Text
6 OPERATING DATA REPORT DOCKET NO.
50-259 DATE NOVEMBER 87 PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 OPERATING STATUS 1.
Unit Name: BROWNS FERRY UNIT ONE 2.
Reporting period: NOVEMBER, 1987
- 3. Licensed Thermal Power (MWt): 3293 4
Nameplate Rating (Gross MWe): 1152 5.
Design Electric Rating (Net MWe): 1065
- 6. Maximum Dependable Capacity (Gross NWe): 1098.4
- 7. Maximum Dependable Capacity (Net MWe): 1065 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A 9.
Power Level To which Restricted. If Any (Net MWe): N/A
- 10. Reason For Restrictions, If Any: N/A THIS YEAR-TO MONTH DATE CUMULATIVE
- 11. Hours In Reporting Period 720.0 8016 116936
- 12. Hours Reactor Was Critical 0.0 0
59521
- 13. Reactor Reserve Shutdown Hours 0.0 0
6997 14 Hours Generator On Line 0.0 0
58267
- 15. Unit Reserve Shutdown Hours 0.0 0
0
- 16. Gross Thermal Generation (MWh) 0.0 0
168066787
- 17. Gross Electric Generation (MWh) 0.0 0
55398130
- 18. Net Electric Generation (MWh)
-1351.0
-28665 53682955
- 19. Unit Service Factor 0.0 0.0 49.83
- 20. Unit Availability Factor 0.0 0.0 49.83
- 21. Unit Capacity Factor (MDC Net) 0.0 0.0 43.11
- 22. Unit Capacity Factor (DER Net) 0.0 0.0 43.11
- 23. Unit Forced Outage Rate 100.0 100.0 40.68 24 Shutdowns Scheduled Over Next 6 Month (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Reporting Period, Estimated Date Of Startup:
CR; vision 8808290343 800015 6
h,DR ADOCK 05000259 F
PNV A
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-259 Unit One DATE 12-01-87 COMPLETED BY J.D. Crawford TELEPHONE (205)729-2507' MONTH November 1987*
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL ~
(MWe-Net)
(MWe-Net) 1
-2 17
-3 2
-2 18
-3 3
-2 19
-2 4
-2 20
-1 5
-2 21
-2 6
-1 22
-2 7
-1 23
-3 8
-2 24
-2 9
-1 25
-2 10
-1 26
-3 11
-1 27
-2 12
-1 28
-2 13
-1 29
-2 14
-3 30
-2 15
-1 31 1
16
-4 INSTRUCTIONS on this format. list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
- Complete Revision (9/77)
rua ns:A (ONMau NUCLEAR PLANT OPERATING STATISTICS Browns Ferry Nuclear Plant i
Period Hours 790 Month November 1987 Item No.
Unit No.
Unit ]
Unit 2 Unit 3 Plant Averace Hourly Gross Load. kW 0
0 0
0 2
Maximum Hour Net Generation. MWh 0
0 0
0 3
Core Therrnal Energy Gen, GWD (tl2 0
0 0
0 4
Steam Gen. Thermal Energy Gen., GWD (t)2 j
5 Gross Electrical Gen., MWh 0
0 0
0 x
6 Station Use, MWh 1351*
3156 4014 8539*
7 Net Electrical Gen., MWh
-1351*
-3156
-4014
-8539*
8 Station Use, Percent 0
0 0
0 9
Accum Core Avg. Exposure, MWO/Tonl 0
0 0
0 6
10 CTEG This Month,10 BTU 0
0 0
0 SGTEG This Month,106 BTU I?
13 Hours Reactor Was Criticai 0
0 0
0 14 Unit Use, Hours Min.
O O
O O
15 Capacity Factor, Percent 0
0 0
0
}
16 Turbine Avail. Factor. Percent O
O 100 33.3 17 Generator Avail. Factor Percent O
O 100 33.3 4
f 18 Turbocen Avail. Factor. Percent O
O 100 33.3 h
19 Reactor Avail. Factor. Percent O
O 100 ll 1 2
20 Unit Avail. Factor. Percent O
O O
O 21 Turbme Startuos O
O O
O 22 Reactor Cold Startuns O
O O
O 9
g 24 Gross Heat Rate,8tu/kWh O
O O
O g
25 Net Heat Rate,8tu/kWh O
O O
O 1
26 C
77 g
23 Throttle Pressure, osig O
O O
O 29 Throttle Temp ature. 'F 0
0 0
0
- 8 30 Exhaust Prests. InHg Abs.
O O
O O
3 E
31 Intake Wates emo.. *F 0
0 0
- _Q_,
H 32 33 Main Feedwater, M lb/hr i
34 35 36 37 Full Power Capacity, EFPo (3) fai f41 (di 38 Accum. Cycle Full Power Days, EFPD fai f41 (a)
N 39 Oil Fired for Generation, Gallons 12,780 5
40 Oil Heatina Value. Btu / Gal.
139,800 41 D,en! Generation. MWh 1680.0 17 Mas. Hour Net Gen.
Max. Day Net Gen.
Load MWh Time Date MWh Date Factor, %
a 43 0
0 0
Remarks: A For 8FNP this value is MWD /STU and for SONP anci WisNP this value is MWD /M TU.
l
~ 2(t) iridicates Thermal Energy.
9 3 Information furnished by Reactor Analysis Group, Chattanooga.
3 4 Administrative hold.
/-