MONTHYEARML20217F9671999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With ML20212B8561999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Browns Ferry Nuclear Plant.With ML20210R0931999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With ML20209H4381999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With ML20196B8051999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With ML20206R0731999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Bfnp.With ML20205T5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bfnp.With ML20204C7891999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With ML20199K8951998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Browns Ferry Nuclear Plant.With ML20198D9621998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bfn,Units 1,2 & 3. with ML20195H1941998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With ML20154L5081998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Browns Ferry Nuclear Plant.With ML20151Y2681998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With ML20237B5511998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Browns Ferry Nuclear Plant,Units 1,2 & 3 ML20236R2551998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Brown Ferry Nuclear Plant,Units 1,2 & 3 ML20249B5711998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Browns Ferry Nuclear Plant,Units 1,2 & 3 ML20247Q8381998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Browns Ferry Nuclear Plant ML20216K0101998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Browns Ferry Nuclear Plant ML20216H5961998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Browns Ferry Nuclear Plant,Units 1,2 & 3 ML20202G4821998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Browns Ferry Nuclear Plant ML20198T0271997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Browns Ferry Nuclear Plant ML20203J7081997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Browns Ferry Nuclear Plant,Units 1,2 & 3 ML20199D1431997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Browns Ferry Nuclear Plant,Units 1,2 & 3 ML20198J7911997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Browns Ferry Nuclear Plant,Units 1,2 & 3 ML20210V0331997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for BFN ML20217M3761997-07-31031 July 1997 Monthly Operating Repts for July 1997 for BFN ML20141H2501997-06-30030 June 1997 Monthly Operating Repts for June 1997 for BFN Per TS Section 6.9.1.3 ML20141C0631997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Browns Ferry Nuclear Plant (BFN) Units 1,2 & 3 ML20141G2471997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Browns Ferry Nuclear Plant Units 1,2 & 3 ML20137T2001997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Browns Ferry Nuclear Plant Unit 1,2 & 3 ML20137A4711997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for BFN Units 1,2 & 3 ML20134M6601997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Browns Ferry Nuclear Plant,Units 1,2 & 3 ML20133M1241996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Browns Ferry Nuclear Plant,Units 1,2 & 3 ML20132E2421996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Browns Ferry Nuclear Plant Units 1,2 & 3 ML20129B8841996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Browns Ferry Nuclear Plant Unit 1,2 & 3 ML20129C2471996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Browns Ferry Nuclear Plant,Unit 1 & 2 ML20129B9101996-08-31031 August 1996 Revised MOR for Aug 1996 for Browns Ferry Unit 2 ML20116M6181996-07-31031 July 1996 Monthly Operating Repts for July 1996 for BFN ML20115G4121996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Brown Ferry Nuclear Plant,Units 1,2 & 3 ML20112J2081996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Browns Ferry Nuclear Plant Units 1,2 & 3 ML20112B5201996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Browns Ferry Nuclear Plant Units 1,2 & 3 ML20107G0251996-03-31031 March 1996 Monthly Operating Repts for March 1996 for Browns Ferry Nuclear Plant ML20106G9401996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Browns Ferry Nuclear Plant Units 1,2 & 3 ML20101D0311996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Browns Ferry Nuclear Plant Units 1,2 & 3 ML20096D8751995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Browns Ferry Nuclear Plant Units 1,2 & 3 ML20095K3231995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Browns Ferry Nuclear Plant ML20096D8821995-11-30030 November 1995 Revised Monthly Operating Rept for Nov 1995 for Browns Ferry Nuclear Plant Unit 3 ML20094K4561995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Browns Ferry Nuclear Plant ML20093G6131995-09-30030 September 1995 Monthly Operating Repts for Browns Ferry Nuclear Plant Units 1,2 & 3 ML20092G3511995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Browns Ferry Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML18039A9041999-10-15015 October 1999 LER 99-010-00:on 990917,automatic Reactor Scram on Turbine Stop Valve Closure Occurred.Caused by High Water Level in Main Steam Moisture Separator 2C2.Unit 2C2 Reservoir Level Transmitter & Relays Were Replaced & Tested Satisfactorily ML18039A8981999-10-14014 October 1999 LER 99-009-00:on 990915,manual Reactor Scram Was Noted Due to EHC Leak.Caused by Failure of Stainles Steel Tubing Connection.Removed Damaged Tubing & Connection Plug ML18039A8951999-10-0808 October 1999 LER 99-008-00:on 990905,HPCI Was Inoperable Due to Failed Flow Controller.Caused by Premature Failure of Capacitor 2C3.Replaced Controller & HPCI Sys Was Run IAW Sys Operating Instructions ML18039A8751999-09-30030 September 1999 LER 99-005-00:on 990901,SR for Standby Liquid Control Sampling Was Not Met.Caused by Deficient Procedure for Chemical Addition to Standby Liquid Control.Revised Procedure.With 990930 Ltr ML20217F9671999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With ML20212E6341999-09-23023 September 1999 Suppl to SE Resolving Error in Original 990802 Se,Clarifying Fact That Licensee Has Not Committed to Retain Those Specific Compensatory Measures That Were Applied to one-time Extension ML20212D3831999-09-20020 September 1999 Safety Evaluation Supporting Proposed Rev to Withdrawal Schedule for First & Third Surveillance Capsules for BFN-3 RPV ML20212B8561999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Browns Ferry Nuclear Plant.With ML18039A8821999-08-31031 August 1999 Increased MSIV Leakage Tech Spec Change Submittal - Seismic Evaluation Rept. ML18039A8391999-08-0606 August 1999 BFN Unit 2 Cycle 10 ASME Section XI NIS-1 & NIS-2 Data Repts. ML20210N1221999-08-0202 August 1999 Safety Evaluation Accepting Licensee Request for Relief from ASME B&PV Code,Section XI Requirements.Request 3-ISI-7, Pertains to Second 10-year Interval ISI for Plant,Unit 3 ML20210R0931999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With ML18039A8201999-07-26026 July 1999 LER 99-004-00:on 990625,facility Core Spray Divisions I & II Inoperable at Same Time Due to Personnel Error.Electrical Supply Breaker to Core Spray Division II Pump 3B Returned to Normal Racked in Position ML18039A8171999-07-20020 July 1999 LER 99-007-00:on 990623,discovered That SR for Monitoring of Primary Containment Oxygen Concentration Had Not Been Met. Caused by Failure of Operators to Adequately Communicate. Required Surveillances Were Performed.With 990720 Ltr ML18039A8161999-07-19019 July 1999 LER 99-006-00:on 990618,noted That Main Steam SRV Exceeded TS Setpoint Tolerance.Caused by Pilot Vlve disc-seat Bonding.Util Replaced All 13 SRV Pilot Cartridges with Cartridges Certified to Be Witin +/-1%.With 990719 Ltr ML20209J0771999-07-16016 July 1999 Safety Evaluation Concluding That Licensee Provided Adequate Information to Resolve ampacity-related Points of Concern Raised in GL 92-08 for BFN & That No Outstanding Issues Re GL 92-08 Ampacity Issues for Browns Ferry NPP Exist ML18039A8121999-07-12012 July 1999 LER 99-005-00:on 990617,ESF Actuation & HPCI Declared Inoperable.Caused by Personnel Error.Reset HPCI & Returned Sys to Operable Status with 25 Minutes.With 990712 Ltr ML20209H4381999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With ML18039A8101999-06-28028 June 1999 LER 99-004-00:on 990530,safety Features Sys Actuations Occurred Due to RPS Trip.Caused by Failure of MG Set AC Drive Motor Starter Contractor Coil.Licensee Placed 2B RPS Bus on Alternate Feed & Half Scram Was Reset ML20196F8811999-06-23023 June 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves ML18039A8071999-06-14014 June 1999 LER 99-003-00:on 990515,automatic Reactor Scram Due to Turbine Trip Was Noted.Caused by Failure of Mechanical Trip Cylinder to Latch When Hydraulically Reset.Operations Crew Stabilized Reactor Following Scram ML18039A8021999-06-14014 June 1999 LER 99-002-00:on 990501,SRs for Single CR Withdrawal During Cold SD Were Not Adequately Implemented.Caused by Procedural Inadequacy.Revised Applicable Plant Surveillances.With 990614 Ltr ML18039A8011999-06-14014 June 1999 LER 99-001-00:on 990515,automatic Reactor Scram Occurred Due to Tt.Caused by Failure of Mechanical Trip Cylinder to Latch When Hydraulically Reset.Operations Crew Stabilized Reactor Following Scram.With 990614 Ltr ML20196B8051999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With ML18039A7791999-05-0606 May 1999 LER 99-003-00:on 990408,declared Plant HPCI Sys Inoperable Due to Loose Wire.Caused by Failure to Properly Tighten Screw at Some Time in Past.Loose Wire Was Tightened ML18039A7761999-04-30030 April 1999 Revised Surveillance Specimen Program Evaluation for TVA Browns Ferry Unit 3. ML20206R0731999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Bfnp.With ML18039A7561999-04-23023 April 1999 Bfnp Risk-Informed Inservice Insp (RI-ISI) Program Submittal. ML18039A7671999-04-0808 April 1999 Rev 0 to TVA-COLR-BF2C11, Browns Ferry Nuclear Plant Unit 2 Cycle 11 Colr. ML18039A7461999-04-0707 April 1999 LER 99-001-00:on 990308,determined That Two Trains of Standby Gas Treatment (SGT) Were Inoperable.Caused by Trip C SGT Blower Motor Breaker.Initiated Shutdown of Plant,Reset C SGT Blower Motor Breaker & Declared Train Operable ML20205N8341999-04-0101 April 1999 Part 21 Rept Re Automatic Switch Co Nuclear Grade Series X206380 & X206832 Solenoid Valves Ordered Without Lubricants That Were Shipped with Std Lubrication to PECO & Tva.Affected Plants Were Notified ML20205F9341999-04-0101 April 1999 Safety Evaluation Authorizing Licensee 990108 Relief Request PV-38,from Requirements of ASME BPV Code Section XI IST Testing,Valve Program for Plant,Units 1,2 & 3 ML20205T5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bfnp.With ML20205S0601999-03-31031 March 1999 Rept on Status of Public Petitions Under 10CFR2.206 with Status Change from Previous Update,990331 ML20205S0661999-03-31031 March 1999 Rept on Status of Public Petitions Under 10CFR2.206 with No Status Change from Previous Update,990331, Atlas Corp ML18039A7361999-03-11011 March 1999 Rev 4 to TVA-COLR-BF2C10, Bfnp,Unit 2,Cycle 10 Colr. ML20204C7891999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With ML18039A6951999-02-19019 February 1999 LER 99-002-00:on 990122,LCO Was Not Entered During Calibration Testing of 3D 480 Volt Rmov Board.Caused by Personnel Error.Tva Has Briefed Operations Personnel to Preclude Recurrence of Event.With 990219 Ltr ML18039A6871999-02-12012 February 1999 LER 99-001-00:on 990114,Unit 3 HPCI Was Noted Inoperable. Caused by Oil Leak on Stop Valve.Corrective Maint Was Performed to Repair Oil Leak.With 990212 Ltr ML18039A6931999-02-0303 February 1999 Rev 3 to TVA-COLR-BF2C10, Bfnp Unit 2 Cycle 10 Colr. ML18039A6941999-02-0303 February 1999 Rev 1 to TVA-COLR-BF3C9, Bfnp Unit 3 Cycle 9 Colr. ML18039A6671998-12-31031 December 1998 LER 98-004-00:on 981202,SR Intent Was Not Adequately Implemented.Caused by Procedural Inadequacy.Revised Procedures to Provide Proper SR Implementation.With 981231 Ltr ML18039A6661998-12-31031 December 1998 Ro:On 981215,HRPCRM 2-RM-90-273C Was Declared Inoperable. Caused by Downscale Indication.Containment RM Will Be Utilized as Planned Alternate Method of Monitoring Until Hrpcrm 2-RM-90-273C Can Be Returned to Operable Status ML20199K8951998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Browns Ferry Nuclear Plant.With ML20199F2721998-12-31031 December 1998 ISI Summary Rept (NIS-1), for BFN Unit 3,Cycle 8 Operation ML18039A6471998-12-15015 December 1998 LER 98-007-00:on 981116,unplanned ESF Following Loss of 4kV Unit Board 3B Occurred.Caused by Temporary Energization of Lockout Relay on 4kV Unit Board 3B When Resistor on Relay Monitoring Lamp Circuit Shorted.Replaced Resistor ML18039A6371998-12-0707 December 1998 LER 98-006-00:on 981116,MSSR Valves Exceeded TS Setpoint Tolerance.Caused by Pilot Valve Disc/Seat Bonding. Installed SRV Pressure Switches During Unit 3,cycle 8 Outage.With 981207 Ltr ML20199F2791998-12-0303 December 1998 Bfnp Unit 3 Cycle 8 ASME Section XI NIS-2 Data Rept ML20198D9621998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bfn,Units 1,2 & 3. with ML18039A6071998-11-12012 November 1998 LER 98-005-00:on 981014,mode Changes Not Allowed by TS 3.0.4 Were Made During Reactor Startup.Caused by TS LCO 3.0.4 Not Being Properly Applied.Training Info Memo Re Proper Application for TS LCO 3.0.4 Was Prepared.With 981112 Ltr 1999-09-30
[Table view] |
Text
. .. . _. - _ -
OPERATIONAL
SUMMARY
I DECEMBER 1995 BROWNS FERRY 1 Unit 1 remains shutdown on administrative hold to resolve various TVA and NRC concerns. Unit 1 has been on administrative hold since June 1, 1985. As a result, TVA considers that accrual of reporting hours is suspended since the unit has a maximum dependable capacity of 0 MWe. Accordingly, TVA does not consider cumulative reporting period hours for the period beginning June 1, 1985, when calculating the operating status variables.
BROWNS FERRY 2 During the month Unit 2 operated at a capacity factor of 100 percent and generated 815,180 megawatt hours gross electrical power. As of December 31, 1995, Unit 2 has operated continuously for 133 days.
i l
BROWNS FERRY 3 After being shutdown and on administrative hold since i June 1, 1985, the Unit 3 reactor was restarted and declared critical at 1203 hours0.0139 days <br />0.334 hours <br />0.00199 weeks <br />4.577415e-4 months <br /> on November 19, 1995. Power ascension testing was completed for Unit 3 on December 14, 1995. During the month Unit 3 operated at a capacity factor of 94.5 percent !
and generated 766,410 megawatt hours gross electrical power. j As of December 31, 1995, Unit 3 has operated continuously for 33 days, a
l i
l i
I 9601190326 960112 PDR ADOCK 050GO259 9 R pop '
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-259 1 UNIT: BROWNS FERRY l !
PREPARED BY: T. R. Smith TELEPHONE: 205) 729-2955 MONTH DECEMBER 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 16 0 2 0 17 0 l 3 0 18 0 4 0 19 0 5 0 20 0 6 0 21 0 I
7 0 22 0 j i
8 0 23 0 9 'O 24 0 10 0 25 0 11 0 26 0 12 0 27 0 13 0 28 0 14 0 29 0 15 0 30 0 31 0
l AVERAGE DAILY UNIT POWER LEVEL.
DOCKET NO: 50-260 UNIT: BROWNS FERRY 2 PREPARED BY:. T. R. Smith TELEPHONE: (205) 729-2955 MONTH DECEMBER 1995 DAY- AVERAGE DAILY-POWER LEVEL DAY AVERAGE. DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 -1084 16 999 2 1088 17 1072 3 1086 18 1079 4 1086 19' 1085 5 1013 20 1082 i
6 856 21 1079 i 7 1086 22 1087 8 1082 23 1082 j
9 1075 24 1084 10 1081 25 1082 Il 1084 26 1078 12 1085 27 1086 l i
13 1084 28 1081 14 1083 29 1075 15 1082 30 1083 31 1084
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-296 UNIT: BROWNS FERRY 3 PREPARED BY: T. R. Smith TELEPHONE: (205) 729-2955 MONTH DECEMBER 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 530 16 1094 2 661 17 1089 3 947 18 1093 l
4 711 19 1099 5 690 20 1096 6 913 21 1085 7 820 22 1102 8 955 23 1096' l
9 1096 24 1091 1 10 1083 25 1093
'11 1097 26 1086 12 1098 27 1100 13 1012 28 1099 14 988 29 1085 15 1096 30 1095 31 '1093
s UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-259 REPORT MONTH: DECEMBER 1995 UNIT: BROWNS FERRY l PREPARED BY: T. R. Smith '
TELEPHONE: (205) 729-2955 Method of License Duration Shutting Event System Component cause and Corrective Action to Prevent No. Date Type' (Mours) Reason' Doun Reactor' Report No. Cod / Code' Recurrence 1 06/01/85 S 744 F 4 Administrative hold to resolve various TVA and NRC concerns.
i I
'F-Forced 'A-Equipment Failure (Explain)
- Method: ' Instructions for Preparation of Licensee S-Scheduled B-Maintenance or Test 1-Manual Event Reports (NUREG-1022)
C-Refueling 2-Manual Scram D-Regulatory Restriction 3-Automatic Scram E-operator Training and License Examination 4-Continuation of Existing Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other M-Other (Explain)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-260 REPORT MONTH: DECEMBER 1995 UNIT: BROWNS FERRY 2 PREPARED BY: T. R. Smith ~
TELEPHONE: (205) 729-2955
,a Method of License Duration St.utting Event System Component Cause and Corrective Action to Prevent No. Date Type' (Hours) Reason
- Report No. Code' Code' Recurrence N/A
'F-Forced A-E @ipment Failure (Explain) ' Method: ' Instructions for Preparation of Licensee S-Scheduled B-Maintenance or Test 1-Manuel Event Reports (NUREG-1022)
C-Refueling 2-Manual Scram D-Regulatory Restriction 3-Automatic Scram E-operator Training and License Examination 4-Continuation of Existing Outage F-Administrative 5-Redaction G-Operational Error (Explain) 9-Other H-Other (Explain)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-296 REPORT MONTH: DECEMBER 1995 ~
UNIT: BROWNS FERRY 3 PREPARED BY: T. R. Smith TELEPHONE: (205) 729-2955 ..
Method of License Duration Shutting Event System Component Cause and Corrective Action to Prevent No. Date Type' (Hours) Reason' Down Reactor' Report No. Code' Code' Recurrence 6 12/04/95 S 42 8 5 Redxed power to 55% for Feedtsster tuning.
'F+ Forced 'A-Equipment Failure (Explain) ' Method: ' Instructions for Properation of Liscensee S-Sche &ted B-Maintenance or Test 1-Manuel Event Reports (NUREG-1022)
C-Refueling 2-Manuel Scram D-Regulatory Restriction 3-Automatic Scram E-Operator Training and Liscense Examination 3-Automatic Scram F-Adninistrative 4-Continuation of Existing Outage i G-Operational Error (Explain) 5-Reduction H-Other 9-Other
DOCKET: 50-259 UNIT: BROWNS FERRY l PREPARED BY: T. R. SMITH TELEPHONE: (205) 729-2955 OPERATING STATUS
- 1. Unit Name: BROWNS FERRY UNIT 1
- 2. Reporting Period: DECEMBER 1995
- 3. Licensed Thermal Power (MWt): 3293
- 4. Nameplate Rating (Gross MWe): 1152
- 5. Design Electrical Rating (Net MWe):
~
1065
- 6. Maximum Dependable Capacity (Gross MWe): 0
- 7. Maximum Dependable Capacity (Net MWe): 0
- 8. If Changes occur in capacity Ratings (Items Number 3 Through 7) Sir.ce Last Report, Give Reason: N/A ;
- 9. Power Level To Which Restricted, If Any (Net MWe): 0
- 10. Reason For Restrictions, If Any: Administrative Hold ,
l l
1 THIS MONTE YEAR TO DATE CUNULATIVE*
- 11. Hours in Reporting Period 0 0 95743
- 12. Hours Reactor Was critical 0 0 59521
- 13. Reactor Reserve Shutdown Hours 0 0 6997
- 14. Hours Generator On Line 0 0 58267
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thernal Generation (MWh) 0 0 168066787
- 17. Gross Electrical Generation (MWh) 0 0 55398130
- 18. Net Electrical Generation (MWh) 0 0 53796427
- 19. Unit Service Factor 0 0 60.9
- 20. Unit Availability Factor 0 0 60.9
- 21. Unit Capacity Factor (MDC Net) 0 0 52.8
- 22. Unit Capacity Factor (DER net) 0 0 52.8
- 23. Unit Forced Outage Rate 0 0 25.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
- 25. If Shut Down At End Of Reporting Period, Estimated Date of Startup: To be determined
- Excludes hours under administrative hold (June 1, 1985 to present)
OPERATING DATA REPORT I
1 DOCKET: 50-260 1 UNIT: BROWNS FERRY 2 PREPARED BY: T. R. SMITH TELEPHONE: (205) 729-2955 l OPERATING STATUS
- 1. Unit Name: BROWNS FERRY UNIT 2
- 2. Reporting Period: DECEMBER 1995 ;
- 3. Licensed Thernal Power (MWt): 3293 l
- 4. Nameplate Rating (Gross MWe): 1152
- 5. Design Electrical Rating (Net MWe): 1065
- 6. Maximum Dependable Capacity (Gross MWe): 1098.4
- 7. Maximum Dependable Capacity (Net MWe): 1065
- 8. If Changes occur in capacity Ratings (Items Number 3 Through 7) Since Last Report, Give beason: N/A l
- 9. Power Level To Which Restricted, If Any (Net MWe): N/A
- 10. Reason For Restrictions, If Any: N/A THIS MONTE YEAR TO DATE CIECLATIVE*
- 11. Hours in Reporting Period 744.0 8760 130831 (
- 12. Hours Reactor Was Critical 744.0 8652 90779
- 13. Reactor Reserve Shutdown Hours 0.0 0 14200
- 14. Hours Generator On Line 744.0 8628 88488
- 15. Unit Reserve Shutdown Hours 0.0 0 0
- 16. Gross Thermal Generation (MWh) 2419486.0 28171417 259340332
- 17. Gross Electrical Generation (MWh) 815180.0 9422140 86165318 ,
- 18. Net Electrical Generation (MWh) 796113.0 9197035 83786871 f
- 19. Unit Service Factor 100.0 98.5 67.6 1
- 20. Unit Availability Factor 100.0 98.5 67.6
- 21. Unit Capacity Factor (MDC Net) 100.5 98.6 60.1
- 22. Unit capacity Factor (DER net) 100.5 98.6 60.1
- 23. Unit Forced Outage Rate 0.0 1.5 16.0
- 24. Shutdowns Scheduled Over Next 6 Months Refueling Outage: March 23, 1996, 30 days
- 25. If Shut Down At End Of Reporting Period, Estimated Date of Startup: N/A Excludes hours under administrative hold (June 1, 1985 to May 24, 1991)
. - _. . - . . _ - .-. _- . . ~
OPERATING DATA REPORT l
DOCKET: 50-296 UNIT: BROWNS FERRY 3 PREPARED BY: T. R. SMITH TELEPHONE: (205) 729-2955 ,
l
)
l OPERATING STATUS i
- 1. Unit Name: BROWNS FERRY UNIT 3
- 2. Reporting Period: DECEMBER 1995
- 3. Licensed Thermal Power (MWt): 3293
- 4. Nameplate Rating (Gross MWe): 1152
- 5. Design Electrical Rating (Net MWe): 1065
- 6. Maximum Dependable Capacity (Gross MWe): 1098.4
- 7. Maximum Dependable capacity (Net MWe): 1065
- 8. If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report,-Give Reason: N/A
- 9. Power Level To Which Restricted, If Any (Net MWe): N/A
- 10. Reason For Restrictions, If Any: N/A TEIS MONTE YEAR TO DATE CIAE7I.ATIVE*
- 11. Hours in Reporting Period 744.0 1020 74075
- 12. Hours Reactor Was Critical 744.0 989 46295
- 13. Reactor Reserve Shutdown Hours 0.0 0 5150
- 14. Hours Generator on Line 744.0 811 45005
- 15. Unit Reserve Shutdown Hours 0.0 0 0
- 16. Gross Thermal Generation (MWh 2266270.2 2402014 134270281
- 17. Gross Electrical Generation (MWh) 766410.0 790430 44264190
- 18. Net Electrical Generation (MWh) 748625.0 764618 42878627
- 19. Unit Service Factor 100.0 79.5 60.8
- 20. Unit Availability Factor 100.0 79.5 60.8 l
- 21. Unit Capacity Factor (MDC Net) 94.5 70.4 54.4
- 22. Unit Capacity Factor (DER net) 94.5 70.4 54.4
- 23. Unit Forced Outage Rate 0.0 0.0 21.3
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A I
- 25. If Shut Down At End Of Reporting Period, Estimated Date of Startup: N/A
- Excludes hours under administrative hold 1 (June 1, 1985 to November 19, 1995) !