OPERATIONAL
SUMMARY
I DECEMBER 1995 BROWNS FERRY 1 Unit 1 remains shutdown on administrative hold to resolve various TVA and NRC concerns.
Unit 1 has been on administrative hold since June 1, 1985.
As a result, TVA considers that accrual of reporting hours is suspended since the unit has a maximum dependable capacity of 0 MWe.
Accordingly, TVA does not consider cumulative reporting period hours for the period beginning June 1, 1985, when calculating the operating status variables.
BROWNS FERRY 2 During the month Unit 2 operated at a capacity factor of 100 percent and generated 815,180 megawatt hours gross electrical power.
As of December 31, 1995, Unit 2 has operated continuously for 133 days.
i l
BROWNS FERRY 3 After being shutdown and on administrative hold since i
June 1, 1985, the Unit 3 reactor was restarted and declared critical at 1203 hours0.0139 days <br />0.334 hours <br />0.00199 weeks <br />4.577415e-4 months <br /> on November 19, 1995.
Power ascension testing was completed for Unit 3 on December 14, 1995.
During the month Unit 3 operated at a capacity factor of 94.5 percent and generated 766,410 megawatt hours gross electrical power.
j As of December 31, 1995, Unit 3 has operated continuously for 33 days, a
i l
i I
9601190326 960112 PDR ADOCK 050GO259 9
R pop
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:
50-259 1
UNIT:
BROWNS FERRY l PREPARED BY:
T. R. Smith TELEPHONE: 205) 729-2955 MONTH DECEMBER 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
16 0
2 0
17 0
3 0
18 0
4 0
19 0
5 0
20 0
6 0
21 0
7 0
22 0
j i
8 0
23 0
9
'O 24 0
10 0
25 0
11 0
26 0
12 0
27 0
13 0
28 0
14 0
29 0
15 0
30 0
31 0
l AVERAGE DAILY UNIT POWER LEVEL.
DOCKET NO:
50-260 UNIT:
BROWNS FERRY 2 PREPARED BY:.
T.
R. Smith TELEPHONE:
(205) 729-2955 MONTH DECEMBER 1995 DAY-AVERAGE DAILY-POWER LEVEL DAY AVERAGE. DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1
-1084 16 999 2
1088 17 1072 3
1086 18 1079 4
1086 19' 1085 5
1013 20 1082 i
6 856 21 1079 i
7 1086 22 1087 8
1082 23 1082 j
9 1075 24 1084 10 1081 25 1082 Il 1084 26 1078 12 1085 27 1086 i
13 1084 28 1081 14 1083 29 1075 15 1082 30 1083 31 1084
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:
50-296 UNIT:
BROWNS FERRY 3 PREPARED BY:
T.
R. Smith TELEPHONE:
(205) 729-2955 MONTH DECEMBER 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 530 16 1094 2
661 17 1089 3
947 18 1093 l
4 711 19 1099 5
690 20 1096 6
913 21 1085 7
820 22 1102 8
955 23 1096' 9
1096 24 1091 1
10 1083 25 1093
'11 1097 26 1086 12 1098 27 1100 13 1012 28 1099 14 988 29 1085 15 1096 30 1095 31
'1093
s UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:
50-259 REPORT MONTH:
DECEMBER 1995 UNIT:
BROWNS FERRY l PREPARED BY:
T.
R.
Smith TELEPHONE:
(205) 729-2955 Method of License Duration Shutting Event System Component cause and Corrective Action to Prevent No.
Date Type' (Mours)
Reason' Doun Reactor' Report No.
Cod /
Code' Recurrence 1
06/01/85 S
744 F
4 Administrative hold to resolve various TVA and NRC concerns.
i I
'F-Forced
'A-Equipment Failure (Explain)
- Method:
' Instructions for Preparation of Licensee S-Scheduled B-Maintenance or Test 1-Manual Event Reports (NUREG-1022)
C-Refueling 2-Manual Scram D-Regulatory Restriction 3-Automatic Scram E-operator Training and License Examination 4-Continuation of Existing Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other M-Other (Explain)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:
50-260 REPORT MONTH:
DECEMBER 1995 UNIT: BROWNS FERRY 2 PREPARED BY:
T. R. Smith
~
TELEPHONE:
(205) 729-2955
,a Method of License Duration St.utting Event System Component Cause and Corrective Action to Prevent No.
Date Type' (Hours)
Reason
- Down Reactor
- Report No.
Code' Code' Recurrence N/A
'F-Forced A-E @ipment Failure (Explain)
' Method:
' Instructions for Preparation of Licensee S-Scheduled B-Maintenance or Test 1-Manuel Event Reports (NUREG-1022)
C-Refueling 2-Manual Scram D-Regulatory Restriction 3-Automatic Scram E-operator Training and License Examination 4-Continuation of Existing Outage F-Administrative 5-Redaction G-Operational Error (Explain) 9-Other H-Other (Explain)
I
h UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:
50-296 REPORT MONTH:
DECEMBER 1995
~
UNIT: BROWNS FERRY 3 PREPARED BY:
T.
R.
Smith TELEPHONE:
(205) 729-2955 l
Method of License Duration Shutting Event System Component Cause and Corrective Action to Prevent No.
Date Type' (Hours)
Reason' Down Reactor' Report No.
Code' Code' Recurrence 6
12/04/95 S
42 8
5 Redxed power to 55% for Feedtsster tuning.
'F+ Forced
'A-Equipment Failure (Explain)
' Method:
' Instructions for Properation of Liscensee S-Sche &ted B-Maintenance or Test 1-Manuel Event Reports (NUREG-1022)
C-Refueling 2-Manuel Scram D-Regulatory Restriction 3-Automatic Scram E-Operator Training and Liscense Examination 3-Automatic Scram F-Adninistrative 4-Continuation of Existing Outage i
G-Operational Error (Explain) 5-Reduction H-Other 9-Other
DOCKET:
50-259 UNIT:
BROWNS FERRY l PREPARED BY:
T. R. SMITH TELEPHONE:
(205) 729-2955 OPERATING STATUS
- 1. Unit Name:
BROWNS FERRY UNIT 1
- 2. Reporting Period:
DECEMBER 1995
- 3. Licensed Thermal Power (MWt):
3293
- 4. Nameplate Rating (Gross MWe):
1152
- 5. Design Electrical Rating (Net MWe):
1065
- 6. Maximum Dependable Capacity (Gross MWe):
0
~
- 7. Maximum Dependable Capacity (Net MWe):
0
- 8. If Changes occur in capacity Ratings (Items Number 3 Through 7) Sir.ce Last Report, Give Reason: N/A
- 9. Power Level To Which Restricted, If Any (Net MWe):
0
- 10. Reason For Restrictions, If Any: Administrative Hold THIS MONTE YEAR TO DATE CUNULATIVE*
- 11. Hours in Reporting Period 0
0 95743
- 12. Hours Reactor Was critical 0
0 59521
- 13. Reactor Reserve Shutdown Hours 0
0 6997
- 14. Hours Generator On Line 0
0 58267
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thernal Generation (MWh) 0 0
168066787
- 17. Gross Electrical Generation (MWh) 0 0
55398130
- 18. Net Electrical Generation (MWh) 0 0
53796427
- 19. Unit Service Factor 0
0 60.9
- 20. Unit Availability Factor 0
0 60.9
- 21. Unit Capacity Factor (MDC Net) 0 0
52.8
- 22. Unit Capacity Factor (DER net) 0 0
52.8
- 23. Unit Forced Outage Rate 0
0 25.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Shut Down At End Of Reporting Period, Estimated Date of Startup: To be determined Excludes hours under administrative hold (June 1, 1985 to present)
OPERATING DATA REPORT DOCKET:
50-260 UNIT:
BROWNS FERRY 2 PREPARED BY:
T. R.
SMITH TELEPHONE:
(205) 729-2955 OPERATING STATUS
- 1. Unit Name:
BROWNS FERRY UNIT 2
- 2. Reporting Period:
DECEMBER 1995
- 3. Licensed Thernal Power (MWt):
3293 l
- 4. Nameplate Rating (Gross MWe):
1152
- 5. Design Electrical Rating (Net MWe):
1065
- 6. Maximum Dependable Capacity (Gross MWe):
1098.4
- 7. Maximum Dependable Capacity (Net MWe):
1065
- 8. If Changes occur in capacity Ratings (Items Number l
3 Through 7) Since Last Report, Give beason:
N/A
- 9. Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reason For Restrictions, If Any: N/A THIS MONTE YEAR TO DATE CIECLATIVE*
- 11. Hours in Reporting Period 744.0 8760 130831
- 12. Hours Reactor Was Critical 744.0 8652 90779
- 13. Reactor Reserve Shutdown Hours 0.0 0
14200
- 14. Hours Generator On Line 744.0 8628 88488
- 15. Unit Reserve Shutdown Hours 0.0 0
0
- 16. Gross Thermal Generation (MWh) 2419486.0 28171417 259340332
- 17. Gross Electrical Generation (MWh) 815180.0 9422140 86165318 f
- 18. Net Electrical Generation (MWh) 796113.0 9197035 83786871
- 19. Unit Service Factor 100.0 98.5 67.6
- 20. Unit Availability Factor 100.0 98.5 67.6
- 21. Unit Capacity Factor (MDC Net) 100.5 98.6 60.1
- 22. Unit capacity Factor (DER net) 100.5 98.6 60.1
- 23. Unit Forced Outage Rate 0.0 1.5 16.0
- 24. Shutdowns Scheduled Over Next 6 Months Refueling Outage: March 23, 1996, 30 days
- 25. If Shut Down At End Of Reporting Period, Estimated Date of Startup: N/A Excludes hours under administrative hold (June 1, 1985 to May 24, 1991)
~
OPERATING DATA REPORT DOCKET:
50-296 UNIT:
BROWNS FERRY 3 PREPARED BY:
T.
R.
SMITH TELEPHONE:
(205) 729-2955
)
l OPERATING STATUS i
- 1. Unit Name:
BROWNS FERRY UNIT 3
- 2. Reporting Period:
DECEMBER 1995
- 3. Licensed Thermal Power (MWt):
3293
- 4. Nameplate Rating (Gross MWe):
1152
- 5. Design Electrical Rating (Net MWe):
1065
- 6. Maximum Dependable Capacity (Gross MWe):
1098.4
- 7. Maximum Dependable capacity (Net MWe):
1065
- 8. If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report,-Give Reason:
N/A
- 9. Power Level To Which Restricted, If Any (Net MWe): N/A
- 10. Reason For Restrictions, If Any:
N/A TEIS MONTE YEAR TO DATE CIAE7I.ATIVE*
- 11. Hours in Reporting Period 744.0 1020 74075
- 12. Hours Reactor Was Critical 744.0 989 46295
- 13. Reactor Reserve Shutdown Hours 0.0 0
5150
- 14. Hours Generator on Line 744.0 811 45005
- 15. Unit Reserve Shutdown Hours 0.0 0
0
- 16. Gross Thermal Generation (MWh 2266270.2 2402014 134270281
- 17. Gross Electrical Generation (MWh) 766410.0 790430 44264190
- 18. Net Electrical Generation (MWh) 748625.0 764618 42878627
- 19. Unit Service Factor 100.0 79.5 60.8
- 20. Unit Availability Factor 100.0 79.5 60.8
- 21. Unit Capacity Factor (MDC Net) 94.5 70.4 54.4
- 22. Unit Capacity Factor (DER net) 94.5 70.4 54.4
- 23. Unit Forced Outage Rate 0.0 0.0 21.3
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
- 25. If Shut Down At End Of Reporting Period, Estimated Date of Startup: N/A Excludes hours under administrative hold (June 1, 1985 to November 19, 1995) l i