Monthly Operating Repts for Dec 1995 for Browns Ferry Nuclear Plant Units 1,2 & 3
ML20096D875
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 12/31/1995
From: Tanya Smith
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20096D792 List:
References
NUDOCS 9601190326
Download: ML20096D875 (9)


Text

. .. . _. - _ -

OPERATIONAL

SUMMARY

I DECEMBER 1995 BROWNS FERRY 1 Unit 1 remains shutdown on administrative hold to resolve various TVA and NRC concerns. Unit 1 has been on administrative hold since June 1, 1985. As a result, TVA considers that accrual of reporting hours is suspended since the unit has a maximum dependable capacity of 0 MWe. Accordingly, TVA does not consider cumulative reporting period hours for the period beginning June 1, 1985, when calculating the operating status variables.

BROWNS FERRY 2 During the month Unit 2 operated at a capacity factor of 100 percent and generated 815,180 megawatt hours gross electrical power. As of December 31, 1995, Unit 2 has operated continuously for 133 days.

i l

BROWNS FERRY 3 After being shutdown and on administrative hold since i June 1, 1985, the Unit 3 reactor was restarted and declared critical at 1203 hours0.0139 days <br />0.334 hours <br />0.00199 weeks <br />4.577415e-4 months <br /> on November 19, 1995. Power ascension testing was completed for Unit 3 on December 14, 1995. During the month Unit 3 operated at a capacity factor of 94.5 percent  !

and generated 766,410 megawatt hours gross electrical power. j As of December 31, 1995, Unit 3 has operated continuously for 33 days, a

l i

l i

I 9601190326 960112 PDR ADOCK 050GO259 9 R pop '

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-259 1 UNIT: BROWNS FERRY l  !

PREPARED BY: T. R. Smith TELEPHONE: 205) 729-2955 MONTH DECEMBER 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 16 0 2 0 17 0 l 3 0 18 0 4 0 19 0 5 0 20 0 6 0 21 0 I

7 0 22 0 j i

8 0 23 0 9 'O 24 0 10 0 25 0 11 0 26 0 12 0 27 0 13 0 28 0 14 0 29 0 15 0 30 0 31 0

l AVERAGE DAILY UNIT POWER LEVEL.

DOCKET NO: 50-260 UNIT: BROWNS FERRY 2 PREPARED BY:. T. R. Smith TELEPHONE: (205) 729-2955 MONTH DECEMBER 1995 DAY- AVERAGE DAILY-POWER LEVEL DAY AVERAGE. DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 -1084 16 999 2 1088 17 1072 3 1086 18 1079 4 1086 19' 1085 5 1013 20 1082 i

6 856 21 1079 i 7 1086 22 1087 8 1082 23 1082 j

9 1075 24 1084 10 1081 25 1082 Il 1084 26 1078 12 1085 27 1086 l i

13 1084 28 1081 14 1083 29 1075 15 1082 30 1083 31 1084

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-296 UNIT: BROWNS FERRY 3 PREPARED BY: T. R. Smith TELEPHONE: (205) 729-2955 MONTH DECEMBER 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 530 16 1094 2 661 17 1089 3 947 18 1093 l

4 711 19 1099 5 690 20 1096 6 913 21 1085 7 820 22 1102 8 955 23 1096' l

9 1096 24 1091 1 10 1083 25 1093

'11 1097 26 1086 12 1098 27 1100 13 1012 28 1099 14 988 29 1085 15 1096 30 1095 31 '1093

s UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-259 REPORT MONTH: DECEMBER 1995 UNIT: BROWNS FERRY l PREPARED BY: T. R. Smith '

TELEPHONE: (205) 729-2955 Method of License Duration Shutting Event System Component cause and Corrective Action to Prevent No. Date Type' (Mours) Reason' Doun Reactor' Report No. Cod / Code' Recurrence 1 06/01/85 S 744 F 4 Administrative hold to resolve various TVA and NRC concerns.

i I

'F-Forced 'A-Equipment Failure (Explain)

  • Method: ' Instructions for Preparation of Licensee S-Scheduled B-Maintenance or Test 1-Manual Event Reports (NUREG-1022)

C-Refueling 2-Manual Scram D-Regulatory Restriction 3-Automatic Scram E-operator Training and License Examination 4-Continuation of Existing Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other M-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-260 REPORT MONTH: DECEMBER 1995 UNIT: BROWNS FERRY 2 PREPARED BY: T. R. Smith ~

TELEPHONE: (205) 729-2955

,a Method of License Duration St.utting Event System Component Cause and Corrective Action to Prevent No. Date Type' (Hours) Reason

  • Down Reactor
  • Report No. Code' Code' Recurrence N/A

'F-Forced A-E @ipment Failure (Explain) ' Method: ' Instructions for Preparation of Licensee S-Scheduled B-Maintenance or Test 1-Manuel Event Reports (NUREG-1022)

C-Refueling 2-Manual Scram D-Regulatory Restriction 3-Automatic Scram E-operator Training and License Examination 4-Continuation of Existing Outage F-Administrative 5-Redaction G-Operational Error (Explain) 9-Other H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-296 REPORT MONTH: DECEMBER 1995 ~

UNIT: BROWNS FERRY 3 PREPARED BY: T. R. Smith TELEPHONE: (205) 729-2955 ..

Method of License Duration Shutting Event System Component Cause and Corrective Action to Prevent No. Date Type' (Hours) Reason' Down Reactor' Report No. Code' Code' Recurrence 6 12/04/95 S 42 8 5 Redxed power to 55% for Feedtsster tuning.

'F+ Forced 'A-Equipment Failure (Explain) ' Method: ' Instructions for Properation of Liscensee S-Sche &ted B-Maintenance or Test 1-Manuel Event Reports (NUREG-1022)

C-Refueling 2-Manuel Scram D-Regulatory Restriction 3-Automatic Scram E-Operator Training and Liscense Examination 3-Automatic Scram F-Adninistrative 4-Continuation of Existing Outage i G-Operational Error (Explain) 5-Reduction H-Other 9-Other

DOCKET: 50-259 UNIT: BROWNS FERRY l PREPARED BY: T. R. SMITH TELEPHONE: (205) 729-2955 OPERATING STATUS

1. Unit Name: BROWNS FERRY UNIT 1
2. Reporting Period: DECEMBER 1995
3. Licensed Thermal Power (MWt): 3293
4. Nameplate Rating (Gross MWe): 1152
5. Design Electrical Rating (Net MWe):

~

1065

6. Maximum Dependable Capacity (Gross MWe): 0
7. Maximum Dependable Capacity (Net MWe): 0
8. If Changes occur in capacity Ratings (Items Number 3 Through 7) Sir.ce Last Report, Give Reason: N/A  ;
9. Power Level To Which Restricted, If Any (Net MWe): 0
10. Reason For Restrictions, If Any: Administrative Hold ,

l l

1 THIS MONTE YEAR TO DATE CUNULATIVE*

11. Hours in Reporting Period 0 0 95743
12. Hours Reactor Was critical 0 0 59521
13. Reactor Reserve Shutdown Hours 0 0 6997
14. Hours Generator On Line 0 0 58267
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thernal Generation (MWh) 0 0 168066787
17. Gross Electrical Generation (MWh) 0 0 55398130
18. Net Electrical Generation (MWh) 0 0 53796427
19. Unit Service Factor 0 0 60.9
20. Unit Availability Factor 0 0 60.9
21. Unit Capacity Factor (MDC Net) 0 0 52.8
22. Unit Capacity Factor (DER net) 0 0 52.8
23. Unit Forced Outage Rate 0 0 25.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
25. If Shut Down At End Of Reporting Period, Estimated Date of Startup: To be determined
  • Excludes hours under administrative hold (June 1, 1985 to present)

OPERATING DATA REPORT I

1 DOCKET: 50-260 1 UNIT: BROWNS FERRY 2 PREPARED BY: T. R. SMITH TELEPHONE: (205) 729-2955 l OPERATING STATUS

1. Unit Name: BROWNS FERRY UNIT 2
2. Reporting Period: DECEMBER 1995  ;
3. Licensed Thernal Power (MWt): 3293 l
4. Nameplate Rating (Gross MWe): 1152
5. Design Electrical Rating (Net MWe): 1065
6. Maximum Dependable Capacity (Gross MWe): 1098.4
7. Maximum Dependable Capacity (Net MWe): 1065
8. If Changes occur in capacity Ratings (Items Number 3 Through 7) Since Last Report, Give beason: N/A l
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reason For Restrictions, If Any: N/A THIS MONTE YEAR TO DATE CIECLATIVE*
11. Hours in Reporting Period 744.0 8760 130831 (
12. Hours Reactor Was Critical 744.0 8652 90779
13. Reactor Reserve Shutdown Hours 0.0 0 14200
14. Hours Generator On Line 744.0 8628 88488
15. Unit Reserve Shutdown Hours 0.0 0 0
16. Gross Thermal Generation (MWh) 2419486.0 28171417 259340332
17. Gross Electrical Generation (MWh) 815180.0 9422140 86165318 ,
18. Net Electrical Generation (MWh) 796113.0 9197035 83786871 f
19. Unit Service Factor 100.0 98.5 67.6 1
20. Unit Availability Factor 100.0 98.5 67.6
21. Unit Capacity Factor (MDC Net) 100.5 98.6 60.1
22. Unit capacity Factor (DER net) 100.5 98.6 60.1
23. Unit Forced Outage Rate 0.0 1.5 16.0
24. Shutdowns Scheduled Over Next 6 Months Refueling Outage: March 23, 1996, 30 days
25. If Shut Down At End Of Reporting Period, Estimated Date of Startup: N/A Excludes hours under administrative hold (June 1, 1985 to May 24, 1991)

. - _. . - . . _ - .-. _- . . ~

OPERATING DATA REPORT l

DOCKET: 50-296 UNIT: BROWNS FERRY 3 PREPARED BY: T. R. SMITH TELEPHONE: (205) 729-2955 ,

l

)

l OPERATING STATUS i

1. Unit Name: BROWNS FERRY UNIT 3
2. Reporting Period: DECEMBER 1995
3. Licensed Thermal Power (MWt): 3293
4. Nameplate Rating (Gross MWe): 1152
5. Design Electrical Rating (Net MWe): 1065
6. Maximum Dependable Capacity (Gross MWe): 1098.4
7. Maximum Dependable capacity (Net MWe): 1065
8. If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report,-Give Reason: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reason For Restrictions, If Any: N/A TEIS MONTE YEAR TO DATE CIAE7I.ATIVE*
11. Hours in Reporting Period 744.0 1020 74075
12. Hours Reactor Was Critical 744.0 989 46295
13. Reactor Reserve Shutdown Hours 0.0 0 5150
14. Hours Generator on Line 744.0 811 45005
15. Unit Reserve Shutdown Hours 0.0 0 0
16. Gross Thermal Generation (MWh 2266270.2 2402014 134270281
17. Gross Electrical Generation (MWh) 766410.0 790430 44264190
18. Net Electrical Generation (MWh) 748625.0 764618 42878627
19. Unit Service Factor 100.0 79.5 60.8
20. Unit Availability Factor 100.0 79.5 60.8 l
21. Unit Capacity Factor (MDC Net) 94.5 70.4 54.4
22. Unit Capacity Factor (DER net) 94.5 70.4 54.4
23. Unit Forced Outage Rate 0.0 0.0 21.3
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A I
25. If Shut Down At End Of Reporting Period, Estimated Date of Startup: N/A
  • Excludes hours under administrative hold 1 (June 1, 1985 to November 19, 1995)  !

l l

i I