1998, Unit 3 has operated continuously for 15 days.

E-1 i

i 1

- . - . .- - - . . . - _ - . - - . _ - = . . . . . _ .-..- - .

u;  ;

\

AVERAGE DAILY UNIT POWER LEVEL i DOCKET NO. 50-259 UNIT NO. ONE DATE: Nov. 9, 1998 l

l l

COMPLETED BY: J. E. Wallace TELEPHONE 256-729-7874

' MONTH- October 1998 l AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL l l

l DAY (MWe-Net) DAY (MWe-Net) l l

1. 0 17 O j l
2. 0 18. O I
3. 0 19. O l' 4 . 0 20. 0
5. 0 21. 0
6. 0 22. O l
7. 0 23. 0
8. 0 24. 0
9. 0 25. 0
10. 26.

0 O j

11. 0 27. 0 12 0 28. 0 l

-13. 0 29. 0

14. 0 30, 0 1
15. 0 31 0 r
16. 0 l I

1 E-2 1

l l .

I i

AVERAGE DAILY UNIT POWER LEVEL l-l DOCKET NO. 50-260 UNIT NO. TWO DATE: Nov. 9, 1998 COMPLETED BY: J. E. Wallace TELEPHONE 256-729-7874 MONTH October 1998 l

l AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net) DAY (MWe-Net)

1. 18 17, 1086
2. 197 18. 1086 '

l

3. 846 19. 957
4. 973 20. 1053
5. 1050 21. 1063
6. 1082 22. 1065
7. 1078 23. 1076 i
8. 1078 24. 1081.
9. 1075 25. 1084 ,

l

10. 1083 26. 1084  !
11. 1077 27. 1086 12- 1084 28. 1094

- 13. 1085 29. 1085 14 '. 1085 30. 1058

15. 1085 31 1067
16. 1084 i

i n

0-l E-3 1

1 AVERAGE DAILY UNIT POWER LEVEL i

l DOCKET NO. 50-296 UNIT NO. THREE DATE: Nov. 9, 1998 COMPLETED BY: J. E. Wallace TELEPHONE 256-729-7874 HONTH- October 1998 l

AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL l

DAY (MWe-Net) DAY (MWe-Net) l

1. 0 17. 573 I
2. -0 18. 950 l

l

3. 0 19. 807 i 4. 0 20. 1006 l
5. 0 21. 999 j
6. 0 22. 899  ;
7. 0 23. 918 l
8. 0 24. 1085
9. 0 25. 1145 i
10. 0 26. 1146
11. 0 27. 1147 12 0 28. 1037
13. 0 29. 1080

~14. 0 30. 1099 l

15. 94 31 1126 l 16. 374 E-4 l

l

- - . .. _. . . . -_= - -_ - -

OPERATING DATA REPORT Docket No. 50-259 Date: Nov. 9.1998 Completed By: J. E. Wallace Telephone: (2561-729-7874

1. Unit Name: BFN Unit 1
2. Reporting Period: October 1998
3. Licensed Thermal Power (MWt): 3293
4. Nameplate Rating (Gross MWe): 1152
5. Design Electrical Rating (Net MWe): 1065
6. Maximum Dependable Capacity (Gross MWe): 9
7. Maximum Dependable Capacity (Net MWe): 9
8. If changes Occur in Capacity Rating (Item Numbers 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If any (net MWe): 0
10. Reasons for Restrictions, If any: Administrative Hold 1

This Month Yr-To-Date Cumulative

  • l
11. Hours in Reporting Period 0 0 95743
12. Number of Hours Reactor was Critical ,_

0 0 59521

13. Reactor Reserve Shutdown Hours 0 0 6997 l

-14. Hours Generator On-Line 0 0 58267 l

15. Unit Reserve' Shutdown Hours 0 0 0 l
16. Gross Thermal Energy Generated (MWh) 0 0 168066787
17. Gross Electric Energy Generated (MWh) 0 0 _ 55398130
18. Net Electrical Energy Generated (MWh) 0 0 53796427
19. Unit Service Factor 0 0 60.86
20. Unit Availability Factor 0 0 60,86
21. Unit Capacity Factor (Using MDC Net) 0 0 52.76
22. Unit Capacity Factor (Using DER Net) 0 0 52.76
23. Unit Forced Outage Rate 0 0 25.57
24. Shutdowns Scheduled Over Next 6 Months (Type,  !

Date, and Duration of Each): N/A

25. If Shutdown at End of Report Period, Estimate Date of Startup: To Be Determined

(

  • Excludes hours under Administrative Hold (June 1,1985 to present)

E-5 l

l

i- ,

1 1

OPERATING DATA REPORT  !

l Docket No. 50-260 l Date: Nov. 9.1998 Completed By: J. E. Wallace  !

Telephone: (2561-729-7874

{

1. Unit Name: BFN Unit 2
2. Reporting Period: October 1998 i

! 3. Licensed Thermal Power (MWt): 3293

4. Nameplate Rating (Gross MWe): 1152 I
5. Design Electrical Rating (Net MWe): 1065 l l 6. Maximum Dependable Capacity (Gross MWe): 1998.4
7. Maximum Dependable Capacity (Net MWe): 1965
8. If changes Occm in Capacity Rating (Item Numbers 3 Through 7) Since Last Report, Give Reasons: N/A 1
9. Power Level To Which Restricted, If any (net MWe): N/A l l
10. Reasons for Restrictions, If any: N/A l l l This Month Yr-To-Date Cumulative *
11. Hours in Reporting Period 745.0 7296.0 155671
12. Number of Hours Reactor was Critical 720.0 7271.0 114078 I

[ 13. Reactor Reserve Shutdown Hours 0.0 0.0 14200 J i 14. Hours Generator On-Line 715.0 7266.0 111679

15. Unit Reserve Shutdown Hours 0.0 0.0 0
16. Gross Thermal Energy Generated (MWh) 2291258.0 23771098 333806582
17. Gross Electric Energy Generated (MWh) 762650.0 7914140 110916618  ;
18. Net Electrical Energy Generated (MWh) 744146.0 7732951 107939042
19. Unit Service Factor 96.0 99.6 71.7
20. Unit Availability Factor 96.0 99.6 71.7
21. Unit Capacity Factor (Using MDC Net) 93.8 99.5 65.1 l 22. Unit Capacity Factor (Using DER Net) 93.8 99.5 65.1
23. - Unit Forced Outage Rate 0.0 0.4 13.3
24. Shutdowns Scheduled Over Next 6 Months (Type, L Date, and Duration of Each): Unit 2 Cycle 10 Refueling Outage Scheduled to Begin on April 11, 1999,25-Days Duration
25. If Shutdown at End of Repon Period, Estimate Date of Startup: N/A
  • Excludes hours under Administrative Hold (June 1,1985 to May 24,1991) ,

i E-6 L

t

i

  • 1 OPERATING DATA REPORT Docket No. 50-296 Date: Nov. 9.1998 Completed By: J. E. Wallace Telephone: (256)-729-7874
1. Unit Name: BFN Unit 3
2. Reporting Period: October 1998
3. Licensed Thermal Power (MWt): 3458
4. Nameplate Rating (Gross MWe): 1190
5. Design Electrical Rating (Net MWe): 1120
6. Maximum Dependable Capacity (Gross MWe): Jig.5
7. Maximum Dependable Capacity (Net MWe): 1119 8.' If changes Occur in Capacity Rating (Item Numbers 3 Through 7) Since Last Report, Give Reasoas: Unit 3 is Authorized to Operate at a 5-Percent Power Uprate Condition Upon Restart from the Cycle 8 Refueling Outage (October 15,1998) in Accordance with Technical Specification Amendment No. 214 Dated September 8,1998.
9. Power Level To Which Restricted, If any (net MWe): N/A
10. Reasons for Restrictions, if any N/A This Month Yr-To-Date Cumulative *

' 11. Hours in. Reporting Period 745.0 7296.0 98893

12. Number of Hours Reactor was Critical 415.0 6443.0 69517
13. Reactor Reserve Shutdown Hours 0.0 0.0 7068-
14. Hours Generator On-Line 398.0 6399.6 68121
15. - Unit Reserve Shutdown Hours 0.0 , 0.0 0.0
16. Gross Thermal Energy Generated (MWh) 1150351.0 19426543 206861456
17. Gross Electric Energy Generated (MWh) 380540.0 6387160 69150570
18. Net Electrical Energy Generated (MWh) 369918.0 6218743 66424240
19. Unit Service Factor 53.4 87.7- 68.9
20. Unit Availability Factor 53.4 87.7 68.9

. 21. Unit Capacity Factor (Using MDC Net) 44.4 79.6 63.0

22. Unit Capacity Factor (Using DER Net) 44.4 79.6 63.0
23. Unit Forced Outage Rate 0.0 0.1 15.4
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
25. . If Shutdown at End of Report Period, Estimate Date of. Startup: N/A
  • Excludes hours under Administrative Hold

_(June 1,1985 to November 19,1995) .

t E-7 l

UNIT SHUTDOWNS AND POWER REDUCTIONS -

REPORT MONTH: OCTOBER 1998 .

l i

DOCKET NO: 50-259

~

UNIT NAME: BFN-1 DATE: November 9,1998 COMPLETED BY: J. E. Wallace TELEPHONE: (256) 729-7874 No.x 9 Dates TypcI Duration;

~

Reassn*c

^

LMethod ofg Licensee? Systenti :Coinponent! Cause'and Corrective Action; to Prevent :

~(Hours)} Snutting) EfentLReport CodeY . Code 7 'Reearrencel ggg ~ :y,y w ~

' Remit $N? '

1 06/01/85 S 745 F 4 N/A N/A N/A Administrative hold to resolve various TVA I and NRC concerns.

[

' F: Forced ' Reason: ' Method ' Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)

C-Refueling 3-Automatic Scram (NUREG - 1022)

D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage ,

Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)

H-Other (Explain) t E-8

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT' MONTH: OCTOBER 1998 ,

DOCKET NO: 50-260

~

UNIT NAME: BFN-2 DATE: November 9,1998 COMPLETED BY: J. E. Wallace

^

TELEPHONE: (256) 729-7874 No. ?Datei iType . Duration: Reasont

~

' Met. hod or LicenseeP :Systemf Component ;Cause and Corrective Action.to Prevent)

LShuttingli EveniReport' l Code? ll Code 0  ; Recurrence t

-L(Hours)!

s.:

DbWa{ N62 ReactAr'l y 3 10/01/98 F 30 A 3 260/1998003 TJ ISV On 10/01/98 at 0047 CDT Unit 2 received a full automatic scram from 100 percent power. The scram was generated by a main turbine trip which was the result of high generator stator cooling water outlet temperature. The cause of the scram was failure of a normally open manual isolation valve which blocked the flow of stator cooling water through the associated heat exchangers.

3

' F: Fosted Reason: ' Method

  • Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)

C-Refueling 3-Automatic Scram (NUREG - 1022)

D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)

H-Other (Explain) i E-9

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: OCTOBER 1998 ,

DOCKET NO: 50-296 UNIT NAME: BFN-3 DATE: November 9,1998 COMPLETED BY: J. E. Wallace TELEPHONE: (256) 729-7874

~

. No,' 4Date? Typejj ;Duratha Reaso.nI l Method .off: ; Licenses} _. Systems; ; Component] lCauseland Corrective / Action':to Preventi

.(Haurs){

Sh;uttingll Event: Report:: ; Code? lCode' iRecurrsacel! * "

D6wni ,  ;; nom ' -

w

[gg: ,

10 10/01/98 S 347 C 4 N/A N/A N/A The Unit 3, Cycle 8 refueling outage began at 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> on September 20,1998. The unit restarted on October 14,1998, and closed breaker at 1059 hours0.0123 days <br />0.294 hours <br />0.00175 weeks <br />4.029495e-4 months <br /> on October 15,1998.

' F: Forced

  • Reason: ' Method
  • Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)

C-Refueling 3-Automatic Scram (NUREG - 1022)

D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)

H-Other (Explain)

E-10